Basement earth work labor:
Three people X 5 day’s X Rs.900
Materials for Masonry work
Sand 5 unit X Rs,2,700
Cement 35 bags X Rs.280
Bricks 5,000no X Rs. 3.30
Rubbing stone for basement
3 load per load Rs.6,500
Iron Rood for Leach pit Cement slaps
8 mm and 6mm / Rs.4,500
13,500
9,800
16,500
19,500
2,200
Materials for Roof work
Roof wood 4” X 3” / 12 feet X 8 no X Rs. 375
Tin Sheet 15 no X Rs. 350
Plain tin sheet 27 sqr feet X Rs.11
Nails 2 Kg X Rs.120
Roof washers ( Gi and tar)
2 Doors and 2 windows
Doors 2no X Rs. 900
Windows 2no/ 4” X 3” 12 feet 3no X 375
Door frame wood 4” X 3” 12feet X 4no X 375 / 3,000
5,250
297
240
100
1,800
1,125
1,500
Transporting expenses:
Lorry fright and load man coolie
Bike petrol for 4 weeks / 650
1,000
Salary for masonry work:
Mason salary per day Rs. 300 X 23 days
Mason helper salary
(three helpers 300 per day X 23 days) / 6,900
20,700
Salary for Carpentry work:
Carpenter salary per day Rs.300 X 9days
Carpenter helper salary
helpers Per day Rs. 250 X 9days / 2,700
2,250
Electrical Materials’
Electricity Board New connection Deposit
Sanitary materials
Labor:
Electrician labor Per day Rs.300 X 4 days
Electrician helper labor per day Rs. 250 X 4 days / 3,530
7,000
1,250
1,200
1,000
Plumping materiel’s
Sintax water tank 3,000 lit
¾ inch pipe 3no X 490
½ inch pipe 1 no X 370
Pipe fittings
Labor:
Plumper labor per day Rs.300 X 3days
Plumper helper per day Rs.250 X 3 days / 11,700
1,470
370
700
900
750
Water connection to township supply / 7800
JCB equipment rental for leveling land / 3900
Total costs / 155082