1 / (a) / Coordinate with CBS ET-ABO on Work Plan & Budget / Ch-TT-AO, SO/ARO /
- Rep. of TT to attend ET-ABO meetings;
- Work Plan & Budget for 2014-15 to be compiled & approved.
- Regular Work Plan WebEx sessions to be held.
Report to TT-AO / Q3 2013 / Ongoing / 50 /
- May require TF funding for member of TT to attend ET-ABO-1
- Chair attended ET-ABO-1
2 / (a) / Meeting of TT-AO / Ch-TT-AO, SO/ARO / Meeting of TT-AO, Feb 2014 /
- Work Program advanced;
- Report to CIMO
3 / (b) / Investigate AMDAR Temperature Bias / S.d.Haan /
- Review of relevant reference material
- Consultation with avionics/sensor experts
Ref: WMO AMDAR Panel Aircraft Observing System Data Management Workshop, Section 5.1,
4 / (b) / AMDAR and water vapor measurement (WVM) integration into existing avionics and airframesDevelop and Implement plan for AMDAR and WVSS integration into avionics and airframes / A.Hoff,
SO/ARO /
- Drafting and review of plan.
- Finalise plan as part of the ABOP Strategy & Implementation Plan (A-SIP)
Q2 2014 / 25 / This needs to be harmonized with the the ASIP.
Ref: WMO AMDAR Panel Session 15 Fin. Rep. 4.2.1.
Incorporate:
- Ownership of STCs
- Collaboration on STC costs
- Integration into airframes
Ref: WMO AMDAR Panel Session 15 Fin. Rep 4.2.1.
55 / (b)(b) / AMDAR and water vapor measurement (WVM) as standard accessory on commercial aircraftWVSS Implement. Plan & Project / A.Hoff A.Hoff /
- Drafting and review of plan.
- Finalise plan as part of the ABOP Strategy & Implementation Plan (A-SiP)
- Formulation of IP into WMO Project in collaboration with ICAO
Ownership of STCs
Collaboration on STC costs
Integration into airframes
AMDAR Software requirements
Formulation of IP into WMO Project in collaboration with ICAO
Ref: WMO AMDAR Panel Session 15 Fin. Rep 4.2.1.
6 / (b) / Turbulence (EDR ) Implement. in AMDAR - Develop IP for EDR / G Meymaris,
TT-AO as required /
- Drafting and review of plan.
- Teleconferencing of collaborators. Liaise with NCAR on software requirements;
- Identify possible airline partner for trial.
- A trial program with a European airline (the E-AMDAR Team are discussing possibility with Air France).
7 / (b) / Review & approve EDR spec. in AMDAR Onboard Software Functional Requirements Specification (AOSFRS) / S.Taylor, A.Hoff, G.Fournier, J.Xu /
- Review EDR algorithms within the AOSFRS.
- Linked to Task 9.
- AOSFRS pub. as IOM Report 114.
8 / (b) / Study on Current & Future Comms & Technology Impact on AMDAR / SO/ARO, S.Taylor /
- Write Statement of Work
- Identify consultants
- SSA in place
9 / (c) / Finalise and publish AOSFRS[1] / S.Taylor, A.Hoff, G.Fournier, J.Xu /
- Conduct final review of AOSFRS;
- Publish AOSFRS as approp.
- In combination with ET-ABO;
- Final review of spec.;
- Publication of spec;
- AOSFRS pub. as IOM Report 114?
10 / (c) / Approach to avionics manufac. re AOSFRS implem. / S.Taylor, SO/ARO /
- Approach Teledyne Controls re AOSFRS implementation;
- Approach other avionics vendors
11 / (c) / Boeing 777 AMDR Software Dev. / Ch-TT-AO, Ch/ET-ABO, SO/ARO, /
- Finalise negotiations with AFR and KLM in consult. with E-AMDAR & Meteo-France
- Review quotation;
- Provide advice on specifications and requirements.
(delayed – next AFR-KLM meeting to be finalized) / 20 /
- Combined action with ET-ABO
- Project has been delayed
12 / (c) / Develop and specify standard for AMDAR Data Optimisation System / S.Taylor,
A Hoff /
- Determine requirements (consult with FPs);
- Draft specification;
Publish spec. / Addition to CIMO Guide (spec of ADOS). / Q3 2013 / Q4 2014 / 0 / The aim is to develop a functional specification that can be included in the Manual on WIGOS or in CIMO Guide
13 / (d) / Monitor & Review reports from WVSS testing / A.Hoff /
- Review reports.
- Report to TT-AO-1
14 / (d) / Monitor & report on impact assessment results of TAMDAR humidity & other parameters by UKMO / G.Fournier,
G Meymaris /
- Review reports and analyse results.
- Report to TT-AO-1
15 / (e) / Develop plans for AMDAR & WVSS inter-comparison / S.d.Haan /
- Determine requirements;
- Analyse options;
- Draft Plan.
16 / (e) / Prepare a paper on the status of WVSS-II validation /
- B. Ford & Collaborators
- Prepare outline and scope
- Identify contributors
- Research and draft
- Review
- Publish
17 / (f) / Review & Update Aircraft-based Obs Reg. Mat. In CIMO Guide / G.Fournier, J.Xu
S.Taylor, SO/ARO /
- Review current status of material and identify requirements for update;
- Coordinate & undertake update;
- Review and complete;
- Provide to WMO Reg. Mat. Board.
- Chapter has been submitted to CIMO Ed. Board
18 / (g) / Attend meetings of relevance to AMDAR Technical Dev. / TT-AO, SO/ARO / Meetings attended.
Reports produced for CIMO and Secretariat / Q2 2013 / Q4 2014Ongoing / Ong.N/A / This may include:
- Meeting with avionics vendors;
- Others.
- SO/ARO & S.Taylor to meet Dec in Offenbach for Task 19.
19 / (c) / Update of AEEC ARINC 620 Specification / S.Taylor, SO/ARO, A. Hoff /
- Work with AEEC DataLink Systems Sub-Committee to updated the Met. Report in the ARINC 620 standard to version 6.
- Will require travel support for work team and to attend AEEC meetings
(Cost of Dec 17/18th meeting) / Item 18 / Item 18
TASK TEAM ON AIRCRAFT-BASED OBSERVATIONS, TT-AO, Terms of Reference
(a)Develop and manage the workplan and associated activities of the TT-AO, as well as the budget for the corresponding expenditure of the AMDAR Trust Fund in line with the Trust Fund’s Terms of Reference, in collaboration with CBS ET-Aircraft-Based Observations;
(b)Oversee the scientific and technical development and maintenance of aircraft-basedobserving systems, from a point of view of instruments and methods of observation, and inform the Commission of latest developments;
(c)Work closely with ET-A1 in conducting the development and maintenance of technical standards associated with aircraft-based observations, and provision of related specifications to meet user requirements; and,
(d)Provide the technical review of approved aircraft-based humidity capabilities,
(e)Liaise closely with ET-A3 for testing and validation of the AMDAR system and aircraft based humidity sensors.
(f)Provide input for updates of the CIMO Guide relevant to aircraft-based observations, including identification of standards for inclusion in the CIMO Guide and other WMO regulatory documents
(g)Assist and provide support for training and outreach activities to support the use of aircraft-based observations
[1]AMDAR Onboard Software Functional Requirements Specification, see: WMO AMDAR Panel Session 15Fin. Rep 4.4.7.