Masterspec/Csi Format Specifications

MASTERSPEC/CSI FORMAT SPECIFICATIONS.SECTION 09 22 23: PORTLAND CEMENT STUCCO.A. Section Includes: Installation of the portland cement stucco as an exterior wall cladding. The extent of stucco base and finish coat assembly is as indicated on the drawings

Master Subcontract Agreement

MASTER SUBCONTRACT AGREEMENT.GENERAL CONTRACTOR: PARKER BROWN, INC.General Contractor and Subcontractor hereby enter into this Master Subcontract Agreement effective ______, 20132. This agreement is entered into by the parties in Canoga Park, California, at Contractor s place of business

AIA Master Specification Format

MASTER SPECIFICATION FORMAT.FOAMED-IN-PLACE MASONRY WALL INSULATION.A. Extent of insulation work is shown on drawings and indicated by provisions of this section.B. Applications of insulation specified in this section include the following

Hazardous Area Classification / Flameproofing

Hazardous Area Classification / Flameproofing.This Technical Measures Document refers to the classification of plant into hazardous areas, and the flameproofing measures that can be adopted for electrical apparatus

0B-Ppd Inspection Checklist and Signature Sheet

Inspection/Review Item.OIT Construction Administration Checklist.Builder shall be responsible for completing the following inspections & reviews and for obtaining OIT approval for Substantial Completion. Where applicable.Inspection/Review Item.Building Cable Tray System.Grounding system

SECTION 07 92 19 Acoustical Joint Sealant

SECTION 13 48 13 Manufactured Sound and Vibration Control Components.Specification for Model IsoBacker.Acoustical Fire Rated Outlet Backer Pad.Kinetics Noise Control.1.01 Related Documents

Raceways and Boxes for Electrical Systems ME- Building Group

Raceways and Boxes For Electrical Systems ME- Building Group.SECTION 260533 - RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS.1.1 RELATED DOCUMENTS.Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division01 Specification Sections, apply to this Section

Project Close-Out Check List

PROJECT CLOSE-OUT CHECK LIST.TASK DESCRIPTION COMPLETED DATE.A. General Requirements.1. Certificate of Substantial Completion (AIA G704) ______.Executed by Designer, Contractor and Owner.2. Inspections Certifications.a. Certificate of Occupancy

Boiler Safety Devices Operation Checklist

RReviewers should - Use Checklists when reviewing any type of VA construction project for the following disciplines.Boiler Safety Devices Operation Checklist.Heating, Ventilating, and Air Conditioning (HVAC).Plumbing, Fire Protection, and Sanitary.Site and Landscape.Steam Distribution

Project Title: Click Here to Enter Text

Project Development Checklist.Project Title: Click here to enter text.Project Location: Click here to enter text.Road or Street Number: Click here to enter text. FA Program: Click here to enter text.Appendix 14.52 Project Development Checklist Page 13 of 13 Revised 5/30/2015

Pre-Construction Meeting Agenda

PRE-CONSTRUCTION MEETING AGENDA.1. Formal - Contractor & Director's Representative.2. Informal - Masonry contractor & design engineer/architect.not official until written.1. Samples Normal Weight non-load bearing cmu, brick and accessories.2. Quality Control & Accessories

Requirements for Roof Coverings

REQUIREMENTS FOR ROOF COVERINGS.1507.1 Scope. Roof coverings shall be applied in accordance with the applicable provisions of this section and the manufacturer's installation instructions.1507.2 Asphalt shingles. The installation of asphalt shingles shall comply with the provisions of this section

Section 07 12 00, Built-Up Bituminous Waterproofing

SECTION 07 12 00 BUILT-UP BITUMINOUS WATERPROOFING.SPEC WRITER NOTE: Delete any item or paragraph not applicable in the section and renumber the paragraphs.This section specifies impervious built-up membranes of bituminous materials used for waterproofing

Section 333100 - Sanitary Utility Sewerage Piping

This master should be used by designers working on Port of Portland construction projects and by designers working for PDX tenants ( Tenants ). Usage notes highlight a few specific editing choices, however the entire section should be evaluated and edited to fit specific project needs

Written Silica Exposure Control Program Example Template

Written Silica Exposure Control Program Example Template.1.0 Applicability and Scope.This Written Exposure Control Plan (Plan) applies to CONTRACTOR X personnel who are potentially exposed to airborne concentrations of respirable crystalline silica (silica)

Three Gorges Dam Overview

Three Gorges Dam Overview.The Three Gorges Dam (TGD) is currently being constructed in China on the Yangtze River. A number of aspects of the project are controversial, and it is unclear whether there will be more benefits or negatives associated with