Project Cost Connector/Importfor SAGE PFW ERP

Project Cost Connector/Importfor SAGE PFW ERP

/ SERVICETECHNOLOGIESCORP.
The leadingprovider of Enhancements & Utilities for
SAGE PFW ERP. /

Project Cost Connector/Importfor SAGE PFW ERP

STC’s PC Connector & Importhas 2 functions 1) It automatically ‘sweeps” the Item Description information in PO/PU Receipts Entry or AP Voucher Entry to the JC Description field during the Receipts posting process. This insures that this information will be available in Project Cost(eliminating the need to go back and research “what that cost item was.” 2) The PC Import automatically imports Project Cost data directly from externally-generated Comma or Tab-Delimited file(s) eliminating the need to “re-key” this data from other systems. The Project Cost entry file (JCCURTRN) is updated.

Connector Processing Information

The Connector consists of two STC Posts – one for PO and one for AP – as follows

STC Print & Post PO Receipts (below)

STC Post Voucher & Debit Memo

To work effectively, these STC Smart Posts must “replace” the “standard” PFW PO Receipt & AP Voucher posts on the Menus (the PFW Administrator should remove the PFW Posts using Security Group Setup). Their processing options mirror those on the standard Posts.

The Connector runs by collecting all the info from the Line Item Description fields on each PO or Voucher. Then during the posting process it writes that Item Description to the Proj Cost “Description” field. in the Project Cost Transaction Entry file (JCCURTRAN)

All products are published by Service Technologies Corp. a Sage Master Developer since 1987. Sage Software disclaims any obligation to test for fitness of use, to make any warranty for, or otherwise vouch for, any of these products. Sage & SagePFW are trademarks of Sage Software Corp. Crystal Reports is a trademark of Business Objects, SA.

STC Project Cost Import automatically imports Project Cost data directly from externally-generated Comma or Tab-Delimited file(s) eliminating the need to “re-key” this data from other systems. The Project Cost entry file (JCCURTRN) is updated (as if it were keyed in PC Transaction Entry). Installation/Configuration is quick and easy with the on-screen mapping matrix

Once configured, PO creation becomes a “one click” process from a pre-saved/pre-mapped Parameter Record. After import, normal PFW Processing procedures (selection, print, post) are followed.

Parameters include the following Options.

Delete or Archive Import files – allows automatic deletion or archiving of source file after the import finishes

Skip First Record – allows an informational header record to be skipped

Default Transaction Date can be user-selected.

Trial Mode report gives a “preview” report to show problems in the file which would prevent a “good” import. (below)

/ All fields of the Project Cost Current Transaction File are available for Import

Trial Mode Report

Contact Your PFW Reseller for Information

Pay-Ware Payroll/ HRIS ● Import/Purge Utilities for A/P, A/R & Bank Book ● Advanced A/P Payments

● Inventory Management ● GL Maintenance ● Order Base Management ● A/R Advanced Reporting

Contact Us:Web: Toll Free Phone: 888-523-5020

E-mail: Fax: 336-768-1602