Plastering (Construction)

Plastering (Construction)

Plastering (Construction)

Level 3

Awarded by Scottish Qualifications Authority and SBATC

Accredited from 10 May 2006to 30 June 2009
Group award number: G891 23
Standards

This SVQ is based on standards developed by ConstructionSkills. ConstructionSkills draw its membership from the Construction Industry.

For further information, please contact the SQA web site.

Structure of the SVQ

The way the SVQ is made up is shown below. The unit title appears in bold and the elements that make up each unit are listed under the unit title.

Mandatory units (all options)

Candidates must complete all of these units:

DX9J 04

Conform to General Workplace Safety

1Conform to general workplace safety

DX9F 04

Confirm Work Activities and Resources for the Work

1Confirm work activities and resources for the work

DX9T 04

Develop and Maintain Good Working Relationships

1Develop and maintain good working relationships

DX9D 04

Confirm the Occupational Method of Work

1Confirm the occupational method of work

D8GA 04

CITB Health and Safety Test

B664 04

Integrative Assessment in the Construction Industry

Plus one of the following optional routes

Solid Plastering Route

Mandatory Units

DY8L 04

Produce Complex Internal Solid Plastering Finishes

1Produce complex internal solid plastering finishes

DY8K 04

Produce Complex External Rendering Finishes

1Produce complex external rendering finishes

Plus any one of the following units

DY2J 04

Install Direct Bond Dry Linings

1Install direct bond dry linings

DY12 04

Install Mechanically Fixed Plasterboard

1Install mechanically fixed plasterboard

Additional Units

Candidates can also choose to complete these freestanding units to complement the award, but they do not form part of the qualification:

DY94 04

Produce Granolithic Paving Work

1Produce granolithic paving work

DY98 04

Produce Specialised Plasterer’s Surfaces

1Produce specialised plasterer’s surfaces

F007 04

Run In-situ Mouldings

1Run in-situ mouldings

Fibrous Plastering Route

Mandatory Units

DY9P 04

Produce Complex Plasterwork Moulds

1Produce complex plasterwork moulds

DY29 04

Install Complex Fibrous Plaster Components

1Install complex fibrous plaster components

Plus any one of the following optional units

F007 04

Run In-sit Mouldings

1Run in-situ mouldings

F003 04

Repair Complex Fibrous Plaster Components

1Repair complex fibrous plaster components

There may be publications available to support this SVQ. For more information, please contact:

Customer Contact Centre

The Scottish Qualifications Authority

The OptimaBuilding

58 Robertson Street

GLASGOW

G2 8DQ

Tel: 0845-279-1000

Fax: 0845-213-5000

Email:

Website: