PROPOSED SCHEDULE OF FEES AND CHARGES

2013/2014 BUDGET

FEES & CHARGES / 2013/2014
DEVELOPMENT SERVICES PLANNING / *indicate GST Free
Development Applications
  1. Determining a development application (other than for an extractive industry) where the development has not commenced or been carried out the estimated cost of the development is:

(a )Not more than $50,000 / $147.00
(b) Not more than $50,000 but not more than
$500,000 / 0.32% of cost of development
(c) More than $500,000 but not more than $2.5
Million / $1,700 + 0.257% for every $1 in excess of $500,000
(d) More than $2.5 million but not more than $5
million / $7,161 + 0.206% for every $1 in excess of $2.5 million
(e) More than $5 million but not more than $21.5
million / $12,633 + 0.206% for every $1 in excess of $2.5 million
(f) More than $21.5 million / $34,196
  1. Determining a development application (other than for an extractive industry) where the development has commercial or been carried out.
/ The fee in item 1 plus by way of penalty, twice that fee.
  1. Determining a development application for an extractive industry where the development has not commenced or been carried out
/ $739.00
  1. Determining a development application for an extractive industry where the development has commenced or been carried out.
/ The fee in item 3 plus, by way of penalty twice that fee
  1. Request for minor amendment of an approved development under $500,000 value.
Request for major amendment to an approved development over $500,000 / $50.00
50% of regular fee with a minimum of $100.00
  1. Preliminary comments on proposals prior to formal lodgement.
/ $50.00*
  1. Variation of Residential Design Codes and
Shire Local Planning Policy
Where the estimated cost of the development is – Not more than $50,000 / $140
-More than $50,000 / $280.00
Subdivision Clearance
  1. Providing a subdivision clearance for:-
(a)Not more than 5 lots
(b)More than 5 lots but not more than 195 lots;
(c)More than 195 lots
Rescheduling of clearance of condition(s)inspection fees (applies where clearance has been previously checked and condition was not complied with and new inspection is required) / $73.00 per lot
$73.00 per lot for the first 5 then $35.00 per lot
$7,393.00
$25.00
Sign Applications
  1. Signage less than or equal 4m²
Signage greater than 4m² / $50.00*
$100.00*
Other
  1. Application for approval of Home Occupation/Home Business/Home Office
/ $222.00
  1. Determining an initial application for the approval of a home occupation where the home occupation has commenced
/ The fee by way of item 10 plus, by way of penalty, twice that fee
  1. Renewal for approval of home occupation/home business/home office
/ $73.00
  1. Determining an application for the renewal of an approval of home occupation where the application is made after the approval has expired
/ The fee in item 12 plus, by way of penalty, twice that fee
  1. Determining on application for change of use or for change or continuation of a non-conforming use to which item 1 does not apply
/ $295.00
  1. Determining an application for the change of use or for an alteration or extension or change of a non-conforming use to which item 2 does not apply, where the change or the alteration, extension or change has commenced or been carried out
/ The fee in item 14 plus, by way of penalty, twice that fee
  1. Providing a zoning certificate
/ $73.00
  1. Replying to a property settlement questionnaire (Planning Only)
/ $73.00
  1. Providing written planning advice
/ $73.00
  1. Section 40 (Liquor Licensing) request
/ $50.00
Publications
  1. Scheme Text
/ $52.00 each incl GST
  1. Local Planning Strategy
/ $52.00 each incl GST
  1. Scheme maps A3
/ $52.00 each incl GST
Town Planning Scheme Amendments
  1. Executive Manager
  2. Senior Planning Officer
  3. Planning Officer
  4. Environmental Health Officer (or other relevant officer)
  5. Administration Officer
/ $88.00
$66.00
$36.86
$36.86
$30.20
Professional Advice
  1. Executive Manager
Senior Planning Officer
Planning Officer
Administration Officer / $192.00 p/h incl GST
$146.00 p/h incl GST
$104.00 p/h incl GST
$73.00 p/h incl GST
Advertising Costs
  1. (a) Letters of Consultation
(b) Onsite Sign
(c) newspaper Advertisement / $125.00
$125.00
Advert cost
Extractive Industry Licences
  1. (a) Extractive Industry Annual Licence Fee
(b) Extractive Industry Licence BGC Quarry
Note: All Planning Fees are exclusive of GST unless otherwise indicated. / $320.00
$1600.00
Development /Subdivision Contributions
  1. Residential Zoned Lot (applicable to Residential Design Codes)
(a)1-5 lots
(b) more than 5 lots / $1,500 per lot
As per endorsed Development Contribution Plan
  1. All other Zone Property
(a) 1-5 Lots
(b)More than 5 lots / $1,000 per lot
As per endorsed Development Contribution Plan

1