Revision March 2011

DON S1000D Change Proposal Form

Document Control Number: (This number to be assigned by your SYSCOM Representative)

DCN-CPF-US_____-20_____-______-_____+___

This DON Change Proposal Form and should be submitted to the SYSCOM S1000D Focal Point. Use a new CPF for each change you think necessary.

Send to:SYSCOM Representative / Originator of CPF:
Organization and address
 NAVAIR AIR 6.8.5
 NAVSEA NSWCCD 2210
 SPAWAR 4.3.3
 USMC MARCORSYSCOM
 ______/ Name:
Phone:
Fax:
e-mail:
Date:
Location in the S1000D specification / S1000D Issue No. / S1000D Issue Change No.
Chapter No. / Para No. / Fig No.
Page No. / Line No. / Table No.
Other Identification

 Additional Locations are Attached. Please see file:

Change you think is necessary (use separate sheet if necessary)

Reason for your change

Proposed BREX Revision:

Proposed Business Rule(s) Revision

Proposed Chapter Revision Draft

Proposed Schema Change Proposal

Proposed Bike Sample Revision

DCN-CPF-US_____-20_____-______-______+ __

1

Worksheet: For use by SYSCOM S1000D Focal Point
(March 2011 Revision)

Document Control Number:

DCN-CPF-US_____-20_____-______-_____+____

(USN, USMC) (Year 4 digit) (NAVAIR, NAVSEA, SPAWAR, USMC) (Seq No. 3 digits + Rev Number)

Note: Sequence Number is assigned starting at 001 by each SYSCOM representative and each year restarts at 001. The year is the Calendar year in which the change is received by the SYSCOM representative.

CPF received by:
Name:______
Email: ______/ Date:
CPF sent for Review within SYSCOM / Date:
CPF sent to other SYSCOMs for Review / Date:
Joint SYSCOM meeting the CPF was considered / Date:
Joint SYSCOMs Decision / (A = Accepted, C = Cancelled, F = Further info required,
M = Modified acceptance, R = Rejected, W = Withdrawn) :

SYSCOMs reply to the CPF

 Need additional Business Case Details Not Applicable to DON
 Need proposed BREX Revision Need proposed Business Rule(s) Revision
 Need proposed Chapter Revision Draft Need proposed Schema Change Proposal
 Need proposed Bike Sample Revision
 Redundant with existing CPF. See CPF _____ - ____-______
 Redundant with existing DCN. See DCN-CPF-US _____ -20 ____-______-_____+__
 Misunderstanding/misintepretation of S1000D.
Explaination: ______
Already handled by Issue ______Chapter_____ of S1000D Specification.
Forwarded to USSMG (Requires SYSCOMs Concurance) Date:
COMMENTS TO THE USSMG
USSMG reply to the CPF
 A = Accepted,  C = Cancelled,  F = Further info required,
 M = Modified acceptance,  R = Rejected,  W = Withdrawn:
 Passed to USSIG for Technical Comments/Sanity Check
Comments from the USSMG on the CPF:
Copy of the CPF was returned to the originator
 Action Complete – CPF Request Closed
 Request originator to correct and resubmit
 Request originator to work with USSIG to refine / Date:

DCN-CPF-US_____-20_____-______-_____+___

1