City of Seattle Invitation to Bid/Request for Proposal ITB-SCL-2912

Addendum

Updated 07/23/12

The following is additional information regarding Invitation to Bid for Proposal# ITB-SCL-2912 titled One (or More) Underground Wire Installation Flatbed Trucks released on 6/29/12. The new due date and time forresponses isAugust 7, 2012, 2:00pm (Pacific). This addendum includes both questions from prospective proposers and the City’s answers, and revisions to the ITB.This addendum is hereby made part of the ITB and therefore, the information contained herein shall be taken into consideration when preparing and submitting a bid/proposal.

Item # / Date Received / Date Answered / Vendor’s Question / City’s Answer / RFP Revisions
1 / 7/3/12 / 7/3/12 / Can the dates to the pre-bid date and the due date be adjusted to July 17th and July 31st respectively? / The new Pre-Bid date will be July 12, 9:00 in Room 4112 / On Page 1 of ITB-SCL-2912 revise the following:
  • Optional Pre Bid Conference from 7/9/12, 2:00pm to 7/12/12, 9:00am
  • Deadline for Questions & Deadline for Toxin List from 7/12/12, 4:00pm to 7/23/12, 2:00pm
  • Sealed Bids Due to the City from 7/23/12, 2:00pm to 7/31/12, 2:00pm

2 / 7/3/12 / 7/3/12 / On Page 1 of ITB-SCL-2912 revise the Title from:
“Two Underground Wire Installation Flatbed Trucks” to:
“One (or more) Underground Wire Installation Flatbed Trucks.
Herein and through all of the ITB-SCL-2912 document and attachments.
3 / 7/3/12 / 7/3/12 / On Page 14 of ITB-SCL-2912, number 3, Mandatory-Specifications and Pricing Offer Sheet (Attachment #2) replace the attached specification with the following:

4 / 7/12/12 / 7/23/12 / On page 4 of the specifications, number 9 under City of Seattle Supplied Chassis, the Chassis spec dimensions do not match the drawing sent out. Please clarify. / The drawing is based off of a 123” cab to axle measurement. This matches the chassis specifications.
5 / 7/12/12 / 7/23/12 / On pages 7 & 8 of the Specifications, under “Tool Boxes Specific,” the tool box size may need to be adjusted as the vendors state the tracking winch needs 48” to install, not 30” shown in the supplied drawing. The size of the toolbox and the bed may need to be modified to accommodate. Please clarify. / On Page 6 of specification, Add line 7 to read:
All top of deck tool box sizes are maximum.
Tool box size may be reduced to accommodate pulling module space requirements.
6 / 7/12/12 / 7/23/12 / On page 8 of the specifications under Section “I” – what should the flow be set at? What should the GPM be set at / If it meets the lifting capacity of the crane, / On page 8 of the specifications under Section “I”, add the sentence “The flow should be set at a maximum of 2200 psi, and the GPM should be set at 6-7.”
7 / 7/12/12 / 7/23/12 / On page 10 of the specifications, under Section 8 – Is an 8mm wire rope acceptable in lieu of 7/16”? It seems that 8mm exceed specs. / Revise Page 10, Line 8 to read:
100' of 3/8" (or metric equal) non spin wire rope.
Wire rope shall be rated for two times the rated lift capacity of the winch while single parted.
8 / 7/12/12 / 7/23/12 / On page 11 of specifications, under “Articulated Crane (starting on pg 9) – Can one hydraulic system be utilized such as a variable pump on demand closed center load sense system? Mounting a second pump is almost impossible and a piggy back pump system will create too much torque on the PTO. New exhaust systems drastically interfere with a second PTO and pump installation. Please clarify. / Yes – both two and one hydraulic systems can be utilized. This chassis is pre-2012 emission and has international EGR type exhaust system. / On page 9 of specifications under Articulated Crane, add in line item “0” to read:
“Both one and two hydraulic systems will be accepted in this bid.”
9 / 7/12/12 / 7/23/12 / On Page 11 of specifications, under “Underground Pulling Module, item #1 – It states that the “Unit shall be mounted directly behind the crane, mounted transverse on frame rails with an optional 90 degree output roller fairlead facing the rear of the vehicle.” Please explain in detail what this is or means. Where is it mounted? / This is an option available from TSE to mount the winch “transverse” 90 degrees from its normal mounting location for better fit to the chassis. This is a roller fairlead that mounts directly to the TSE pulling module output.
Also see #5 on page 13 for further clarification.
10 / 7/12/12 / 7/23/12 / On Page 14 of specifications, Item #6 –“axial piston pump” - Is this actually supposed to be a piston pump? / Yes – the Piston type pump as required by TSE.
11 / 7/12/12 / 7/23/12 / On Page 15 of specifications – Can the vendor use a higher pressure system with a lower flow rating? Can a single hyd system be used in lieu of two pump system? / Yes – a higher pressure system with lower flow is acceptable if using a single hyd. System.
12 / 7/12/12 / 7/23/12 / On Page 17 of specifications under Safety Item #2 – Is the vendor providing outrigger pads? What size of storage is required? / SCL manufactures their own outrigger pads. Storage for two 18” x 18” x 3.5” thick would pads would be required. Please quote all available “poly type” pads from manufacturer as an option. Storage will still be required. / On Page 17 of specifications under Safety Item #2 add the sentence “Storage for two 18” x 18” x 3.5” thick would pads is required.
13 / 7/12/12 / 7/23/12 / On Page 1 of ITB-SCL-2912 revise the following:
  • Sealed Bids Due to the City from 7/31/12, 2:00pm to 8/7/12, 2:00pm