Curiculum VitaeRainer Schommer

Personal details
/ Main skills in SAP-Consulting:
Process-/Integration Consulting, Implementation and training in retail and industry. Optimisation of processes and the supply chain.
Profound knowledge of the SAP-Modules SAP ERP, SAP SCM,SAP Retail (IS-R) (article master; vendor master; purchasing; external /internal purchase orders; seasonal procurement; collective purchase order;requirements planning / replenishment planning in ERP-System and withSAP Forecast & Replenishment (SAP SCM-F&R) and Integration to the Retail-System and SAP Business Warehouse).
A working knowledge in assortment planning and allocation.
Materials Management (MM):Master Data Management, Inventory Management, Physical Inventory, Logistics Execution-Warehouse Management (LES-WM), Sales & Distribution and integration to SAP Finance and Controlling.
Name
/ Rainer Schommer
Corresponding Address
/ Joseph-Teusch-Straße 12, D-50935 Köln
Mobile
/ +49 - 177-5663163
E-Mail /
Homepage /
Qualification / graduate in computer science (business informatics)
Supply-Chain-Specialist
Availability
Mobility / Worldwide
Desired location / Europe
Intern. experiences / Germany, Belgium, Spain
Citizenship / German
Languages / German, English
Skills
SAP Modules / SAP R/2, SAP R/3 (to Rel. 4.7), ECC (to Rel. 6.0), SCM 5.0, SCM 5.1
  • Retail, SCM-F&R (Forecast & Replenishment)
  • MM, LES-WM, PP, PP-PI, SD-WM-Integration, PP-WM-Integration
  • Parts of APO, FI, CO, BC, CA
  • R/2: RM-MAT, RM-PPS

Experience /
  • from 07/08: freelance consultant
  • 02/04 – 06/08:managing consultant at EDS-Itellium GmbH, Essen
  • 07/99 – 01/04: freelance consultant
  • 10/90 – 06/99: senior consultant at SAP AG, Walldorf
  • 05/88 – 09/90: consultant at mbp Software & Systems GmbH, Dortmund

Industries-experience /
  • commerce
  • chemical industry
  • engineering and plant construction
  • utilities
  • consumer poducts

Roles / Consultant, Project-Coordinator, Teamlead, Projectmanager
Responsibilities /
  • process analysis, process design, optimization ofbusiness processes
  • design of rough concepts and finalconcepts
  • feasibility studies preparation
  • prototyping, customizing, documentation
  • planning and processing of „integrated structured walkthroughs“
  • roll-outs, trainings and user-support
  • subproject management and project coordination

SAP projects

COOP, Switzerland

August 09 – today / Commerce
Location / Basel, Switzerland
Release / ECC 6.0, SCM 5.1
Modules / IS-Retail, SCM F&R
Project name
Summary /
  • Conceptiual-Design in the SAP SCM-F&R-Area; Comparison of order proposals in 2 SCM-F&R-Systems, Use of reference articles
  • Preparing and Doing of Functional Tests and Integration Tests in the systems ECC 6.0, SCM-F&R 5.1, Focus of task: Automatic Replenishment of shops
  • Support in daily operation of the F&R system

Languages / Deutsch

Gebr. Heinemann

Nov 08 – March 09 / Commerce
Location / Hamburg, Germany
Release / ECC 6.0, SCM 5.1
Modules / IS-Retail, SCM F&R
Project name / Generation5
Summary /
  • Analysis of processesin Materials Planning
  • Creating Function documents
  • Feasibility studiefor SAP Forecast & Replenishment (SCM-F&R) and the SAP Fashion Functionality
  • Preparation of an “integrated structured walkthrough”

Languages / German

COOP, Switzerland

July 08 – Sept 08 / Commerce
Location / Basel, Switzerland
Release / ECC 6.0, SCM 5.1
Modules / IS-Retail, SCM F&R
Project name
Summary /
  • Supportof the Migration from SCM-F&R 4.1 to SCM-F&R 5.1
  • Preparing and Doing of Functional Tests and Integration Tests in the systems ECC 6.0, SCM-F&R 5.1, Focus of task: Automatic Replenishment of shops
  • Support in daily operation of the F&R system

Languages / Deutsch

KARSTADT Warenhaus GmbH

Feb 04 – June 08 / Commerce; Implementationwith EDS Itellium GmbH
Location / Essen, Germany
Release / SAP R/3 4.7, ECC 5.0, ECC 6.0, SCM 4.0, SCM 5.0, SCM 5.1
Modules / IS-Retail, SCM-F&R, SCM-EM, SAP BI
Project name / FORWARD „Die Karstadt Warenwirtschaft“
Summary /
  • Conceptual-Design (Business Blueprint) in Materials Planning with SAP R/3 and Forecast & Replenishment (SCM-F&R)
  • Conceptual-Design and Functional Test of customer specific enhancements
  • Implementationand Customizing of the integrated system landscape (ERP- and SCM-System)
  • Preparing and Doing ofFunctional Tests andIntegration Tests in the systems SAP R/3 4.7, ECC 5.0, ECC 6.0, SCM F&R 5.0, SCM-F&R 5.1, SCM EM, SAP BI; Focus of task: Automatic Replenishment of warehouses and shops
  • Clearing of error messageswith SAP Solution Manager / SAP Support Portal
  • Support in daily operation of the F&R systemafter Roll-Outs; Interface monitoring und correction of errors

Languages / German

RWE AG

Oct 03 – Jan 04 / Utilities
Location / Essen, Germany
Release / SAP R/3 4.7
Modules / MM
Summary /
  • SAP-R/3 implementation support in the materials management (MM); master data migration, customizing MM

Languages / German

Tegometall

Feb 03 - June 03 / Rack Construction
Location / Lengwil-Oberhofen, Switzerland; Krauchenwies, Germany
Release / SAP R/3 4.7
Modules / MM, LES-WM
Summary /
  • Conceptual design for migration of material stocks due to a reorganisation of the SAP R/3-sales process.

Languages / German

ThyssenKrupp Bilstein

Dec 02 – Jan. 03 / Engineering
Location / Ennepetal, Trier, Germany
Release / SAP R/3 4.7
Modules / MM, LES-WM
Summary /
  • SAP-R/3-Implementation of the warehouse management system.
    Support for end-users at the Go-Live.

Languages / German

Bayer AG

Sep 99 – Nov 02 / Chemical Industry; ImplementationwithPwC Consulting (now IBM Services)
Location / Antwerp,Belgium; Tarragona,Spain; Uerdingen, Dormagen,Leverkusen, Germany
Project name / POINT
Release / SAP R/3 4.6B
Modules / MM, LES-WM,PP-PI, SD, QM, APO-Interface
Summary /
  • SAP R/3 implementation of the global production supply-chain for the Polymere-Division. Roll-Out in Antwerp (Belgium), Tarragona (Spain), Uerdingen, Dormagen, Leverkusen (Germany).
  • Business process analysis, business process definition and implementation of a cross plant MRP including the integration to SAP modules APO, PP-PI, SD and MM.
  • Definition, implementation and documentation of the business scenarios in the whole supply chain.
  • Design, implementation and support for the migration of logistic master data.
  • Testing of the business scenarios. Support for end-users at the roll-out.

Languages / German, English

DeTe Immobilien

Aug 98 – Aug 99 / Real Estate Management
Location / Münster, Germany
Release / SAP R/3 4.6
Modules / MM
Summary /
  • SAP-R/3 implementation in the module MM. Especially the design and realisation of a scenario to implement global purchasing contracts.

Languages / German

Pioneer

Nov 98 – June 99 / Consumer Products
Location / Willich, Germany
Modules / MM, LES-WM, SD, FI, CO
Summary /
  • SAP-R/3-implementation of the materials mangagment and the warehouse management including the intgration to the R/3 modules sales & distribution, finance, controlling and the interface to an external automated high rack warehouse.

Languages / German

RWE

Feb 98 – Aug 98 / Utilities
Location / Essen,Germany
Modules / MM
Summary /
  • SAP-R/3 implementation support, business process analysis and -design, project review in the materials management.

Languages / German

Weidmüller

Oct 97 – Dec 98 / Electrical Engineering Components
Location / Detmold, Germany
Modules / MM, LES-WM, SD
Summary /
  • SAP-R/3 implementation of the materials management and warehouse management including the integration to the R/3 modules production planning and production control, sales & distribution, finance, controlling and the interface to an external automated high rack warehouse.

Languages / German

Herberts (Currently Dupont Performance Coatings GmbH)

Jan 96 – Feb 98 / Chemical Industry
Location / Wuppertal, Germany
Modules / MM, FI, CO
Summary /
  • Implementation of the SAP R/3-purchasing and invoice verification including the integration to the R/3 modules finance, controlling. Design of interfaces to the inventory management of the legacy system.

Languages / German

MAN GHH Borsig

Sep 95 – Dec 97 / Plant Construction
Location / Oberhausen, Germany
Modules / MM, LES-WM, PP, PS, SD, FI, CO
Summary /
  • SAP-R/3 implementation of the materials management and warehouse management including the integration to the R/3 modules project system, production planning and production control, sales & distribution, finance, controlling and the interface to an external automated high rack warehouse.

Languages / German

Hüls AG

Sep 95 – Sep 96 / Chemical Industry
Location / Marl, Germany
Modules / MM, LES-WM, ALE
Summary /
  • Integration consulting to implement the R/3 warehouse management as a local system with connection to a fork lift control system via ALE-interface.

Languages / German

Hermann Wärmesysteme

Jan 95 – Aug 95 / Commerce
Location / Schwerte, Germany
Modules / MM, LES-WM, SD
Summary /
  • Business process analysis and business process reengineering of SAP-R/3 processes in materials management and warehouse management.

Languages / German

Wilo

April 94 – Dec 94 / Engineering
Location / Dortmund, Germany
Modules / MM, LES-WM, SD, ALE
Summary /
  • Integration consulting and implementation of the SAP-R/3 modules warehouse management and inventory management with connection to an automated high rack warehouse with a local control system via ALE-interface.

Languages / German

SAP AG

Jan 93 – March 94 / Provider of Business Software
Location / Walldorf, Germany
Summary /
  • Internal SAP-Project at the development department in Walldorf, Germany.
(Development of a local R/3-production control center)
  • My job: Analysis of customer requirements, Coordination of the customer requirements with the development department, sales support.

Languages / German

MiscellaneousCustomers of SAP AG

Oct. 90 – Dec 92
Location / Germany
Summary /
  • Diverse consulting projects in SAP-R/2-RM-MAT resp. R/2-RM-PPS- environment for engineering companies and telecommunications companies.

Languages / German

- 1 -