H.NO 91,SECTOR C,STREET NO 11,SAFARI HOMES,PHASE 8.BAHRIA TOWN,ISLAMABAD
CELL: 0345-9058311
ENGR.Zeeshan najam
CHIEF EXECUTIVE OFFICER/ OWNER ULTIMATE ENGINEERING
CONSULTANT.
pROFESSIONAL ENGINEER (PEC REG: ELECT/15151)
objective
TO HAVE A BOOMING, PROSPEROUS AND A PURPOSEFUL CAREER IN WHICH I CAN UTILIZE MY POTENTIAL, SKILLS AND INSIGHT TO THE BEST OF MY ABILITY IN ORDER TOFACILITATE MY PROSPECTIVE ORGANISATION IN EVERY WAY POSSIBLE.
Functional summary
I HAVE WORKED IN VARYING CAPACITIES IN DIVERSE WORK ENVIRONMENTS WITH ACOMPELLING DESIRE TO GIVE MY BEST TO EVERY TASK I HAVE BEEN ASSIGNED with. I HAVE TRIED TO DRAW OUT SUBSTANTIAL PROFESSIONAL ADVANTAGE WITH EVERY RESPONSIBILITY I HAVE BEEN ENTRUSTED.
Work Undertaken that best illustrates Capability to Handle the Task Assigned1) / Name of Assignment or Project: / Solarization of Civil Secretariat (Pilot Project Planning and Development Department, KPK)
Cost of Project: / 1.49 Million
Start Date to Completion Date: / December-2014 to June 2015
Total Time: / 6 months
Client: / Energy and Power Department, KPK
Location: / Civil Secretariat, Peshawar
Main Project Features: / Designing and supervision of solar base electricity system. System Capacity is 75KW
Positions Held: / Project Manager
Activities Performed: / Site survey, Energy Audit, designing of solar system, preparation of bidding documents, contract agreement, activity base schedule and supervision site work
2) / Name of Assignment or Project: / Solar Energization of Various Jails in KPK.
Cost of Project: / 9.5 Million
Start Date to Completion Date: / Feb-2014 to June-2015
Total Time: / 15 Months
Client: / Home & Tribal Affairs Department, KPK
Location: / All Over KPK
Main Project Features: / Project site data collection, designing, bid document preparation, bid evaluation and supervision of solar system. Capacity of 1.9MW
Positions Held: / Team Leader
Activities Performed: / Site survey, designing of solar system, activity base schedule and supervision site work
3) / Name of Assignment or Project: / Solarization of Existing Water Supply Scheme in Public Health Engineering Department ( PHED) KPK
Cost of Project: / approx 6 Million
Start Date to Completion Date: / Jan-2014 to June-2016
Total Time: / 16 Months
Client: / Public Health Engineering Department, KPK
Location: / All Over KPK
Main Project Features: / Project site data collection, designing solar water pumping system, bid document preparation, bid evaluation and supervision of solar system
Positions Held: / Team Leader
Activities Performed: / Site survey, designing of solar system, activity base schedule and supervision site work
Summary of qualifications
- PHD ScholarIN POWER ELECTRONICS AND RENEWABLE ENERGYSOLAR(2010-TILL DATE)
IIUI ISLAMABAD(TAKEN EXTRA CREDITS IN Electrical POWER Engineering Stream.)
COURSES STUDIED AT POSTGRATUDE LEVEL
- ENERGY FORECASTING AND MODELLING
- ADVANCED POWER ELECTRONICS.
- ENERGY RESOURCES.
- POWER GENERATION.
- POWER CONVERTORS AND INVERTORS.
- MASTERS IN ELECTRICAL ENGINEERING. (2006-2009)
NWFP UET PESHAWAR.
- BSc IN ELECTRICAL AND ELECTRONICS ENGINEERING. (1993-1998)
NWFP UET PESHAWAR.
EMPLOYMENT HISTORY
I have provided full time coNsultancy AS SOLAR DESIGN ENGINEER IN Sami & SamiEnterprises PEshawar CAntt, PESHAWAR from 2000 to MARCH 2014.i have performed on the following area of expertiserelated to the solarSYSTEMS FOR ELECTRIFICATION;
1) DESIGNING OF SOLAR PANELS
2) TESTING OF SOLAR PANELS
3) INSTALLATION OF SOLAR PANELS
4) COMMISSIONING of solar panels
DIVERSE EXPERIENCES
- WORKING AS A TEAM LEAD FOR A SLUM SCHOOL PROJECT NEAR IIUI.
- Worked as a Sales and Promotion Officer for a Private health Food Firm.
- Worked as a Promotion Manager for a Family Business.
- worked in the establishment of an n.g.o for youth affairs advisor
PROJECTS SUPERVISED
- 3 projects on PiezoElectric Energy Harvesting
- 3 projects on Micro hydel.
- 2 projects on Wireless power Transfer
- 2 PRojects on Integrated Wind and SOlar
- 2 projects on smart metering
- WiND energy
- Micro Grid
- WIMAX MODULE INTEGRATION WITH WIRELESS LAN AND WIFI WITH PERFORMANCE EVALUATION.
- REAL TIME OBJECTS TRACKING USING LASERS.
- GSM BASED STOCK MONITORING.
- LINE FOLLOWING ROBOT FORSECURITY (WITH IMAGE CAPTURING).
- POSITION CONTROL OF ANTENNA GSM TECHNOLOGY
ENERGY RELATED PROJECTS
i am currently involved in the
1. I have worked on the design of the solar pumps for water extraction in water scarce area.
2. I have Worked on microcontroller based equipment, handling professional microcontroller based projects for SAMI and SAmi Enterprises. PEshawar CAntt, PESHAWAR
3. Strategyproposed to develop consensus about hydel power dams in Pakistan under the supervision of DR Engr S.M.Bhutta.
4. SOLAR ENERGY FEASIBILTIY BASED ON PHOTO VOLTAIC CELLSUnder the supervision ofDR Engr S.M.Bhutta.
5. Supervision of Design and Analysis of earth quake Resistant Energy Efficient houses.
6. SUPERVISION OF DESIGN AND MODELLING OF ENERGYTOWER.
Workshops and seminars
- Earned a CPD point in A one Day training on Coal fired Power Plants in 2016
- Earned a CPD point in Energy AuditTechniques in 2016.
- Article on Energy Efficient Electronics in SynergyMagazine.
- Executive member of the team on Policy on Roundtable on Energy 2015
- 10 Radio Interviews on Energy related topics in 2013,2014.
- Policy on Energy for PTI in 2012.
- RECENTLY PARTICIPATED IN THE APPLIED SYSTEMSANALYSIS TRAINING HELD IN PIEAS.(FROM 21ST NOV TO 25TH NOV 2011)
- ATTENDED A WORKSHOP 0N “ENERGY ENGINEERING” ORGANIZED IN COLLABORATION WITH PEC (FROM 20TH JUNE TO 21ST JUNE 2011)
3. ORGANIZED 2 DAYS ANNUAL OPEN HOUSE FOR THE SHOWCASING OF STUDENTS PROJECTS (FROM 2ND MAY 2011 TO 3RD MAY 2011)
4. PARTICIPATED IN SYMPOSIUM ON”BUILDING EFFECTIVE COORDINATION B/W R&D AND INDUSTRY FOR ENHANCING INOVATIONS, COMPETITIVENESS AND PRODUCTIVITY OF INDIGENIOUS TECHNOLOGIES” ON 4TH JAN 2011.
5. PARTICIPATED IN AN “INTERNATIONAL CONFERENCE ON POWER GENERATION SYSTEMS AND RENEWABLE ENERGY TECHNOLOGIES”.(FROM 29TH NOVEMBER TO 2NDDECEMBER 2010)
6 .ATTENDED A TRAINING WORKSHOPON TRAFFIC LAWS BY ITPON 5TH APRIL 2008.
7. PARTICIPATED IN INTERNATIONAL WORKSHOPS ON” EVOLUTION OF WIRELESS STANDARDS” IN UET PESHAWARON 3RD DEC 2007.
8. PARTICIPATED IN TRAINING “WORKSHOPS ON WCDMA/HSPA TECHNOLOGY“ON1ST DEC 2007 IN UETPESHAWAR.
9. PARTICIPATED IN STAFF DEVELOPMENT PROGRAM IN UET ON 4TH JUNE 2005
10. ATTENDED A SYMPOSIUM ON QUALITY EDUCATION IN 2005.
11. ATTENDED A SEVEN DAY WORKSHOP ON SRS-GIS TECHNOLOGY IN OCTOBER1999.
12. PARTICIPATED IN PROFESSIONAL DEVELOPMENT PROGRAM ON “Space technology APPLICATIONS” IN AEROSPACE INSTITUTE ISLAMABAD( FROM 5TH APRIL 1999 TO 4TH OCTOBER 1999)
RESEARCH INTEREST
- PLANNING & DESIGning
- RENEWABLES ENERGY TECHNOLOGIES.
- SMART GRID TECHNOLOGIES.
Languages
- URDU (read, WRITE, SPOKEN).
- ENGLISH (read, WRITE, SPOKEN). [IELTS (7.5), TOEFL (227).
- PUSTO (SPOKEN).
- HINDKOO (SPOKEN).
- PUNJABI (UNDERSTOOD AND INTERMEDIATE PROFICIENCY).
END