EU Emissions Trading Scheme 2017 - Declaration Form

I hereby declare that in relation to the category of activity listed in Condition 1 of the

Permit Number IE-GHG_____-______- _ as carried out at the installation listed therein,

Operator: ______,

Installation name: ______,

Installation number: ______,

Tick one of the following options supplying dates and reasons for temporary shutdowns where relevant.

□  The activity was continuously carried out from 1 January 2017 to 31 December 2017 during normal operating hours.

□  The activity was permanently closed as and from ______

□  The activity was temporarily shutdown from ______to ______

□  The activity was temporarily shutdown from ______and is still shutdown

In addition 1 and 2 below to be completed for installations who are entitled to free allocation for Phase III:

1.  Complete the Activity Level Table for each sub-installation relevant to your installation. The historic activity level (HAL Total) is contained in section K (IV) of your baseline data report. The HAL is also listed in the Organisation Details section of ETSWAP and can be accessed by clicking on the HAL link. The 2017 activity level for each sub-installation (calculated using a similar methodology to baseline calculations) should be available on-site in accordance with the Procedure agreed with the EPA in section 12 of your Monitoring Plan.

Activity Level Table

Sub-Installation / Historic Activity Level (HAL Total)
(Units) / 2017
Activity Level
(Units) / 2017 Activity Level as % of the HAL.
(2017 AL/HAL *100)

2.  Tick one or more of the relevant options below.

Where there is a change to the capacity, activity level or operation which impacts the installation's allocation an application form for amending amounts allocated free of charge should have been submitted to the EPA by 31 December 2017.

□  There was a partial cessation of Operations at the installation in 2017, as defined in Article 23 of the CIMS.

□  There was a recovery from partial cessation at the installation in 2017, as defined in Article 23 of the CIMS (please tick below which level of recovery).

o  Recovery greater than 50% compared to initial activity level

o  Recovery greater than 25% compared to initial activity level

□  The installation remained in partial cessation at the same level as reported in 2016

□  There was a cessation of Operations at the installation in 2017 as defined in Article 22 of the CIMS.

□  There was a significant capacity extension as defined in Article 3 (i) of the CIMS between 01/01/2017 and 31/12/2017. Cont’d/…

□  There was a significant capacity reduction as defined in Article 3 (j) of the CIMS between 01/01/2017 and the 31/12/2017.

□  There was a physical change to a sub-installation in 2017. Please include description below.

□  There was a change to the capacity of a sub-installation that did not meet the definition of a significant capacity reduction as defined in Article 3 (j) of the CIMS between 01/01/2017 and the 31/12/2017. (Please attach data/calculations confirming that a significant capacity decrease did not occur).

□  There were no changes to the capacity, initial activity level or operation of the installation between 01/01/2017 and 31/12/2017.

Signed: ______Print Name: ______

Position in the Company: ______

Company Stamp

Date

Return to: Attach the declaration (Signed and stamped) to the Capacity /Activity Level Change workflow on ETSWAP or

Email:

(to arrive no later than 5 pm on 21 January 2018).

Please note that correspondence on Emissions Trading will be available to public on request, unless specifically requested otherwise on grounds of confidentiality by the Operator. Any request for confidentiality must be justified and will be subject to acceptance by the Board of the Environmental Protection Agency.