DECORATIVE CLAMP-ON SNOW GUARD SPECIFICATION SHEET

SNOW GUARDS

PART 1GENERAL

1.1SUMMARY

  1. Section Includes:
  2. Snow Guards for standing seam metal roofs.
  3. Coordinate with roof installation to assure proper placement of the snow guards.
  1. Related Sections:
  2. Division 01: Administrative, procedural, and temporary work requirements.
  3. Section 074113 - Metal Roof Panels.
  4. Section 07 6100 - Sheet Metal Roofing.

1.2REFERENCES

  1. ASTM International (ASTM) (
  2. A588 – Standard Specification for High-Strength Low-Alloy Structural Steel, up to 50 ksi [345 MPa] Minimum Yield Point, with Atmospheric Corrosion Resistance.
  3. A1011 – Standard Specification for Steel, Sheet and Strip, Hot-Rolled, Carbon, Structural, High-Strength Low-Alloy, High-Strength Low-Alloy with Improved Formability, and Ultra-High Strength.
  4. B209 - Standard Specification for Aluminum Alloy Sheet and Plate.
  5. B152 - Standard Specification for Copper Sheet, Strip, Plate and Rolled Bar.
  6. B633 - Standard Specification for Electrodeposited Coatings of Zinc on Iron and Steel.

1.3SYSTEM DESCRIPTION

  1. Components
  2. Decorative Clamp-on Snow guard consists of accessory clamp base, decorative snow bracket add-onwith (2) zinc-plated carriage bolts and (2) zinc-plated flange nuts.
  1. Design Requirements:
  2. System design: Design snow retention as complete system with all components furnished by same manufacturer.
  3. Accessories and fasteners: Capable of resisting design forces in accordance with applicable Building Code.
  4. Provide engineered system to fail point of all components, framing, decking, fasteners, roofing, and snow guards.

1.4SUBMITTALS

  1. Submittals for Review:
  2. Shop Drawings: Show locations of snow guards on roof and attachment spacing.
  3. Product Data: Include manufacturer's product data sheets on each product to be used and installation instructions.
  4. Samples:
  5. Individual Clamp-on snow guard sample.
  6. Color chips showing available colors.
  1. Sustainable Design Submittals:
  2. Recycled Content: Certify percentages of post-consumer and pre-consumer recycled content.
  3. Regional Materials: Certify location of material manufacturer and distance from manufacturer to project site.

1.5QUALITY ASSURANCE

  1. Installer Qualifications: Minimum 2 years experience in work of this Section.
  1. Recycled Content: Minimum [__] percent recycled [aluminum] [steel] [stainless steel] [copper], with minimum [__] percent classified as post-consumer.

1.6DELIVERY, STORAGE AND HANDLING

  1. Stack materials to prevent damage and to allow for adequate ventilation.

1.7WARRANTIES

  1. Furnish manufacturer’s 20 year material components replacement warranty including shipping, covering failed components that do not meet or exceed engineered design loads.

PART 2PRODUCTS

2.1MANUFACTURERS

  1. Contract Documents are based on products by TRA Snow and Sun, 1657 South 580 East, American Fork, UT 84003, 800-606-8980, 801-756-8666, Fax 801-756-7891, ,
  1. Substitutions: [Under provisions of Division 01.] [Not permitted.]

2.2CLAMP-ON SNOW GUARDS

  1. Product: (choose one)
  2. Clamp-On Bear; accessory clamp base, decorative snow bracket add-on
  3. Clamp-On Moose; accessory clamp base, decorative snow bracket add-on.
  4. Clamp-On Tree; accessory clamp base, decorative snow bracket add-on.
  5. Clamp-On Leaf; accessory clamp base, decorative snow bracket add-on.
  6. Clamp-On Mushroom; accessory clamp base, decorative snow bracket add-on.
  7. Material:
  8. Copper, 1/4 inch (6 mm) thick.
  9. 3/16 inch (4.75 mm) steel.
  10. Aluminum, 1/4 inch (6 mm) thick.
  11. Cor-Ten steel, 16 gage.
  12. Finish:
  13. Powder Coated.
  14. RAL______.
  15. Best match of roof color from manufacturer’s standard colors.
  16. To be selected/approved by architect (submit samples).
  17. Hot Dipped Galvanized.
  18. Mill Finish.
  19. Electrogalvanized Steel (Paintlock).
  20. Raw steel.

PART 3EXECUTION

3.1EXAMINATION

  1. Verify that roofing materials, framing, decking, and fastenings are capable of resisting design forces in accordance with applicable Building Code.

3.2PREPARATION

  1. Clean areas to receive attachments; remove loose and foreign matter that could interfere with installation or performance.

3.3INSTALLATION

  1. Install in accordance with manufacturer's instructions and approved Shop Drawings.
  1. Place snow guards level and aligned.
  1. Fasten to supporting construction.

END OF SECTION