Network Disclosure Announcement No. 727

Short Term Public Notice Under Rule 51.333(a)

Qwest’s Internet address: http://www.qwest.com/disclosures.

Copper Retirements in Arizona, Colorado, Idaho, Minnesota, Utah, Washington

First Implementation Date: June 9, 2010

Original Date Posted: April 14, 2010

Summary: Copper Retirementsare necessary to respond to various factors in the Outside Plant, including road construction, maintenance problems, and growth accommodation.Replacement cables may beeithercopper or fiber. Specific information will be provided with each disclosure.

Locations, Timing of

Deployments & Interface

Requirements: The following gives additional details on the copper retirement(s):

STATE / WIRE CENTER / PLANNED COMPLETION OR RETIREMENT DATE / DA (s) / Job # / FDI Address(es) / Replacing /
AZ / Tuscan North
TCSNAZNO / 9-30-2010 / 311011 / 92136TR / 6955 N Pomelo Pl / Qwest is cutting all customers over to fiber fed digital loop carrier at TEA=X 6955 N Pomelo Pl which serves DA311011. All existing POTS and designed services will be supported.
CO / Durango
DURNCOMA / 6-11-2010 / 330791 / 02237L1 / 32280H160 & 34344H160 / This project will replace 1876' of BHBH-100, 605' of AFAW-11 and 605' of AFAW-25 with 2754' of ANMW-100 along U S Highway 160; the cables will be relocated for a CDOT project. The before has a loop length of 8.164 KF, a resistance of 177.133 Ohms and a loss of 7.050 dB's. The after way will have a loop length of 8.376 KF, a resistance of 267.254 Ohms and a loss of 9.610 dB's.
This project will also replace 1725' of KFAW-54 with 2075' of KNAW-54 along the highway. The before has a loop length of 29.625 KF, a resistance of 974.662 and a loss of 36.050 dB's. The after will have a loop length of 29.940 KF, a resistance of 985.026 Ohms and a loss of 36.440 dB's.
ID / Jerome
JERMIDNM / 7-16-2010 / 114001 / 0231GCY / 198 S 200 West / Owest will replace 4127’ ALAW-50 with 3941’ ANMW-25 . The dB change will be as follows:
ALAW-50 @28KHz=4.60
ANMW-25 @28KHz=6.29
Total dB loss is +1.69
The new loop total will be 8.164kf compared to 8.500kf.
MN / Eden Prairie
EDPRMNEP / 6-9-2010 / 310806,310802,310804 / 02M27QZ / 11144 Rhode Island Ave S, 7550 W 109th St., 11200 Minnesota Bluffs Dr / Federal road project at TH169 & Hwy 494 forces Qwest to remove all copper feeder pairs from the three SAI’s. All services will be cutover to fiber fed digital loop carrier facilities. Copper will no longer be available for future assignments at any of these locations.
MN / Eden Prairie
EDPRMNEP / 6-9-2010 / 311002 / 02M27UB / 6750 W 106th St. / Federal road project at TH169 & Hwy 494 forces Qwest to remove all copper feeder pairs from this SAI. All services will be cutover to fiber fed digital loop carrier facilities. Copper will no longer be available for future assignments at any of these locations.
MN / Eden Prairie
EDPRMNEP / 7-23-2010 / 311003 / 02M27UJ / 6801 W 110th St. / Federal road project at TH169 & Hwy 494 forces Qwest to remove all copper feeder pairs from this SAI. All services will be cutover to fiber fed digital loop carrier facilities. Copper will no longer be available for future assignments at any of these locations.
MN / Eden Prairie
EDPRMNEP / 6-15-2010 / 311303 / 02M27W5 / 10001 Franlo Rd / Federal road project at TH169 & Hwy 494 forces Qwest to remove all copper feeder pairs from this SAI. All services will be cutover to fiber fed digital loop carrier facilities. Copper will no longer be available for future assignments at any of these locations.
MN / Eden Prairie
EDPRMNEP / 6-9-2010 / 311304 / 02M27UW / 9950 Franlo Rd / Federal road project at TH169 & Hwy 494 forces Qwest to remove all copper feeder pairs from this SAI. All services will be cutover to fiber fed digital loop carrier facilities. Copper will no longer be available for future assignments at any of these locations.
UT / Parowan
PRWNUTMA / 7-21-2010 / 212001 / 9261X5U / 1487 W Old Hwy 91 / New SAI X 1487 W Old Hwy 91 is 16kft from the CO. A new DLC will be placed and 92 F2 workers will be cut out of the old SAI 51 S 100 West and into the new SAI. There are currently no circuits that will be adversely affected by this cutover. All existing circuits will continue to work.
UT / Riverton
RVTNUTMA / 6-15-2010 / 114401 / H96A056 / 11400 South Redwood / Relocate facilities in conflict with: UDOT Project S-P-157 (156) 293 SECTION 5; 11400 SOUTH REDWOOD ROAD TO 2200 W.
The dB loss calculations for the individual copper cable sections are:
Before:
5087' of 24GA
28 KHz = 8.33db
After:
7.027' of 24GA
28 KHz = 11.820
Change of +3.49 db loss
WA / Fawcett
TACMWAFA / 6-10-2010 / 313002 / 02W2JU4 / 3535 E Roosevelt Ave / A Washington State road project requires relocation of Qwest facilities paralleling SR167 & I-5. This job will abandon 3,666' of F1 ADAC900 @ 28KHz-4.040 and place a new fiber fed RT, at 3535 E Roosevelt Ave, with placement of 4,692' F2 ANMW100 @ 28KHz=7.620 for a negetive change of +3.58dBloss. The furthest serving terminal affected by this relocation work is located 5.31Kf from the new RT/SAI. Although there is a negetive change in dB loss, the impacted circuits willl continue to work upon completion of this job.

Additional Information: Any customer premises equipment vendor/manufacturer or enhanced services provider desiring additional technical information in conjunction with this Disclosure can contact:

Georganne Weidenbach

Regulatory Compliance Manager