Professional Services Guide PSG-Exhibit 6

Estimated Building Construction Cost – Summary & Comparison

Proj, No.:

/ / /

Date:

/

Click here to enter a date.

Proj. Name:

/ / /

Prepared by:

/

, A/E

USF Bldg. No.:

/ / /

Phase:

/

Choose an item.

I.  Estimated Building Construction Cost (Space Summary) / Submittal Phase Probable Construction Cost ($): / $
Space Type / NASF / NASF/ GSF Factor / (a)
GSF / (b)
Constr. Cost Per GSF
(major space type cost/GSF or sample bldg. Average cost/GSF) / Total Cost
(Building Const. Cost)
(a x b) / Approved Program
NASF / Concept
Schem.
NASF / Advanced
Schem.
NASF / Design
Develop.
NASF / 50%
CD
NASF / 100%
CD
NASF
Date / Date / Date / Date / Date / Date
Classroom / 1.5
Teaching Laboratory / 1.5
Research Laboratory / 1.5
Study / 1.4
Instructional Media / 1.4
Auditorium/Exhibition / 1.2
Teaching Gymnasium / 1.2
Student Academic Support / 1.5
Office/Computer / 1.5
Campus Support / 1.4
Space Total / *
Proposed Add. Alternates (@ DD Phase Submittal with Estimated Dollar Value) / Efficiency Factor * (NASF/GSF)
Total Gross Square Footage (GSF)
1.  / Cost per GSF ($/GSF)
2.  / Building Const. Cost (GSF x $ /GSF)
3.  / PSG Criteria (PSG 3.14.2)
4.  / Building Gross SF (PSG 3.14.2.1)
5.  / Net Assignable SF (PSG 3.14.2.2)
6.  / Covered Walkway SF (PSG 3.14.2.3)

*Insert Predominant Space Type Factor Used for Calculating Overall GSF

II.  Estimated Building Construction Cost (Schedule of Values) / Submittal Phase Probable Construction Cost ($): / $
1.  Construction Components / Approved
Program / Concept
Schematics. / Advanced
Schematics / Design
Development / 50% CD / 100% CD
Date: / Date: / Date: / Date: / Date: / Date:
a.  Building Construction Cost
b.  Environmental Impacts/Mitigation
c.  Site Preparation/Demolition
d.  Landscape/Irrigation
e.  Plazas/Walks/Bikepaths
f.  Roadway Improvements
g.  Parking (number of spaces ____)
h.  Telecommunications (interior/exterior)
i.  Electrical Service
j.  Water Distribution System
k.  Sanitary Sewer System
l.  Storm Water System
m. Chilled Water System
n.  Energy Efficient Equipment
Subtotal: (Constriction Component Cost)
2.  Other Project Components
(per approved program $) / Approved
Program / Concept
Schematics. / Advanced
Schematics / Design
Development / 50% CD / 100% CD
a.  Land/Existing Facility Acquisition
b.  Professional Fees
Base Agreement (%)
Special Consultants (list type)
Construction Manager (approx. 1%)
c.  Fire Marshal (.0025)
d.  Inspection Services
Project Representative
Roof Inspector
Threshold Inspector
e.  Insurance Consultant (.0006)
f.  Surveys/Tests
Topographical Survey
Geotechnical Tests
Construction Test (Concrete, HVAC, etc.)
g.  Permit/Impact/Environmental Fees
Permits
Impact
Environmental
h.  Art Work (.005)
i.  Furnishings & Equipment
j.  Contingencies
Subtotal: (Other Component Cost)
3.  Total Cost: / Approved
Program / Concept
Schematics. / Advanced
Schematics / Design
Development / 50% CD / 100% CD
Total: (items 1 & 2 above)
III.  Cost Containment Guidelines
Exceptions to the State University System Cost Containment Guidelines, which were not included and approved on a previous submittal, are being recommended: / £ Yes
£ No
*If “yes”, attach the relevant sheet(s) from the Cost Containment Guidelines with the comments and justifications noted. / Signature (date)

File: PSG-Exhibit 4-Estimated Building Construction Cost.docx

Page 3 of 3