CONTRACT SUMMARY

This information will made available to the public on the State Water Resources Control Board’s (SWRCB) Website (see address below).

Use the "tab" and arrow keys to move through the form. If field is not applicable, please put N/A in block.

Date filled out: March 11, 2004

A) Contract Information Please use complete phrases/sentences. Fields will expand as necessary as you type.
1. Contract Number: 00-159-252-0
2. Project Title: Stentzel Lane Erosion and Sediment Reduction Project
3. Project Purpose – Problem: (problem being addressed) The Mount Wanda Sub-watershed contributes a significant sediment
load to a rural residential neighborhood where the runoff continues to erode the alluvial fan and ditches in the Strentzel Lane
neighborhood.
4. Project Goals:
a.  Short-term Goals: The goal of the project is to protect the area from further erosion through installation of vegetated
swales, meandering streams and pipe segments.
b.  Long-term Goals: The goal of the project is to reduce sediment loads in the area and to the downstream creek as the
features installed will dissipate the stormwater energy, while providing an aesthetic enhancement to the neighborhood.
5. Project Location: (lat/longs, watershed, etc.) Mount Wanda tributary to the Alhambra Watershed in Martinez
a. Physical Size of Project: (miles, acres, sq. ft., etc.)
Approximately 3,000 feet long / b. Counties included in the project:

Contra Costa County

c. Legislative Districts: (Assembly and Senate) 11th
District Assembly: 7th District Senate
6. Which SWRCB program is funding this contract? Please put an "X" by the one that applies.
___ Prop 13 X EPA 319(h) ___ Other
B) Contract Contact: Refers to contract project director.
Name: Kevin Emigh / Job Title: Senior Civil Engineer
Organization: Contra Costa County Public Works

Department

/ Webpage Address: www.co.contra-costa.ca.us/depart/pw
Address: 255 Glacier Drive, Martinez, CA 94553-4825
Phone: (925) 313-2233 / Fax number: (925) 313-2333
Email: /depart/pw
C. Contract Time Frame: Refers to the implementation period of the contract.
From: April 1, 2001 / To: December 31, 2004
D) Project Partner Information: Name all agencies/groups involved with project. National Park Service, Friends of Alhambra Creek, Restoration Trust

E) Nutrient and Sediment Load Reduction Projection (if applicable):

/ The sediment load is anticipated to be significantly reduced; however, a quantitative estimate has not been performed.

PLEASE PROVIDE A HARD COPY AND AN ELECTRONIC COPY TO YOUR CONTRACT MANAGER AND YOUR PROGRAM ANALYST WITH YOUR QUARTERLY/MONTHLY REPORT. ALL APPLICABLE FIELDS ARE MANDATORY. IF FIELD IS NOT APPLICABLE, PLEASE PUT N/A IN BLOCK. INCOMPLETE FORMS WILL BE RETURNED. THE ELECTRONIC VERSION OF THIS FORM CAN BE FOUND AT: http://www.swrcb.ca.gov/nps/319hproj.html.