Environmental Impact Report for

Sino-Singapore Tianjin Eco-city Public Housing Pilot Project

Nankai University

January 2010

75

Contents

PREFACE 1

1 INTRODUCTION 2

1.1 BASIS FOR THE REPORT 2

1.2 EVALUATION LEVEL AND SCOPE 3

1.3 EVALUATION FOCUS 4

1.4 EVALUATION FACTOR 5

1.5 EVALUATION STANDARD 5

1.6 ENVIRONMENTAL SENSITIVE TARGETS 7

2. OVERVIEW AND ANALYSIS OF THE PROJECT 7

2.1 OVERVIEW OF THE PROJECT 7

2.2 THE POLLUTION SOURCES ANALYSIS 17

3 ENVIRONMENTAL BBASELINE INVESTIGATIONS AND ASSESSMENT 18

3.1 PROFILES OF THE NATURAL ENVIRONMENT 19

3.2 PROFILES OF THE SOCIAL ENVIRONMENT 22

3.3 ENVIRONMENTAL QUALITY 24

4 COMPARISONS AND ANALYSIS OF ALTERNATIVES 25

4.1 ANALYSIS OF NON-PROJECT ALTERNATIVE 25

4.2 THE COMPARISON BETWEEN DIFFERENT SCHEMES FOR GARBAGE COLLECTION 27

4.3 THE COMPARISON BETWEEN DIFFERENT SCHEMES FOR HEAT SOURCES 28

4.4 COMPARISON OF DIFFERENT STANDARD PLANS FOR BUILDING 29

5 PREDICTIONS AND ASSESSMENT OF ENVIRONMENTAL IMPACT DURING CONSTRUCTION PERIOD 30

5.1 ATMOSPHERIC ENVIRONMENTAL IMPACT 30

5.2 WATER ENVIRONMENTAL IMPACT 31

5.3 ACOUSTIC ENVIRONMENTAL IMPACT 31

5.4 THE IMPACT OF SOLID WASTE 33

6 ENVIRONMENTAL IMPACT PREDICTIONS AND ASSESSMENT ON OPERATION PHASE 33

6.1 WASTE GAS 33

6.2 AUTOMOBILE EXHAUST 34

6.3 DOMESTIC SEWAGE 34

6.4 NOISE 35

6.5 SOLID WASTE 36

7 ENVIRONMENTAL MANAGEMENT PLAN (EMP) 36

7.1 ENVIRONMENTAL MANAGEMENT MECHANISM 38

7.2 ENVIRONMENTAL MANAGEMENT MEASURES 47

7.3 ENVIRONMENTAL MONITORING PLAN 60

7.4 ENVIRONMENTAL TRAINING PROGRAM 61

7.5 INFORMATION MANAGEMENT AND REPORTING SYSTEM 64

8 PUBLIC PARTICIPATION 65

8.1 ONLINE PUBLICITY 65

8.2 QUESTIONNAIRE SURVEY 66

9 CONCLUSIONS AND RECOMMENDATIONS 72

Annex 1 The Relevant Provisions of "The technical specification of green construction in Sino-Singapore Tianjin Eco-city (draft)" 75

75

PREFACE

Sino-Singapore Tianjin Eco-city is located in northern part of Tianjin Binhai New Area, between Hangu District and Tanggu District to the north of Yongding New River and to the east of Jiyun River. The project covers a total area of 34.2 km2. It’s a strategic cooperation project between the two governments of China and Singapore. Sino-Singapore Tianjin Eco-city is designed as an innovation platform of China's environment protection, energy-saving and discharge reducing, and green building technologies etc. , as an Eco-industrial base and the National-level Center of Environmental education research and development, and exhibition exchange, and the ecological industry, as a window for participating in international eco-environment development issues ,and as a livable Eco-Pilot town .

In order to implement the orientation of eco-city and implement Green Building Pilot, eco-city, on the basis of practical experience in Singapore, makes the decision to construct green building Pilot Project, including Public Housing Pilot Project and Middle School Pilot Project, where Public Housing Pilot Project will be first built soon. In addition to the role of green house model features, eco-city public housing is a non-profit policy-oriented housing, with the goal to resolve the housing problem of low-income families in the eco-city and promote the steady development of the housing market. As this project has a good Pilot effect on green building, the Global Environment Facility (GEF) grants 3.66 million dollars, and the project is required to implement the relevant provisions of the World Bank.

According to the policy requirements of Environmental Impact Assessment Law of PRC, Regulation of Environmental Protection Management of Construction Project (State Council Order No. 253), and other Chinese laws and regulations, and the World Bank OP 4.01, the green building Pilot Project in Sino-Singapore Tianjin Eco-city shall conduct an environmental impact assessment and prepare the environmental impact report. So the construction unit of this project, Tianjin Eco-City Investment and Development Co., Ltd. commissioned Environmental Planning and Assessment of Nankai University to conduct an environmental impact assessment. On the basis of data research, sector advisory and field survey, evaluators prepared a draft environmental assessment report of the project. Now submit it to environmental protection administrative departments and the World Bank to review.

1 INTRODUCTION

1.1 BASIS FOR THE REPORT

1.1.1 Laws, Regulations and Plans

Environmental Protection Law of PRC, December 26, 1989.

Environmental Impact Assessment Law of PRC, October 28, 2002.

Air Pollution Prevention and Control Act of PRC, revised on April 29, 2000.

Water Pollution Prevention and Control Act of PRC, revised on February 28, 2008.

Environmental Noise Pollution Prevention and Control Act of PRC, October 29, 1996.

Solid Waste Pollution Prevention and Control Act of PRC, revised on December29, 2004.

Law of Cleaning Production Promotion of the PRC, June 29, 2002.

Circular Economy Promotion Law of PRC, August 29,2008.

Law of the Peoples Republic of China on Water and Soil Conservation, June 29, 1991.

Water Law of PRC, revised on August 29, 2002.

The Law of the Peoples Republic of China on Precaution against Earthquake and Relief of Disaster, December 29, 1997.

The Law of Land Administration of PRC, revised on August 28, 2004.

Regulation of Environmental Protection Management of Construction Project, November 29, 1998.

The Provisional Measure of Public Participating in Environmental Assessment, February 14,2006.

Regulations of Tianjin Municipality on Environmental Protection, revised on December 21, 2004.

Regulations of Tianjin Municipality on the Prevention and Control of Atmospheric Pollution, revised on November 12, 2004.

Measures of Tianjin Municipality for the Administration of Water Pollution Control, revised on June 30, 2004.

Measures of Tianjin Municipality for the Administration of Environmental Noise Pollution Prevention and Control, August 25, 2003.

Measures of Tianjin Municipality for the Administration of Environmental Protection Management of Construction Project, revised on June 30, 2004.

Regulations on Administration of Sino-Singapore Tianjin Eco-city, September 28, 2008.

Regulations of Tianjin Municipality on Administration of Domestic Wastes, March 12, 2008.

Regulations of Tianjin Municipality on Administration of Building Energy Conservation, November 14, 2006.

Regulations of Tianjin Municipality on Administration of Civilized Construction of Construction Project, April 28, 2006.

Interim Measures of Tianjin Municipality for the Administration of Dust Control at the Construction Site of Construction Project, February 16, 2004.

Interim Regulations on Administration of the Prevention and Control of Dust Pollution, December 30, 2002.

The World Bank OP 4.01 and its annexes, January, 1999.

Master Plan of Sino-Singapore Tianjin Eco-city, 2008~2020.

1.1.2 Technical Guidelines

Technical Guidelines for Environment Impact Assessment-Master (HJ/T2.1-93)

Technical Guidelines for Environment Impact Assessment-Atmospheric (HJ/T2.2-2008)

Technical Guidelines for Environment Impact Assessment-Surface Water Environment (HJ/T2.3-93)

Technical Guidelines for Environment Impact Assessment-Acoustic Environment (HJ/T2.4-1995)

Technical Guidelines for Environment Impact Assessment-Non-polluted ecological impact (HJ/T19-1997)

1.2 EVALUATION LEVEL AND SCOPE

By the classification methods of the World Bank OP4.01 (Environmental Assessment), according to pollution characteristics,source strong,and the environmental conditions of the construction project, the project of environmental impact assessment for Public Housing Pilot of Sino-Singapore Tianjin Eco-city is classified as Class B.

The project mainly includes Public Housing Pilot Project and Middle School Pilot project,and will be construct in different stages, where Public Housing Pilot Project will be first built, which has entered into the design phase; While, the Middle School Pilot Project has less environmental impact. According to Category List of Construction Project environmental impact assessment (The Environmental Protection Department Order No. 2) ,because of the designed number of pupils and teachers,only the environmental impact registration form needs to be filled, so there is no need to conduct an environmental impact assessment. Meanwhile, in consideration that the location of public housing Pilot projects is close to middle school Pilot project, environmental impact also has similarities; the content of this report is mainly for Public Housing Pilot Project. Only in the environmental management plan, according to the characteristics of Middle School Pilot Project, propose additional recommendations of environmental management measures during operating phase.

Evaluation period includes construction phase and operation phase. Environmental impact assessment of atmosphere during construction period and operation period refer to 200m around the project. Environmental impact assessment of water achieves the sewage treatment plant of Sino-Singapore Tianjin Eco-city. Environmental impact assessment of noise during construction period refers to 200m around the project. The main considerations during operation period are that the water pump and other sound source have impact on the project itself.

1.3 EVALUATION FOCUS

According to the characteristics and the surrounding environmental conditions of the project, the assessment focuses on the environmental impact and prevention measures of dust and noises during the period of construction, and domestic sewage during operation period, environmental impact of residential garbage.

1.4 EVALUATION FACTOR

(1) Atmosphere Environment

Status evaluation factors: PM10, SO2, NO2

Prediction factors of environmental impact during construction period: TSP

Prediction factors of environmental impact during operation period: Dust, SO2, NOx, CO and THC (only accounting for emissions)

(2)Water Environment

Prediction factors of environmental impact: BOD5, CODCr, SS, NH3-N, TP (accounting for emissions and analysis of emission standards)

(3) Acoustic Environment

Status evaluation factor and prediction factor of environmental impact both are LeqdB(A).

(4) Solid Waste

Prediction factors of environmental impact during construction period: Construction waste, MSW

Prediction factors of environmental impact during operation period: MSW

1.5 EVALUATION STANDARD

The sewage of the project gets into the Ying-city sewage treatment plant and recycled water plant of Sino-Singapore Tianjin Eco-city where the sewage can be processed and recycled, and has no effect on the environmental quality of surface water. Therefore, environmental quality standards mainly refer to the atmospheric environment and acoustic environment quality standards. Among them, quality assessment of ambient air adopts the second class standard of Ambient Air Quality Standard (GB3095-1996), as shown in Table 1-1. Quality assessment of acoustic environmental adopts the second class standard of Environmental quality Standard for noise (GB3096-2008). Implement the standard for Class 4a within 30m on both sides of trunk roads, as shown in Table 1-2.

Table 1-1 the second class standard of Ambient Air Quality Standard (GB3095-1996)

Pollutants / Daily average concentration limit(mg/m3) / Average annual concentration limit(mg/m3)
SO2 / 0.15 / 0.06
NO2 / 0.12 / 0.08
PM10 / 0.15 / 0.10

Table 1-2 the second class standard of Environmental Quality Standard for Noise (GB3096-2008) Unit: dB (A)

Analog acoustic environment function zones / Daytime / Night
2 / 60 / 50
4a / 70 / 55

As for the pollutant discharge standards, Wastewater Discharge adopts the third class standard of Integrated Wastewater discharge Standard (DB12/356-2008), as shown in Table 1-3; During construction period, implement Noise limits for Construction Site (GB12523-90), as shown in Table 1-4; During operation period, implement Emission standard for community noise (GB 22337 - 2008), as shown in Table 1-5, as shown in Table 1-6.

Table 1-3 the third class standard of Integrated Wastewater Discharge Standard (DB12/356-2008)

Item / BOD5 / CODCr / SS / NH3-N / TP
Standard limits(mg/L) / 300 / 500 / 400 / 35 / 3.0

Table 1-4 Noise limits for construction site Unit: dB (A)

Construction Period / The main noise source / Noise limits
Daytime / Night
Earthwork / Bulldozers, excavators, loaders, etc. / 75 / 55
Piling / All kinds of piling machines, etc. / 85 / Prohibit construction
Frame / Concrete mixer, vibrator, electric saws, etc. / 70 / 55
Decoration / Cranes, lifts, etc. / 65 / 55

Table 1-5 Emission Standards for Community Noise (GB22337-2008) Unit: dB (A)

Category beyond the boundaries of acoustic environment function zones / Daytime / Night
Class 2 / 60 / 50
Class 4 / 70 / 55

Table 1-6 Emission standard for Community Noise (GB22337-2008) Unit: dB (A)

Room type and time
Functional areas categories / A Class Room / B Class Room
Daytime / Night / Daytime / Night
2、3、4 / 45 / 35 / 50 / 40
Description: The main purpose of A class room is to sleep,it is necessary to ensure a quiet room at night,this project mainly refers to residential bedroom; B class room will primarily be used in the daytime, it ensures that the spirit of thought and concentration, and speech will not be disturbed, this project mainly refers to rooms away from bedroom, and neighborhood committees and so on..

1.6 ENVIRONMENTAL SENSITIVE TARGETS

The project is located at Plot No. 15 of the Eco-city start-Area, now it is a piece of land to be built; there are no residential areas, schools, hospitals and other environmentally sensitive targets within the surrounding 300m. And as the public housing Pilot projects of Sino-Singapore Tianjin Eco-city, the project is the first construction of residential projects, during the construction process there are no residential areas, schools, hospitals and other environmentally sensitive targets within the surrounding 300m either. Therefore, this evaluation does not set the environmental sensitive targets.

2. OVERVIEW AND ANALYSIS OF THE PROJECT

2.1 OVERVIEW OF THE PROJECT

2.1.1 Project Site

The project site of Sino-Singapore Tianjin Eco-city is located at Plot No. 15 of the Eco-city start-Area. The Public Housing Pilot Project is located at the northeast of Plot No. 15 of the Eco-city start-Area, at the west of Zhongtian Avenue, at the north of Zhongjin Avenue, at the east of Hechang Road, at the south of Hefeng Road. School Pilot project is located at the northeast of Plot No. 15, in the west side of Public Housing Pilot Project. This section focuses on the situation of Public Housing Pilot Project, concluding with a brief description of the basic information on Middle School Pilot Project.

2.1.2 Project Composition and Layout

The whole process of design, construction, operation and composition of this project will adopt Sino-Singapore Tianjin Eco-city Green Building Evaluation Standard (DB/T29-192-2009, hereinafter referred to as Evaluation Standard).The building area of the project is 21,300 m2, the gross building area is 37,885 m2 (including 5100m2 underground). Residential area is 32004 m2, public building area is 781m2, and balance of land for the project is shown in Table 2-1.

Table 2-1 Land balance of the public housing pilot projects of Sino-Singapore Tianjin Eco-city

Item / Area(m2) / Proportion(%)
Total planning land area / 21300 / 100
Including / Residential land / 14824 / 69.6
Land for public buildings / 1835 / 8.6
Public green land / 2405 / 11.3
Land for road use / 2236 / 10.5

The project mainly includes 7 residential buildings (With tower high-rise and high-rise combination plate, there are 13~18 layers), semi-underground garage, neighborhood activity centers and other public buildings. The construction area of the project is21,300 m2, the gross building area is 37,885 m2 (including 5100m2 underground), the total investment is 166.2 million yuan. The project technical and economic indicators are shown in Table 2-2; public-built configuration is shown in Table 2-3.