NON METALLIC MATERIALS MANUFACTURING/TESTING
JUNE 2015
CONFIRMED
CONFIRMED MINUTES
JUNE 24, 2015
MONTREAL, QUEBEC, CANADA
These minutes are not final until confirmed by the Task Group in writing or by vote at a subsequent meeting. Information herein does not constitute a communication or recommendation from the Task Group and shall not be considered as such by any agency.
WEDNESDAY, JUNE 24, 2015
1.0OPENING COMMENTS - Open
1.1Call to Order / Quorum Check
The Non Metallic Materials Manufacturing (NMMM), and Non Metallic Materials Testing (NMMT) Task Group (TG) was called to order at 8:00 a.m., 24-Jun-2015.
It was verified that only SUBSCRIBER MEMBERS were in attendance during the closed portion of the meeting.
1.2A quorum was established with the following representatives in attendance:
Subscriber Members/Participants Present (* Indicates Voting Member)
NAME / COMPANY NAME* / Monica / Alcala / Honeywell Aerospace / Secretary
* / Douglas / Armstrong / GE Aviation
Randy / Armstrong / Raytheon Company
* / Tomohiko / Ashikaga / Mitsubishi Heavy Industries, Ltd.
* / Tawny / Blumenshine / Cessna Aircraft Company
Sofia / Boseanu / UTC Aerospace (Goodrich)
Christine / Brassine / SAFRAN Group
* / Tara / Campbell / Rolls-Royce
* / James / Cobb / Honeywell Aerospace
Christopher / Cowap / Triumph Group Inc.
* / Brandon / Davis / Sikorsky Aircraft
* / Kevin / Dowling / Spirit AeroSystems
* / Patrick / Dunleavy / SAFRAN Group
* / Javier / Garcia-Baeza / Airbus
Frederic / Grenon / Bombardier Aerospace
* / Brett / Hemingway / BAE Systems - MAI
* / Mark / Jackson / Triumph Group
* / Evelyn / Jacobson / Pratt & Whitney
Yijun / Jiang / COMAC
* / John / Key / Bell Helicopter / Chairperson
Theodore / Klironomos / Bombardier Aerospace
Ronald / Kramer / Gulfstream Aerospace Corporation
Sebastien / Lauzon / Bombardier Aerospace
* / Eric / Le Fort / Sonaca
* / Herman / Leibovich / Israel Aerospace Industries
Lance / Loeks / The Boeing Company
* / Andreas / Mastorakis / GE Aviation
* / Angelina / Mendoza / UTC Aerospace (Goodrich)
Luis / Pacheco / Embraer Sa
* / Keith / Panuska / Lockheed Martin Corporation / Vice Chairperson
* / Richard / Perrett / GKN Aerospace
Fabrizio / Quadrini / AgustaWestland
* / Elliott / Schulte / Bell Helicopter Textron Inc.
Mario / Simard / Bombardier Aerostructures and Engineering Services
* / Sally / Spindor / Triumph Group Inc.
Other Members/Participants Present (* Indicates Voting Member)
NAME / COMPANY NAME* / Pedro / Astola Gonzalez / TITANIA
* / Natalia / Becerra Pozo / Exova
* / Arnaud / Bonnet / Cetim
Hugh / Casper / MTS Systems Corporation
Amir Ershad / Fanaei / CTT Group
Lisa / Hill / Stelia Aerospace North America
Hubert / Kern / FACC
Hugo / Lepine / Hutchinson
Breton / Lutz / E.I. Dupont de Nemours and Company
Opie / Moyegun / Hexcel Corporation
* / Rick / Price / Park Electrochemical Corporation
* / Karen / Quinn / Orbital ATK
Anil / Reddy / Hexcel Corporation
* / Roy / Redmond / Hexcel Corporation
Scott / Sheinbaum / CYTEC
Howard / Spader / Instron
Jose / Stevaux / STELIA Aerospace North American Inc.
Tsunao / Tezuka / IHI Corporation
Arno / Toelkes / Euro-Composites SA
* / Nancy / Vancil / Toray Carbon Fibers America, Inc.
PRI Staff Present
John / Tibma1.3Introductions
1.4Routing of Attendance List
1.5Safety Information
Reviewed Fire Exits in Meeting Room
Informed PRI Staff person of any emergencies
1.6Approval of Previous Meeting Minutes– OPEN
Motion made to approve the minutes from March 2015 as written. Motion Passed
1.7Reviewed Code of Ethics (Ref: Attendees’ Guide) and Meeting Conduct
1.8Presented the Antitrust Video
1.9Voting Member Review
John Key waived the voting member requirements to allow William DeLaurier of IMR Test Labs to maintain voting membership.
1.10Review the Agenda
2.0Staff Report– OPEN
3.0ASTM E1012 Annex A2 Grip Alignment Compensation Limits - OPEN
NMMT RAIL Item 71 Report OutFuture Meeting Information
ACTION ITEM: Natalia Becerra to show an illustrated presentation for the next Nadcap October 2015 meeting to explain test alignment specimen placement.(Due Date: 21-Oct-2015)
ACTION ITEM: Sub team (Natalia Becerra) to work on a proposal for acceptable bending factor correction due to machine alignment. (Due Date: 21-Oct-2015)
4.0AC7122-I “Fabrication Codes” to Provide Visibility to Specimen - OPEN Manufacturing
NMMT RAIL Item 72 Report Out
ACTION ITEM: Three codes were accepted: Panel manufacturing, specimen fabrication and specimen machining. Sub team (John Key) to revise proposal and present at October 2015 meeting. (Due Date: 21-Oct-2015)
5.0AC7122-R Fiber Manufacturer Testing Round Robin Requirements - OPEN
Discussion of Subscriber Comments to Requirements Proposed in Berlin
ACTION ITEM: PRI to implement Round Robin Testing language from proposal into appropriate checklists and procedures. (Due Date:30-Aug-2015)
6.02015 Auditors Conference Planning (continued) - OPEN
Topic Assignments
7.0Open Discussion - OPEN
This time has been set aside to discuss any new topics that are brought forward.
The addition of thermoplastics prepregging to AC7124 was discussed, but no action was taken at this time.
8.0Meeting Close Out - OPEN
New Voting Member (VM) Review and Acceptance
- Javier Garcia-Baeza – Airbus Subscriber VM NMMM/NMMMT
- Richard Perrett – GKN Aerospace Subscriber VM NMMM/NMMT
- Karen Quinn – Orbital ATK Alternate VM NMMM/NMMT
- Arnaud Bonnet – CETIM Supplier VM NMMT
- Douglas Armstrong – GE Aviation Alternate Subscriber VM NMMM/NMMT
- James Cobb – Honeywell Alternate Subscriber VM NMMM/NMMT
- Tawny Blumenshine – Cessna Subscriber VM NMMM/NMMT
The listed new voting members were unanimously voted in by the task group.
ADJOURNMENT – 24-Jun-2015 – Meeting was adjourned at 4:30 p.m.
Minutes Prepared by: Monica Alcala ()
***** For PRI Staff use only: ******Are procedural/form changes required based on changes/actions approved during this meeting? (select one)
YES* ☐ NO X
*If yes, the following information is required:
Documents requiring revision: / Who is responsible: / Due date: