ALOK KUMAR SINGH
Objective
To achieve success in personal and professional life while performing task which is tied to the success of organization.
Areas of Interest
Oil and Gas- Refinery & Pipeline
· Design & Engineering
· Construction & Execution Management
· Project Planning
· Quality Control
· Bid Proposals & Project Estimation
· Client and Vendor Relations
Employment Detail
Working as Asst. Manager (Projects) in Fabtech Projects & Engineer Ltd. From 30 January, 2012 to till date.
1. Project Description- Implementation of safety measures as per revised OISD-117 as well as MB lal committee recommendations in tank farms of OIL, Assam.
Job Description:
· Engineering drawing review as per the contract (Pipeline, Piping, Tankages, Foam System, Fire fighting etc.)
· Responsible for engineering related clarifications.
· Preparation of MTO/BOM.
· Incorporating the comments in the engineering drawing.
· Coordination with client/PMC.
· Produced significant cost savings, potential cost avoidance and preventive problem solving through numerous cost saving ideas, suggestions and recommendations.
· Ensured equipment and materials are in accordance with the contract and specification by monitoring and coordinating construction activities.
· Responsible for Basic Planning & Scheduling Techniques, system and procedure used in EPC companies, planning for construction activities as per identified WBS and Prepare S- Curve for plan and Progress.
· Prepare and assist with project documentation, scheduling, issue tracking, resource management and quality assurance.
· Negotiated and tracked subcontractor contracts, agreement, change order and insurance.
· Assist the project manager in project delivery.
2. Project Description- Kochi Koottanad Bangalore Mangalore Pipeline (PH II), Section III, IV & V (24” X 10.3/15.9 WT, 340 Kms, X 70/80)
Job Description:
· Coordination with Client/PMC for effective management of project.
· Responsible for preparation of extra work details as per the contract.
· Responsible for preparation of claims.
· Assist the project manager in project delivery.
· Engineering drawing review as per the contract
· Preparation of MTO/BOM.
· Prepare specifications/procedures for pipeline applications.
· Engineering support for pipeline detailed fabrication and installation drawings.
· Preparing and implementing. Execution, Inspection and Testing Plan.
· Bid proposals and project estimation.
Career History
1. Worked as Project Engineer in MECON LTD (Oil & Gas Division, New Delhi) from 01 December 2009 to 20 January 2012.
Project Description- Bawana (UP) to Nangal (PUNJAB) Pipeline (501 KM, 36”, 30”, 24”, and 18” ODx, APL 5L X-80 & X-70)
Job Description:
· Prepare specifications/procedures for pipeline applications.
· Preparation of plot plans, crossing class details etc. for pipeline project.
· Engineering support for pipeline detailed fabrication and installation drawings.
· Management of pipeline alignment sheets and design analysis support.
· Design support for pipeline activities for As-built stations which include GAD, P&ID, flow diagram, typical mechanical and electrical drawings and schematic drawings.
· Creating comprehensive correct location records, drawing, BOM, installation notes and memos to reflect additions and modification of central office.
· Analyze different designs and recommend best options.
· Preparing and implementing. Execution, Inspection and Testing Plan.
· Site inspection of all pipeline activities.
· Design of Cathodic Protection System.
· Supervise welding (SMAW, FCAW, GTAW & Automatic Welding (PWT)
· Review of Non Destructive Testing (NDT)
· Supervise Hydro Testing
2. Worked as Pipeline Engineer Trainee in ACE PIPELINE CONTRACTS PVT. LTD. From 04 May 2009 to 15 November 2009.
Project Description- Chennai to Bangalore Product Pipeline (290 KM) (Client- IOCL). A 12.75’ODx, .219’ WT. Spread II- Chittore (A.P) to Devanghotty (Bangalore, KAR), 143 KM.
Job Description:
· Construction management and procedure.
· Conducting of WPS/PQR
· Site welding (SMAW, FCAW, GTAW)
· Review of Non Destructive Testing (NDT)
· Hydro Testing
Academic Profile
1. M-Tech in Pipeline Engineering (2007-2009) from University of Petroleum and Energy Studies, Dehradun, Uttrakhand. (CGPA -3.16/4)
2. B.E. in Mechanical Engineering (2003-2007) from MIT, Mandsaur, MP. (71.88%)
Skills
· Pipeline Std. Known : ASME B31.4, B31.8, API 5L, 1104, 650, ASME SEC.-IIC
· ANST Level II : RT & UT
· Documentation : Microsoft Office (Word, Excel, PowerPoint)
· Operating System : Windows (2003, 2007, Windows 8, XP, VISTA)
Internship Undertaken
· Done Project on Precommissioning & Commissioning of Oil & Gas Pipeline.
· Done internship at Indian Oil Corporation Ltd. (Pipeline Division), Noida (Title- liquid and Gas pipeline Design) From 02/06/08 to 31/07/08
· Attended three days “Entrepreneurship Awareness Camp” organized by “Centre for Entrepreneurship Development Madhya Pradesh (CEDMAP)” – Bhopal at MIT Mandsaur from 08/08/2005 to 10/08/2005.
Personal Information
Date of birth : 28 January, 1986.
Languages known : English & Hindi
Passport Number : H3666775
Declaration: I hereby declare that the details above are correct and true to the best of my knowledge.
Signature
Alok Kumar Singh
Date and Place :