Design & analyze for ac machine (I, II, III), dc machine (I, II), transformers (I, II),

electronic, protection relays, power generation & distribution, project control, physic of electricity ,circuit electric (I,II,III), engineering mathematics, elec. motor, workshop related to all items before, some general course

Technical calculation, technical course, workshops (four years, 16houres every week) industrial workshop, electrical circuits, motor, electronic, transformer

Certificates

CMMS supervisor certificate

MAINTA supervisor and data preparation certificate

EDMS Plan procedure and user

Aluminum welding principal

Certificate of welding inspection,

HSE, PTW, H2S, Risk assessment

ICAPS awards from MBPG

Experience
Period / Company / Position title / Business sector
2010.09.01 / 2011.11.01 / Petropars Operation Management co. / Head of Electrical / Oil and Gas
Pyramid list such as system approach for every unit and package (scheduling tag) included Equipment tag, father tag, drawing no., short description, shutdown type, shutdown constraints, Isolatable tag, Isolation Type, Cost Code, Supplier, Supplier reference, Mechanical data sheet, Procedure data sheet, Manufacture name and reference, Criticality status(V,C,S),
Preservation plan maintenance PPM format preparation, PPM format included: shutdown type,
Preparation a list of equipment as system approach such as pyramid list for MAINTA software. such as TOTAL prepared in 2 phases in south pars.
Critical assessment, PPM creation, shutdown type and shutdown constrain, isolatable type and isolation tag, and any data related to maintenance and repair of each one of equipment. Plan maintenance as agenda accorded the manufactures and plan production procedure. installations (prepare database for MAINTA software such as equipment list and for each one, shutdown type, shutdown constraints, isolatable tag, isolation type and PPM.)
2008.03.01 / 2010.08.01 / South pars (MBPG) / commissioning engineer / Oil and Gas
Document preparation, FEED engineering for pre-com. & commissioning such as OPERCOM strategy prepared by TOTAL FINA ELF in phases 2,3 and by Eni in phases 4,5 as OPERCOM strategy .
Preparation plan for procurement according plan mail stone priority.
Coordination with project planner for contractor’s construction plan control.
Definition battery limits in interface between disciplines, contractors, units, system and subsystems.
Preparation test sheet and check list for electrical equipment.
Marked up SLD, P&ID and PFD then extracted electrical status index as every subsystem.
Precommissioning and commissioning procedure preparation.
Preview plan result presentation by power point.
Supervision of Cathodic protection installation and monitoring.
2007.03.01 / 2008.03.01 / Petropars LTD / Electrical commissioning supervisor / Oil and Gas
Pre-commissioning & Commissioning all panels switchgears, transformers, Motor; heater...all electrical equipment of a huge gas refinery included six train (production lines) utility, reception facilities. VSD panels and motors.
Cathodic protection, lighting, earthing, lightning.
coordination with commissioning group and operation team, and also preservation maintenance.
Support vendor’s specialist on site.
2003.09.01 / 2007.03.01 / Eni Italy (Agip) / Electrical supervisor / Oil and Gas
Construction, Pre-commissioning and commissioning supervisor. and WDN (warranty defected notification)
Pre-commissioning of electrical status index of subsystems
Visual inspection of equipment ( motors , cables, transformers,...)
Compliance with Project specs , safety rules, codes,
Quality of installation, Static Tests of equipment
« Cold testing » : calibration of instruments, machinery alignement ,(De-energised tests), static test
enter the result in ICAPS software, punch list preparation, up to RFC (Ready for commissioning)
commissioning , Definition battery limits in interface between disciplines, contractors, units, system and subsystems
Electrical motors uncoupled runs(solo run) , electrical breakers operation
Running-in and on-line tests of plant utilities, and main process equipment in closed loop (wherever applicable), Dynamic test
up to RFCU(ready for start-up
the plan strategy such as OPERCOM (TOTAL FINA ELF strategy)
control as subsystem and system status index, of everyone of
performance test and coordination with method and maintenance group for preservation maintenance
and in operation during, WDN (warranty defected notification)
2002.01.01 / 2003.08.01 / Poolad consultant engineers co / E&I supervisor / Shipping
The shipping Port in MAHSHAHR, include:
ship unloaded, stacker reclaimed & train loading include,
more than 6 km belt conveyer
Electrical and instrument & control
equipment in BIKOT project
Construction & commissioning of all electrical equipment & instrument devices.
Project analyze and control the progress
1998.09.01 / 2002.01.01 / MOSHANIR(electrical engineers consultant) / Projects coordinator and supervisor / Energy
Electrical Construction & Commissioning Supervisor & Welding inspector , Project coordinator
consultant and supervision of EHV substation and power plant switchgear supervision of projects (KARKHE, KAROON3, MASJED SOLEYMAN, CHOGHADAK, DIVANDAREH, BOOSHEHRE2) & 400KV/230KV/132KV/66KV/20KV Substations equipment disconnected switch, circuit breaker, CT, PT, REACTOR, 400/230/132/60/20kv trans., protection relays (CBF, distance, directional) in control panels.
supervision of power station basic design & construction, commissioning
aluminum bas-bar welding inspector
provide as-built drawings
control contractors invoice
Prepare learning course for construction and Commissioning supervisor.
1995.04.01 / 1998.08.01 / Hard metal project / head of maintenance / Production
Install & startup machines (spark, wire cut, chamfer, sintering, spray dryer, CVD, PVD). Main factors: Japan TOOSHIBA TANGOLO
prepare maintenance planning
prepare procedure planning
define the critical point in procedure train
1994.01.01 / 1995.03.01 / NIPC(national Iranian Petroleum Co.) / electrical supervisor / Oil and Gas
electrical supervision, BUTTACOLOR & ALACOLOR site
plant producer plant provide call of tender documents control contractor
invoice
Design power distribution in construction during
lighting design(material storage, street lighting)
Other experience, positions of trust, interests etc

Ability to work with planning software packages

Experienced in preparing reports such as weekly report & monthly report

Experience in Preparing work breakdown structure (WBS) and coding the project

Preparing of Project Invoices

Good teamwork motivation and time management ability

Ability in define interface point to point between disciplines and contractors and areas.

Ability for manage and lead disciplines in project.