Process FMEA Checklist
- PFMEA header filled out completely including traceable unique number, Team leader and key date.
- Cross functional team established, including Supplier, Manufacturing, Design Engineer, Quality etc.. Contact names are included in the header. Supporting Team is documented on PFMEA (e.g. last page).
- Quality History data (incl. Warranty & TGW), Campaign/recall data, user plant concerns, similar process PFMEA have been compiled and reviewed, component/system DFMEA used.
- Process Flow diagram, macro/micro steps, has been established, and PFMEA boundaries have been defined.
- Ford specific PFMEA structure has been used.
- The Dynamic Control Planning methodology (product characteristics influences by individual process steps) was used in the development of the PFMEA, where applicable.
- Fault Tree analysis, Failure Mode analysis or other analytical methods, were used in preparing the PFMEA.
- Process steps are described in Physical, Technical and Measurable terms.
- Potential failure modes (considering no, partial and intermittent process function) have been defined.
- Process characteristics (OS, HI), other than special characteristics (SC, CC) have been classified .
- The effects of failures address the impact on the part, the next higher assembly, system, Vehicle, operator safety, next operation, downstream operations, customer and Government regulations.
- Potential causes and/or mechanisms of failure are identified for all failure modes in correctable/controllable terms and consider people, material, methods, machines, equipment, measurement systems and environment.
- Corrective actions, responsibilities and completion dates are assigned to all potential high severity (9 & 10), high severity & occurrence numbers and high risk priority numbers.
- All potential critical and significant characteristic items from the DFMEA, have been agreed with manufacturing (supplier or plant) and have been followed up within the PFMEA.
- Each PFMEA process step has been assessed, if special controls are required, which need to be incorporated into control plans.
- Rating of severity, occurrence and detection have been revised (in accordance to the rating tables), based on verified and implemented actions.
Note:
(If line item is not fulfilled, please mark item and make comments below)