CITY OF HOUSTONPOST-BID

Standard DocumentPROJECT INFORMATION FORM

*******************************************************************************************

List of Changes:

01-10-2005:Introduced as new document.

01-18-2006:Included space for TDLR number, p. 2

04-26-2006:Correct “00502” to “00520” and a line for TDLR Number on Page 2.

09-18-2006Changed GFS to WBS

02-28-2007Removed TDLR Licensing info

05-02-2008Modified Bid Date and Contract Time to remove the “Change” limitation so that all 502s must now have the bid date and contract time listed.

08-01-2011Modified Bid Date and Contract Time.

********************************************************************************************

00502

08-01-2011

CITY OF HOUSTONPOST-BID

Standard DocumentPROJECT INFORMATION FORM

000502

01-10-2005

CITY OF HOUSTONPOST-BID

Standard DocumentPROJECT INFORMATION FORM

Document 00502

POST-BID PROJECT INFORMATION FORM

*****(Please print plainly. Verify spelling and accuracy of all names/numbers.)*****

submitted by: / date submitted: / telephone: / chief engineer and/or sr. ad approval: / telephone:

INSTRUCTIONS FOR USE:

1.Production of Project Contract documents will be initiated after this Postbid Project Information Form has been completed by Project Manager and approved by Chief Engineer or Senior Assistant Director. Approval signature indicates all information herein has been reviewed and is accurate.

2.Submit this form to the Standards Group no later than 2 days after bids are received.

3.A copy of this form will be returned along with the signature-ready Postbid Contract documents, forms, and memos within 2 working days after receipt.

4.Review prebid Project Information Form. List any edits resulting from addenda or other changes which occurred since original submittal. Make notations with a different color pen. Be sure to verify legal project name and gfs number.

00502-1

08-01-2011

CITY OF HOUSTONPOST-BID

Standard DocumentPROJECT INFORMATION FORM

WBS No.:M/N/R/S-XXXXXX-XXXX-XIs Project SRF Funded?

[ ] Yes [ ] No

Legal Project Name:

Bid Date

Contract Time

Project Location:

Key Map Grid(s):

(If numerous grids, list as various)

Brief Project Description/Scope:

Name of Responsible Low Bidder:

(Contract awarded to)

Name of Contractor Representative/Contact:

(Signer on Bid Form)

Low Bidder Address:

(Street)

(City/State/Zip)

Total Bid Price: $

Second Low Bidder:

Second Low Bidder Address:

(Street)

(City/State/Zip)

Total Bid Price: $

Amount of Surface Correction Bond: $

(Standard practice is 4% of tabulated bid amount.)

Contractor must comply with Postbid requirements by:

(Postbid package due date)

Document 00520 - Agreement:

Paragraph 3.2 - Alternate Bids: [ ] Yes (List on back.) [ ] None

Paragraph 4.2 - Progress Payment ending date: [ ] tenth [ ] twentieth [ ] last day of the month

Paragraph 4.4 - Conditions pertaining to final payment: [ ] Yes (List on back.) [ ] None

COH Drawing Number:

Paragraph 7.1.6 - Number(s) and Date(s) of Addenda:

Paragraph 7.1.7 - Other documents attached to Agreement not marked on Doc. 00520 - Agreement template. List:

END OF DOCUMENT

00502-1

08-01-2011