2017 NEC Update Part 1
RV 8.18.17
PLEASE DO NOT BOOKMARK ANY ANYTIMECE WEBPAGES!Our system will remember the last page you viewed when logging out and back in but please DO NOT exit out when taking a test. Your place will NOT be saved.
How to take this course.
1. Download and Print the test questions.
2. Login to your account with your ID and password.
3. Viewing your status page, scroll down and click on “Click here to start this course”.
4. Begin viewing the web pages. Refer to your printed test to find the correct answers. The questions track the web pages.
5. As you find the answers, circle them on your printed copy.
6. At the end of each section, you’ll enter the quiz which is the same as your printed test. Refer to your circled answers when actually answering the quiz on the web.
7. Upon passing, you will proceed to the next section. If failed to pass, you will be moved to the beginning of that section for more review.
Mobile users – Many current mobile devices are compatible with AnytimeCE and will probably work. If not, use a desktop or laptop computer to complete your course.
1
2017 NEC Update Part 1
RV 8.18.17
Quiz 1
- NEC chapters 5 through 7 cover ______.
- general occupancies
- special equipment
- utilities
- all of the answers provided
- The NEC governs all things electrical, including electrical utility storage equipment.
- True
- False
- If equipment is listed, it ______for use in every installation.
- is permitted
- is not permitted without approval
- is suitable
- may not be suitable
- NEC accessibility requirements allow for ______to gain access to electrical equipment.
- crawling under obstacles
- climbing ladders
- using keys
- using tools
- If a building is larger than the building code allows, ______.
- it must be torn down
- it can be divided by fire walls
- it must be constructed from brick
- it cannot contain any electrical equipment
- A cable routing assembly may contain ______.
- only optical fiber cables
- power-limited fire alarm cables
- uninsulated conductors
- all of the answers provided
- Computers, routers, servers and ______are becoming essential to the transmission of audio, video and data.
- their powering equipment
- DVD players
- their shipping containers
- stereos
- A communications raceway may contain ______.
- any type of cable
- optical fiber cables
- anything related to communications
- only copper conductors
- A cord connector designated for hazardous locations must include ______.
- an explosion-proof seal
- a flameproof seal
- either of the answers provided
- none of the answers provided
- Dusttight enclosures are designed to prevent dust from entering______.
- except under extreme conditions
- under specified conditions
- in outdoor environments
- in hazardous environments
- The NEC’s definition of electric signs does not include those that are ______.
- illuminated
- portable
- non-illuminated
- none of the answers provided
- A Field Evaluation Body (FEB) performs field evaluations of ______.
- electrical equipment
- wire coating
- hazardous locations
- inspector compliance
- Equipment that has been labeled by a Field Evaluation Body indicating that it was found to comply with requirements is called ______.
- suitable
- non-hazardous
- dusttight
- field labeled
- A photovoltaic system converts solar energy into electrical energy ______.
- that is useless for any practical applications
- with the use of the wind
- for connection to a utilization load
- only for self-contained systems
- A process seal for hazardous locations is a seal between electrical systems and ______.
- the surrounding air
- flammable or combustible fluids
- flood water
- none of the answers provided
- A raceway may be nonmetallic.
- True
- False
- A receptacle is a______installed at the outlet for the connection of an attachment plug.
- surge protector
- bare conductor termination
- watertight seal
- contact device
- The NEC’s definition of a structure includes ______.
- a free-standing switchboard
- a light pole
- an electric sign
- none of the answers provided
- A ______is an assemblage of equipment through which electric energy is passed for the purpose of distribution.
- photovoltaic cell
- fuse
- substation
- conductor
Quiz 2
- Product testing, evaluation and listing may be performed by ______.
- recognized qualified electrical testing laboratories
- an inspector in the field
- any licensed electrician
- all of the answers provided
- The NEC has specified that all conductors are to be ______or ______unless otherwise specified.
- sealed, protected
- copper, aluminum
- glued, stapled
- titanium, steel
- Equipment intended to interrupt current at fault levels shall have an interrupting rating at nominal circuit voltage ______the current that is available at the line terminals of the equipment.
- greater than
- less than
- at least equal to
- suitable for
- Equipment identified ______, such as “dry locations,” “indoor use only” or “damp locations” shall be protected against damage from the weather during construction.
- only for outdoor use
- as refurbished
- with a field label
- only for indoor use
- The 2017 NEC ______the use of a calibrated torque tool to achieve the indicated torque when installing electrical equipment.
- requires
- prefers
- recommends
- does not allow
- The NEC requires that arc-flash hazard warning labels contain ______.
- a picture of a lightning bolt
- a bright yellow background
- the date the label was applied
- the initials of the person who applied the label
- The NEC does not require service equipment labeling if an arc-flash label is applied in accordance with acceptable industry practice.
- True
- False
- The marking requirement for reconditioned equipment states that the label must contain ______.
- the current owner’s company name
- an orange background
- the date of the reconditioning
- the date of original manufacture
- The NEC does not require reconditioned equipment to be labeled when ______.
- there’s no good place to put a label
- the equipment is only accessible by qualified service persons
- it’s obvious that the equipment is not new
- the equipment is located where no one would likely see the label anyway
- Field-applied hazard markings must warn of ______using effective words, colors, symbols or any combination of the three.
- ambient air temperature
- water proximity
- conductor size
- hazards
- The calculation of the available fault current of an electrical system ______.
- must be made available to authorized inspectors
- can only be done for residential installations
- should not be stored with other documentation
- all of the answers provided
- Where equipment operating at 1000 volts or less to ground that requires servicing while energized is installed above a lay-in ceiling, the accessible opening must be ______.
- smaller than 22 inches by 22 inches
- at least 30 inches by 30 inches
- no less than 22 inches by 22 inches
- large enough to fit two electricians working side by side
- Equipment operating at 500 volts or less to ground that requires adjustment while energized is installed in a crawl space with limited access. The accessible opening must be ______.
- at least 22 inches by 22 inches
- approved for equipment servicing
- no further than 6 feet from an exit
- no less than 22 inches by 30 inches
- In enclosures with exposed live parts, ______must be separated from high-voltage equipment by a suitable partition, fence or screen.
- residential spaces
- low-voltage equipment
- communications raceways
- water pipes
- Illumination for working spaces around service equipment ______.
- can be automatic as long as there is also a manual override
- should not use LED bulbs
- must be at least 12 inches from the service equipment
- must turn on automatically
- Roof extensions are not permitted in the working clearance space around electrical equipment.
- True
- False
- Outdoor electrical equipment shall be installed in ______.
- metallic boxes requiring key access
- locked buildings
- enclosures rated for hazardous locations
- identified enclosures
- Live parts of electrical equipment operating at ______shall be guarded against accidental contact by approved enclosures or elevation above the floor.
- standard temperature
- high altitudes
- 50 to 1000 volts nominal
- maximum capacity
- A complete electrical system design shall be made available to the AHJ and shall be tested when ______.
- first installed on site
- the AHJ is available to watch
- the AHJ is not available to watch
- the installation is 50% complete
Quiz 3
- NEC Article 210 provides general requirements for ______.
- enclosure fill calculations
- conduit and tubing sizing
- wiring methods
- branch circuits
- The 2017 NEC conductor grouping requirements for multi-wire branch circuits mandate that all ungrounded and neutral circuit conductors must______in every enclosure.
- not be grouped together
- be grouped together
- be at least 10 AWG
- not touch each other
- In an installation with an existing voltage system where a new voltage system is being added, it is permissible to ______.
- not mark the new system when it’s easy to tell them apart
- mark only the old system as “OLD SYSTEM”
- mark the new system with a ball-point pen
- mark only the new system voltage
- For branch circuits supplied from DC systems, the NEC permits size ______conductors to be marked at termination, connection and splice points, rather than along the entire length of the conductor.
- 2 AWG
- 4 AWG
- 8 AWG
- none of the answers provided
- When determining the distance from a receptacle to a bathtub, measure the shortest path an appliance cord connected to the receptacle would follow, even for receptacles located outside the bathroom doorway.
- True
- False
- GFCI protection in unfinished portions of dwelling unit basements ______.
- must be installed
- must not be installed
- must be installed only if someone occasionally sleeps in the unfinished basement
- must not be installed if the area is used for food storage
- To determine if a GFCI receptacle is required near a sink in a dwelling unit bathroom, measure from the receptacle location to ______.
- the outside edge of the sink
- the top inside edge of the sink bowl
- the center of the sink drain
- none of the answers provided
- In commercial building crawl spaces, ______must have GFCI protection.
- single-phase receptacles rated 150 volts to ground
- three-phase receptacles rated 250 volts to ground
- both of the answers provided above
- none of the answers provided
- Lighting outlets in crawl spaces are required to be GFCI protected ______.
- in any building where the crawl space is less than 3 feet tall
- only in residential buildings
- only in non-dwelling units
- in both residential and commercial buildings
- At least one 120-volt, 20-amp dedicated branch circuit shall be installed to supply receptacle outlets in ______.
- detached garages with electrical power
- detached garages without electrical power
- detached garages with only one stall
- none of the answers provided
- 120V, single-phase, 15A and 20A branch circuits supplying outlets and devices installed in ______of hotels shall be AFCI protected.
- medicine cabinets
- conference rooms
- guest rooms
- workout rooms
- When calculating wall space for receptacle installation, it is not necessary to include ______.
- spaces less than 2 feet wide
- spaces with countertops
- space measured around corners
- none of the answers provided
- A receptacle outlet to serve a specific appliance______to be supplied from an individual branch circuit rated 15 amps or greater.
- may not be permitted
- is never allowed
- shall be required
- shall be permitted
- A peninsular countertop measuring ______does not require a receptacle outlet.
- 20 inches wide by 24 inches long
- 12 inches wide by 30 inches long
- 12 inches wide by 20 inches long
- 14 inches wide by 22 inches long
- In an attached garage, at least one receptacle outlet must be installed ______. (choose the best answer)
- in each vehicle bay
- higher than 5-1/2 feet above the floor
- both of the answers provided
- neither of the answers provided
- A receptacle outlet must be installed within 25 feet of indoor service equipment.
- True
- False
- Where the service voltage is greater than 120 volts to ground, a receptacle outlet is not required for services dedicated to ______.
- solar cells
- pond filtration pumps
- industrial washing machines
- none of the answers provided
- When installing dimmer switches for dwelling unit stairwell lighting, ______.
- three-way switches must be used
- four-way switches must be used
- dimmer switches must be installed at each switch location
- only dial-type dimmer switches may be used
- In utility rooms containing equipment requiring servicing, ______containing a switch or controlled by a wall switch shall be installed.
- at least one lighting outlet
- at least one receptacle outlet
- at least one panelboard
- all of the answers provided
- When determining the required number of receptacle outlets for a non-dwelling meeting room, ______must be considered.
- the number of computers likely to be used in the room at one time
- the number of overhead lights
- the minimum size of the room with the partitions in place
- none of the answers provided
Quiz 4
- If the OCPD protecting the feeder in an assembly is listed for operation at 100% of its rating, the allowable ampacity of the minimum-sized feeder conductors must be at least the sum of the noncontinuous load plus______of the continuous load.
- 80%
- 90%
- 100%
- 125%
- Where a portion of a feeder is connected at both its supply and load ends to separately installed pressure connections, the allowable ampacity must be at least ______.
- 125% of the noncontinuous load
- 125% of the continuous load
- the sum of the continuous load plus the noncontinuous load
- the sum of 125% of the continuous load plus the noncontinuous load
- Grounded conductors that are ______are permitted to be sized at 100% of the continuous and noncontinuous load.
- at least size 10 AWG
- not connected to an overcurrent device
- connected to an overcurrent protection device
- installed in flexible metal conduit
- The 2017 NEC Article 220 provides requirements for calculating ______.
- branch-circuit size
- feeder installation
- enclosure fill
- service loads
- Table 220.12 General Lighting Loads by Occupancy provides a value of ______for schools.
- 2 VA per sq. ft.
- 3 VA per sq. ft.
- 3.5 VA per sq. ft.
- 1.2 VA per sq. ft.
- Using NEC Article 220.12 Exception No. 2 and Table 220.12 for a 75,000-sq. ft. bank building with a continuous lighting load, the minimum lighting load is ______.
- 328,125 VA
- 187,500 VA
- 234,375 VA
- 262,500 VA
- Using NEC Article 220.12 Exception No. 2 and Table 220.12 for a 125,000-sq. ft. office building with a continuous lighting load, the minimum lighting load is ______.
- 234,375 VA
- 328,125 VA
- 546,875 VA
- 390,625 VA
- The minimum unit lighting load for a grocery store is ______.
- 3-1/2 VA per square foot
- 2 VA per square foot
- 3 VA per square foot
- 1 VA per square foot
- When determining existing service loads, the calculation can be based on load data measured for 30 days in the event that maximum demand data for ______is not available.
- adjacent buildings
- existing refurbished equipment
- a 2-year period
- a 1-year period
- A mast supporting overhead feeder conductors must have adequate strength to safely withstand the strain imposed by the overhead conductors or it must be supported by ______.
- extra couplings
- a wide metal base
- braces or guys
- none of the answers provided
- Overhead spans of open multiconductor cables over rooftops must have vertical clearance of ______.
- no more than 8 feet 6 inches
- no more than 8 feet
- no less than 8 feet
- no less than 8 feet 6 inches
- Raceways on building exteriors are required to be ______.
- arranged to drain
- approved by the AHJ
- listed for use in hazardous locations
- all of the answers provided
- Raceway sealants must be ______.
- listed for the purpose
- identified for use with the components present
- explosion-proof
- approved for use in hazardous locations
- Electric vehicle charging stations may be listed, labeled and identified for more than one feeder or branch circuit.
- True
- False
- Service raceways are permitted to contain ______.
- feeder conductors
- branch-circuit conductors
- overcurrent protection devices
- service conductors
- The 2017 NEC allows trees to be used to support ______.
- overhead service conductors
- electrical service equipment
- both of the answers provided
- none of the answers provided
- Overhead service conductors ______.
- may not pass over railroad tracks
- must clear railroad tracks by at least 20 feet
- must clear railroad tracks by at least 24-1/2 feet
- must cross railroad tracks underground
- Metal support structures supporting overhead service conductors passing over a roof must be bonded to ______.
- the grounded overhead service conductor
- the side of the building
- an additional metal structure that touches the ground
- the rooftop
- For an installation with a 200A, 3-phase, continuous load with 3 current-carrying copper conductors with insulation rated at 75°C, what size service-entrance conductors are required?
- 4/0 AWG
- 250 AWG
- 300 AWG
- 350 AWG
- For an installation with a 240A, 3-phase, continuous load with 3 current-carrying copper conductors with insulation rated at 75°C, what size service-entrance conductors are required?
- 250 AWG
- 300 AWG
- 350 AWG
- 400 AWG
- Cables permitted for use in cable trays ______.
- must be listed for use in cable trays
- must be field labeled with “CT”
- must be marked by the manufacturer with “CT”
- all of the answers provided
- Raceways enclosing service-entrance conductors must be listed or approved as rainproof.
- True
- False
- The 2017 NEC requires that service heads on service-entrance cables are located ______the service drop.
- below the point of attachment of
- above the point of attachment of
- above the roofline of
- within a gooseneck at
- A meter socket does not need to be listed when ______.
- it is rated for the voltage and ampacity of the service
- it’s an individual meter socket
- it is going to be field labeled
- it’s under the exclusive control of an electric utility
- The NEC does not allow ______to be connected to the supply side of a service disconnect.
- solar PV systems
- batteries
- HVAC equipment
- wind electric systems
- Where fuses are used as the service overcurrent device, the ______shall be located ahead of the supply side of the fuses.
- meter socket
- disconnecting means
- attach point
- raceway
Quiz 5
- According to Table 240.6(A), ______is a standard ampere rating for a fuse.
- 45
- 55
- 65
- 75
- If we calculate the minimum ampere rating for a fuse of 180 amps, what standard ampere rating fuse should we select?
- 175 amps
- 200 amps
- 210 amps
- 300 amps
- If a tool is required to open an industrial control panel, it is considered to be ______.
- not readily accessible
- not suitable for use
- readily accessible
- suitable for use with AHJ approval
- If a 1500 A fuse has a clearing time of .08 seconds at the available arcing current, ______.
- the NEC does not permit its use
- another method of arc energy reduction must be provided
- the AHJ must approve it for use in that installation
- differential relaying must be used
- If arcing currents exceed the instantaneous trip level, the circuit breaker will trip ______.
- in the maximum possible time
- before a fire can start
- when the arc energy increases
- in the minimum possible time
- NFPA 780-2014, Standard for the Installation of Lightning Protection Systems provides information on installation of grounding and bonding for lightning protection systems.
- True
- False
- In order to stop objectionable current, the NEC permits ______alteration(s).
- installer-tested
- multiple
- only one
- objectionable
- Class 2 load-side circuits for suspended ceiling low-voltage power grid distribution systems shall not be______.
- readily accessible
- installed below a height of 6-1/2 feet from the floor
- grounded
- none of the answers provided
- The grounded conductor in a single raceway or cable shall not be ______specified in Table 250.102(C)(1).
- larger than
- smaller than
- of any type
- insulated, as
- If a building is supplied by a feeder from an outdoor separately derived system, a system bonding jumper at both the source and the first disconnecting means shall be permitted.
- Yes, if the AHJ approves it.
- No, this is never permitted.
- Yes, if it does not establish a parallel path for the grounded conductor.
- Yes, but only if the separately derived system is a transformer.
- The ______must be used as the grounding electrode for a separately derived alternating-current system.
- building or structure grounding electrode system
- closest water pipe
- largest metal structural element
- all of the answers provided
- The common grounding electrode conductor for a separately derived alternating-current system is permitted to be ______.
- any metal pipe
- any PVC pipe
- a metal water pipe
- a metal gas pipe
- A metal in-ground support structure in direct contact with the earth ______, with or without concrete encasement is permitted to be used as a grounding electrode.
- horizontally for at least 20 feet
- vertically for at least 10 feet
- vertically for no more than 10 feet
- over an area of at least 10 square feet
- ______are permitted to be used as grounding electrodes.
- Swimming pools
- Aluminum structures, provided they’re underground,
- Metal gas pipes
- none of the answers provided
- A ground ring must be installed at least ______below the surface of the earth.
- 30 inches
- 42 inches
- 36 inches
- 48 inches
- Bonding together of all separate grounding electrodes will limit ______differences between them and between their associated wiring systems.
- ampacity
- material
- voltage
- all of the answers provided
- A 6 AWG or larger copper or aluminum grounding electrode conductor not exposed to ______shall be permitted to be run along the surface of the building construction without metal covering or protection.
- moisture
- excessive heat
- rain
- physical damage
- A 6 AWG or larger copper or aluminum grounding electrode conductor exposed to possible physical damage must be protected in ______.
- RMC
- cable armor
- PVC
- any of the answers provided
- Grounding electrode conductors in contact with the earth shall be buried or otherwise protected ______.
- if subject to physical damage
- unless subject to physical damage
- if subject to flooding
- unless larger than 6 AWG
- Bonding jumpers from grounding electrodes are permitted to be connected to an aluminum or copper busbar ______and of sufficient length to accommodate the number of terminations necessary for the installation.
- at least 3/8-inch-thick by 2 inches wide
- at least 1∕4-inch-thick by 2 inches wide
- no larger than 1/4-inch-thick by 2 inches wide
- none of the answers provided
- If a grounding electrode conductor is connected to a single concrete-encased electrode and does not extend to any other electrode requiring a larger size conductor, the grounding electrode conductor does not need to be larger than ______copper wire.
- 8 AWG
- 6 AWG
- 4 AWG
- 2 AWG
- If a bonding jumper is connected to a 6 AWG copper ground ring and extends to another electrode requiring a 4 AWG conductor, the bonding jumper does not need to be larger than ______.
- 4 AWG
- the size specified by the AHJ
- the size specified by Table 250.66
- 6 AWG
- A grounding electrode conductor is permitted to extend the connection to an electrode by being connected to interior metal water pipe that is electrically continuous with a metal underground water pipe electrode and located not more than 5 feet from the point of entrance to the building.
- True
- False
- ______securing the structural steel column that are connected to a concrete-encased electrode that complies with 250.52(A)(3) and is located in the support footing or foundation shall be permitted to connect the metal structural frame of a building or structure to the concrete encased grounding electrode.
- Concrete structures
- Hold-down bolts
- Metal rivets
- all of the answers provided
- A rebar-type concrete-encased electrode with an additional rebar section extended from its location within the concrete to an accessible location ______shall be permitted for connection of grounding electrode conductors and bonding jumpers.
- at least 18 inches above the earth
- along the building structure
- that is not subject to corrosion
- within 5 feet of the point of entry to the structure
1