West Sussex County Council Project Cost Check

West Sussex County Council Project Cost Check

WEST SUSSEX COUNTY COUNCIL PROJECT COST CHECK

CAPITAL AND ASET MANAGEMENT

PROJECT: / CLIENT SERVICE: / NUMBER:
PROJECT MANAGER: / DATE:
PROJECT NO: / LEAD CONSULTANT:
SUMMARY OF COST REPORTS / QUANTITY SURVEYOR:
ELEMENT GROUP / PROJECT COST PROFILE / NO: / NO. / NO. / PRE-TENDER ESTIMATE:
BASE DATE / BASE DATE / BASE DATE / BASE DATE / BASE DATE
Net Building Cost
Additional Costs
Adaptations/Revenue items
Abnormals
ICT infrastructure
Design Contingency
SUB TOTAL
Supply of Client Equipment (see BCD20)
TOTAL (gross)
Projected Cost to date of possession
Adjusted Total Cost
Floor area
Net Building cost per m2
Gross Building cost per m2 / m2
£
£ / m2
£
£ / m2
£
£ / m2
£
£ / m2
£
£
Fee Allowance
Loose Equipment Allowance
ICT Equipment Allowance
TOTAL PROJECT COST
Compiled by: / Discussed at Design Review/\Cost Check Meeting dated: / Distribution: / Client / PM / PO / Date of Possession: / Date for Completion:

N.B. (1) Additional costs are external works items E100b (3/05)

(2) Adaptations/Revenue items are minor building works, refurbishment and repair items (BCD 28)

Element / PROJECT COST PROFILE / DATED: / COST CHECK NO: / DATED: / COST CHECK NO: / DATED:
Gross internal Floor area / m2 / Price Base Date: / Gross internal Floor area / m2 / Price Base Date: / Gross internal Floor area / m2 / Price Base Date
Cost
£ / Cost per m2 / % of net bldg cost / Brief Specification* / Cost
£ / Cost per m2 / % of
net bldg cost / Brief Specification* / Cost
£ / Cost per m2 / % of
net bldg cost / Brief Specification*
NET BLDG COST
Foundation
Frame
Upper Floor
Roof
Staircases
Ext. Walls
Windows and
Ext. Doors
Internal Walls and Partitions
Int. Doors and Screens
BLDG COST – carried frwd. / Carried forward / Carried forward / Carried forward
Element / PROJECT COST PROFILE / DATED: / COST CHECK NO: / DATED: / COST CHECK NO: / DATED:
Cost
£ / Cost per m2 / % of net bldg
cost / Brief Specification* / Cost
£ / Cost per m2 / % of
net bldg cost / Brief Specification* / Cost
£ / Cost per m2 / % of
net bldg cost / Brief Specification*
NET BLDG.
COST
B/frwd. / B/frwd. / B/frwd.
Wall Finishes
Floor Finishes
Ceiling Finishes
Fittings
Sanitary Fittings and disposal
ENGINEERING / ENGINEERING / ENGINEERING / ENGINEERING
Mechanical / ) / Total / % / ) / Total / % / ) / Total / %
Electrical / ) / ) / )
Lifts
Preliminaries
Contingencies
TOTAL NET BUILDING COST / 100% / TOTAL NET BUILDING COST / TOTAL NET BUILDING COST
Element / COST CHECK NO. / DATED: / COST CHECK NO: / DATED: / COST CHECK NO: / DATED:
Cost £ / % of net bldg cost / Brief Specification* / Cost £ / % of net bldg cost / Brief Specification* / Cost £ / % of net bldg cost / Brief Specification*
**ADDITIONAL COSTS / HPA / M2 / HPA / M2 / HPA / M2
*Preliminaries
*Contingencies
TOTAL ADDITIONAL COSTS
**ADAPTATIONS/ REVENUE ITEMS
**ABNORMALS
*Preliminaries
*Contingencies
SUB TOTAL
** FIXED EQUIPMENT
TOTAL

TOTAL

/

TOTAL

/

TOTAL

* where not included in above figures  provide additional information on

** all amounts to include a proportion of contingencies and preliminaries separate sheet if appropriate