Risk Action Plan Template

(Taken from CGG Event Application Package)

Event Risk Action Plan Guidelines

Event Coordinators are advised that this document is the required standard for risk action plans undertaken for Events in the City. Should the Event already have a risk action plan of a similar standard which is in accordance with the Australian Standard for Risk Management that maybe submitted in its place.

Definitions:

Risk –the chance of something happening that will have a detrimental impact on event objectives.

Risk Assessment –the overall process of risk identification, risk analysis and risk evaluation.

Risk Management – the processes and structures that are put into place to achieve objectives whilst managing any adverse side effects.

Risk Identification – is a matter of identifying the hazards/risks, which may occur during the event. Following is a list that can be used as a prompt to assess the risks/hazards that are either present, or may occur during the event.

Example Risks may include

Note: this is not an exhaustive list

Page 1 of 8

Risk Action Plan Template

(Taken from CGG Event Application Package)

Health/Injury/Disease

  • Drug affected persons
  • Alcohol affected persons
  • Fire caused by electrical installations
  • Fire risk caused by gas bottles
  • Marque collapse
  • Broken glass on reserve
  • Food Poisoning
  • Power Failure
  • Water Failure
  • Manual handling
  • Working at heights
  • Exposure to chemicals
  • Unclean toilets

Criminal Activity

  • Disorderly conduct
  • Consumption of alcohol

Environmental Risk

  • Noise nuisance caused to neighbours
  • Excessive litter left at the event

Legal/Contractual

  • Loss of key contractors

Operational/Crowd Safety

  • Overcrowding/crowd control
  • Lighting failure
  • Trip hazards
  • Extreme weather conditions
  • Inadequate toilet facilities
  • Communications failure
  • Rides and amusements – jumping castles
  • Fireworks malfunctions

Traffic Management

  • Lack of parking
  • Inadequate access for emergency vehicles
  • Inadequate pedestrian safety

Promotion/PR

  • Inadequate funding
  • Loss of key personnel

Page 1 of 8

Risk Action Plan Template

(Taken from CGG Event Application Package)

Risk Analysis -once risks are identified they should be evaluated on a 2 dimensional matrix which rates the likelihood of the hazard and the scale of the possible consequences. By undergoing this process it is possible to analyse the seriousness of the risk that in turn assists to determine which risks need to be treated and which risks are considered to be acceptable.

The following matrices can be used for this process:

Table 1: Example Consequence Matrix

Level

/ Descriptor / Consequence Details
1 / Insignificant / No injuries, low financial loss
2 / Minor / First Aid required, temporary halt of event, medium financial loss
3 / Moderate / Medical treatment required, external assistance required, high financial loss
4 / Major / Extensive injuries, major halt of event, emergency services, major financial loss
5 / Catastrophic / Death, potential prosecution, catastrophic financial loss

Table 2:Example Likelihood Matrix

Level

/ Descriptor / Likelihood Details
5 / Almost Certain / Is expected to occur in most circumstances, more than once a year
4 / Likely / Will probably occur in most circumstances, once a year event
3 / Possible / Might occur at some time, once in 3 year event
2 / Unlikely / Could occur at some time, once in 10 year event
1 / Rare / May Occur at some time, once in 15 year event

Risk Evaluation–by using the above tables the risk ca3n be assessed as either low, medium, high or extreme. This can be demonstrated in Table 3 below.

Table 3: Example Consequence Table

Consequence
1
Insignificant / 2
Minor / 3
Moderate / 4
Major / 5
Catastrophic
Likelihood / 5 – Almost Certain / Moderate
5 / High
10 / High
15 / Extreme
20 / Extreme
25
4 – Likely / Low
4 / Moderate
8 / High
12 / High
16 / Extreme
20
3– Possible / Low
3 / Moderate
6 / Moderate
9 / High
12 / High
15
2 – Unlikely / Low
2 / Low
4 / Moderate
6 / Moderate
8 / High
10
1 – Rare / Low
1 / Low
2 / Low
3 / Low
4 / Moderate
5
Risk Controls -All risks need to be eliminated where possible. However, this is not always possible therefore other measures need to be taken to reduce the risk and create a safer event. Use of the hierarchy of controls may be of assistance in this process.

Hierarchy of Controls

  • ELIMINATE– e.g. ban the use of jumping castles on days where winds exceed 30km/per hour
  • SUBSTITUTE – e.g. replace ladder with a scissor lift or step platform, use weights instead of pegs for securing structures and marquees.
  • ENGINEERING CONTROLS – e.g. glass shields in front of food preparation and serving areas, barriers to prevent pedestrian access
  • ADMINISTRATIVE CONTROLS – e.g. training and induction for all event staff, emergency plans, worksite inspections
  • PERSONAL PROTECTIVE EQUIPMENT (PPE) – e.g. sunhats, sunscreen, long sleeve clothing, high visibility vests, enclosed footwear.

The Risk items listed below are risks that most events are exposed to in one form or another. Should a risk item not be relevant to the event delete it or state NA

Risk Item / Consequence / Likelihood / Risk Rating / Preventative Controls
Prior to Risk Occurring / Due Date
For Preventative Controls / Response Controls
If Risk Occurs / Responsible Person
For Risk
1.1 Medical Incidents
- Minor Injuries
1.2 Medical Incidents
– Moderate-Major Injuries
1.3 Fatality
1.4 Dehydration
2.1 Asset Damage
2.2 Damage to lawn by heavy vehicles
2.3 Damage to Temporary Fence
2.4 Excessive Noise

Page 1 of 8

Risk Action Plan Template

(Taken from CGG Event Application Package)

Risk Item / Consequence / Likelihood / Risk Rating / Preventative Actions
Prior to Risk Occurring / Due Date
For Preventative Action / Response Actions
If Risk Occurs / Responsible Person
2.5 Illegal Street traders and entertainers
2.6 Littering
2.7 Reticulation timing
2.8 Lack of electrical Compliance approval
3.1 Broken Glass
3.2 Syringes
4.1 Fire on stage
4.2 Temporary structure fire
4.3 Vehicle fire
5.1 Injury sustained at the event
6.1 Delays in Public Transport
7.1 Communication failure
7.2 Sound Equipment Failure
8.1 Run out of food
8.2 Run out of water
8.3 Access to free water supply
9.1 Bomb Threat
9.2 Criminal conduct

Page 1 of 8

Risk Action Plan Template

(Taken from CGG Event Application Package)

Risk Item / Consequence / Likelihood / Risk Rating / Preventative Actions
Prior to Risk Occurring / Due Date
For Preventative Action / Response Actions
If Risk Occurs / Responsible Person
9.3 Disorderly conduct
9.4 Illegal Alcohol Consumption
9.5 Person on unsafe viewing platform
9.6 Substance overdose
10.1 Need to evacuate
10.2 Structural Collapse
11.1 Lost property
11.2 Lost children
12.1 Event delayed
12.2 Lack of contact details
13.1 Inclement weather (Plan B)
13.2 Electrical storm
13.3 Heavy Rains
14.1 Contractor No show
14.2 Inadequate briefing
14.3 Lack of Performers

Page 1 of 8

Risk Action Plan Template

(Taken from CGG Event Application Package)

Risk Item / Consequence / Likelihood / Risk Rating / Preventative Actions
Prior to Risk Occurring / Due Date
For Preventative Action / Response Actions
If Risk Occurs / Responsible Person
14.4 Lack of crowd control staff
14.5 Forced redeployment of emergency services
14.6 Key personnel no show
15.1 Wet/Slippery or uneven ground
15.2 Lack of disabled access
15.3 Overcrowding
16.1 Public toilet failure
16.2 Power failure
17.1 Illegal parking and obstruction
18.1 Car and Pedestrian Crash
18.2 Lack of emergency service access
19.1Tripping over cables
19.2 Stage invasion
19.3 Stage electrocution
19.4 Crowd surfing and diving
20.1 Food contamination
20.2 Lack of Refuse Disposal

Page 1 of 8

Risk Action Plan Template

(Taken from CGG Event Application Package)

Risk Item / Consequence / Likelihood / Risk Rating / Preventative Actions
Prior to Risk Occurring / Due Date
For Preventative Action / Response Actions
If Risk Occurs / Responsible Person
20.3 Non Compliance with Health (Food Hygiene) Regulations 1993
20.4 Non Compliance with Health (Public Buildings) Regulations 1992
Lighting Failure
Insert Risk
Insert Risk
Insert Risk
Insert Risk
Insert Risk
Insert Risk
Insert Risk
Insert Risk
Insert Risk
Insert Risk

Page 1 of 8

Risk Action Plan Template

(Taken from CGG Event Application Package)

Site Plan
It is required that Event Coordinators provide a basic layout of their stalls, structures, features and equipment. This is to inform the City of your specific requirements and any specific risks that need to be accounted for in the overall event management.
Please be advised that the City acknowledges that issues on the day may require minor variation to the below basic layout and this is accepted and such changes can take place. The City however requires notification if a significant change takes place as this may need to be accounted for in the overall event management approval.
Event Coordinators are to advise the Dimensions of any stalls or structure (i.e. 2m x 2m) ______
Possible features may include the follow:
Equipment / Electricitycables / Tables / benches
Seating / First aid if required / Fire extinguisher if required
Cooking equipment / Lighting / Possible Marquee/ tent guide lines or tie down points
Stall Specific equipment / Water sources / Marquee entrances and walls if relevant
Please use below guide to draw your layout

Page 1 of 8