SumitTiwari
B-14/2,Best Rajdoot C.H.S,
PantnagarGhatkopar(E),
Mumbai-400 075. / Email:
Contact no: +91 9768815186
CAREER OBJECTIVE:

Seeking a position to utilize my skills for the mutual benefit in an organization that offers professional growth by being resourceful, innovative and flexible.

ACADEMIC RECORDS:
Academics / College / Board/university / Percentage
% / Year of passing / Class obtained
B.E. (Electrical
Engineering) / LokmanyaTilak College Of Engineering / Mumbai / 66.5 / May-2012 / First class
WORK EXPERIENCE:

1)-CBRE South Asia Pvt Ltd.-Electrical Engineer from 1st April 2014 to till date at Aditya Birla Science Technology Center.

  • Electrical load estimation, maximum demand, Power factor calculation.
  • Coordination with consultant for the planning of electrical system, Utilities and machineries.
  • Coordination with consultant for the tendering and finalization of the contract for Electrical system.
  • Execution of the project engineering involving Installation, commissioning & testing of electrical equipments such as HT switchgear consist of VCB ,SF6 Breaker, HT/LT motor cable(22 KV,6.6KV).
  • 22/0.433KV Distribution Transformer, UPS,Battery charger,VFD.
  • Protection system include Microprocessor & Numerical relay also D.G set with AMF panel.
  • Daily Power monitoring,Calculation & reporting at monthly basis.
  • Testing carried out every year all electrical system (Earthling pit, ACB breaker, SF6 Breaker, transformer oil).
  • Knowledge and operation of AC Drive DANFOSS make.
  • Maintenance and troubleshootingOf DGset Powerica (1050KVAx1 no.& 500 KVA).
  • HVAC System (Chiller, AHU,VAV) & Having York make 2 no. of chiller (200X2 no of TR) and another kirloskarmake Chiller is 600TR also 26 no. of AHU.
  • Knowledge of calculation of CFM of area.

2)- Supermax Personal Care Pvt. Ltd -Maintenance and project Jr. Engineer (Electrical) since Sept. 2012 to till 31st march 2014.A reputed organization, major manufacture of razor blades& shaving system with brand name supermax.

PROJECT:
  • Installed 600TRkirloskar make chiller (Primary pump, condenser pump also 720 TR cooling tower,13000 CFM AHU).
  • Project on 1500 KVA AVR installation work to control the voltage of the system.
  • Done Project on installation of 16 no. of lubra m/c from cable installation to m/c panel installation In Supermax Personal care Pvt. ltd about 195 KW load.

Maintenance and Trouble shooting:
  • Having Transformer 2MVA, 1500KVAX2 no., 750KVA, 500KVA and 5200 KVA Maximum Demand.
  • Testing carried out every year all electrical system (Earthling pit, ACB breaker, SF6 Breaker, transformer oil) .
  • Knowledge OF transformer RTCC setting for desire Voltage in OLTC Transformer.
  • Maintenance and troubleshooting Of compressor,DG set Caterpillar and Powerica (1250KVAx2 no.& 500 KVA) HVAC System (Chiller, AHU,VAV) & Having York make 2 no. of chiller (200X2 no of TR) and another kirloskar make Chiller is 600TR also 26 no. of AHU.
  • Planning and effecting preventivepredictive maintenance,overhauling,repair schedule of various machine and instrument to increase machine up time and long term equipment reliability.
  • Proactive identifying areas of obstruction, break downs and taking corrective steps to rectify the equipments through application of troubleshooting tools.
  • Under take periodic checking and maintenance of electrical machines Carryout, panels.
  • Attend breakdowns in plant &Identifying problems of equipment that may cause interruption in smooth running of plant.
  • Conduct preventive maintenance as per planning.
  • Carryout modification to minimized downtime &increase efficiency of system.
  • Prepare daily report, remark and equipment history.
  • Dealing with integrated material management system.
  • Manpower planning and control.
  • Regular updating of stocks of spare material of electrical maintenance.
  • Preparation of indent for new electrical equipment and monthly electrical expenditure.
  • Material procurement through SAP and maintaining minimum spares for attending breakdown and reducing breakdown time.
  • Coordination with various department for smooth functioning of the equipment by feedback and suggestion from them.
  • Maintenance of induction Furnace, Grinding m/c,wrapping m/c, CRM.

DRAWING STUDY:

•Design Calculation.

•Preparation of SLDs.

•Knowledge of selecting &sizing of electrical equipments.

•Done electrical AutoCAD 2010 course from cad center Mumbai.

•Having experience in Induction furnaces breakdown & its operation.

•Knowledge of control diagram, Starter size and relay size calculation for motor and breaker.

•Knowledge of illumines system and earthing system.

•Electrical load estimation, maximum demand, Power factor calculation.

SOFTWARE PROFICIENCY:
  • Languages: JAVA, C++.
  • Operating Systems: Windows 8/7/vista/XP/03, UNIX (overview)

PERSONAL PROFILE:

Father’s Name:SurendranathTiwari.

Mother’s Name:MadhuriTiwari

Nationality:Indian

Date of Birth :13th of May 1989.

Languages Known:English, Hindi and Marathi.

DECLARATION:

I hereby affirm that the information in this document is accurate and true to the best of my knowledge and I bear responsibility for the same.

Place:Mumbai. (Sumit. S.Tiwari)

Page | 1