Al Rawdha World Center Trad. & Cont. LLC.
P.O. Box 335, Postal Code 133, Al Khuwair, Sultanate of Oman
C.R. No. 1/02694/8, Phone: 24479934, Fax: 2447556, email:
Al Rawdha World Center Trad. & Cont. LLC.

Major projects

S.
No. / Project / Consultant / Client / Cost RO.
1. / Construction of store room at Vocational Training Center, Seeb / Ministry of Manpower / Ministry of Manpower / 32,300.000
2. / Modification & Refurbishment to hostel block A at Higher Technical College, Muscat / National Engineering Office / Ministry of Manpower / 231,065.081
3. / Construction of proposed rehabilitation work for main hostel entrance at Higher Technical College, Muscat / National Engineering Office / Ministry of Manpower / 323,134.400
4. / Proposed modification to student canteen building at Higher Technical College, Muscat / National Engineering Office / Ministry of Manpower / 192,764.506
5. / Construction to proposed rehabilitation work for hostel block C at Higher Technical College, Muscat. / National Engineering Office / Ministry of Manpower / 335,902.460
6. / Maintenance work of the technical workshop at Vocational Training Center, Seeb / National Engineering Office / Ministry of Manpower / 141,960.000
7. / Maintenance work of the administrative building at Vocational Training Centre, Seeb (Sub-contract from M/s. Ruboa Al Maha Trading) / National Engineering Office / Ministry of Manpower / 361,760.000
8. / Supply and installation of portacabins at Nimr. / - / Halliburton Worldwide Ltd / 44,100.000
9. / Supply and installation of portacabins at Saih Rawl / - / Halliburton Worldwide Ltd / 44,100.000
10. / Rehabilitation works for pressure test bay at Fahud. / - / Halliburton Worldwide Ltd. / 56,200.000
11. / Construction of acid warehouse at Nimr / - / Halliburton Worldwide Ltd / 54,200.000
12. / Construction of acid warehouse at Mukhaizna / - / Halliburton Worldwide Ltd / 184,000.000
Al Rawdha World Center Trad. & Cont. LLC.
S.
No. / Project / Consultant / Client / Cost RO.
13. / Maintenance work for the technical workshops at Vocational Training Centre, Seeb. / National Engineering Office. / Ministry of Manpower / 1,295,210.000
14. / Construction of
13 villas
at Azaiba / Module Engineering Consultants / Al Ghadir
Al Arabia LLC / 1,420,000.000
15. / Construction of
offices and shops
at Azaiba / 3 Dimensions Engg. Consultancy / Al Azaiba
Co. LLC. / 258,000.000
16. / Construction of proposed residential villas at Azaiba / Dawood Engineering / Al Azaiba / 270,000.000
Al Rawdha World Center Trad. & Cont. LLC.

Tools/equipments/vehicles

S. No. / Description / Quantity / Unit / Remarks
1. / Rotary hammer / 4 / No. / Good
2. / Demolition hammer / 3 / No. / Good
3. / 24” rotary hammer / 4 / No. / Good
4. / 4” angle grinder / 6 / No. / Good
5. / Tile cutter / 4 / No. / Good
6. / Router / 5 / No. / Good
7. / Hilti epoxy dispenser / 3 / Set / Good
8. / Sokkia auto level transit / 4 / No. / Good
9. / Concrete mixer / 5 / No. / Good
10. / Concrete vibrator / 4 / No. / Good
11. / Plate compactor / 1 / No. / Good
12 / 230V ACD welding machine / 4 / No. / Good
13. / 3 ton Elf truck / 1 / No. / Good
14. / Mitsubishi pick-up / 5 / No. / Good
15. / Mitsubishi Pajero / 1 / No. / Good
16. / Generator / 3 / No. / Good
17. / Gas cutter / 2 / Set / Good
18. / Water tank / 3 / No. / Good
19. / Water pump / 3 / No. / Good
20. / Welding machine / 1 / No. / Good
Al Rawdha World Center Trad. & Cont. LLC.

Work/Labour force

S. No. / Description / Omani / Expatriate / Total
1. / Project Co-ordinator / 1 / 1
2. / Materials Purchaser / 1 / 1
3. / Accountant / 1 / 1
4. / P.R.O. / 1 / 1
5. / Secretary / 1 / 1
6. / Civil Engineer / 1 / 1
7. / Site Engineer / 2 / 2
8. / General Foreman / 2 / 2
9. / Electrical/Mechanical leadman / 2 / 2
10. / Electrician / 2 / 2
11. / Plumber / 5 / 5
12. / Carpenter / 2 / 3 / 5
13. / Mason / 1 / 6 / 7
14. / Steel Fixer / 1 / 2 / 3
15. / Painter / 2 / 2
16. / Welder / 1 / 1
17. / Helper / 6 / 6
18. / Driver / 3 / 3
19. / Receptionist / 1
Al Rawdha World Center Trad. & Cont. LLC.

CONSTRUCTION METHODOLOGY

PRELIMINARIES

Contract agreement

Plan and design

Shop drawings

Specifications

Site condition

Subordinate assignments and accomplish all necessary testing.

MOBILIZATION

Mobilize preconstruction requirements and during construction

Site office

Work force accommodation

Sanitation

Communication

Safety precautions

Tools and equipments

Stock room/warehouse

PRECONSTRUCTION

Laybouting, buterboard and staking

Surveying

EARTHWORKS

Site cleaning

Excavation

Demolition of rubbish if necessary

Backfilling.

Al Rawdha World Center Trad. & Cont. LLC.

CONSTRUCTION PROPER

SUBSTRUCTURES

Fabrication of steel reinforcements

Formworks and shoring, making all joints watertight

Concreting works (column footing and plinth beams)

Removal of forms

Block works

Ant-termite treatment

Compacting

Backfilling

SUPERSTRUCTURES

Fabrication of steel reinforcements

Formworks and shoring, making all joints watertight

Concreting works (column footing and plinth beams)

Removal of forms

Plastering works

ELECTRICAL WORKS

Installation of conduit pipes

Installation of wires

Installation of fittings, sockets etc.

PLUMBING WORKS

Installation of air-condition preliminaries

Installation of fire fighting requirements

Al Rawdha World Center Trad. & Cont. LLC.

FINISHING

Ceiling works

Tile works

Priming paint

Finishing paint application

Installation of light fittings

Installation of air-condition units

Installation of fire fighting fittings

Installation of sanitary fittings.

HARDWARE

Installation of doors and windows

Installation of railings, GRC panels etc.

Installation of ironmongeries

EXTERIOR FINISHING

Landscaping

Soil and area leveling, compacting

Installation of curbs and paver blocks

Storm drainage pipelines and manholes

POST CONSTRUCTION

Site clearing

Transporting rubbishes and debris off site

Snag listing inspection

Final handover

Demobilization.

Note: All works prior to execution will undergo inspection as per consultants approval