(Check List can Be Answered by your staff or a survey Engineer from Power Correction Systems, Inc.)

Feasibility Study

I) Marketing Queries

a) Your Company Name, Address, Phone Number, Email

b) Category of Entity Enqurying, Your Title

1.  Consultant

2.  Engineer (Mech., Civil, Chemical, Electrical)

3.  Institution

4.  Manufacturing Company

5.  Government (State, Federal, County, Muncipal)

b) Target Market

1.  Data Center, Banks, Insurance Companies

2.  Commercial Office Buildings

3.  Industrial (SIC Code)

4.  Educational (Country, State, Federal, University, Collage, School)

5.  Residential

6.  Military (Army, Navy, Air Force)

c) Sales Force and Shifts

1.  Number of Sales person

2.  Number of Shifts per day, Length of Each Shift and Time of Shift

d) 12 Months Utility Bills

II) Power Quality

  1. What is the load being conditioned?

a)  UPS

b)  Variable Speed Drive

# of Pulses

i.  6

ii.  12

iii.  18

iv.  24

c)  Computer with switching power supply

d)  Industrial process with rectifiers

# of Pulses

i.  6

ii.  12

iii.  18

iv.  24

e)  Lighting Ballasts

i.  Magnetic

ii.  Electronic

f)  Type of Light

i.  Flourescent

ii.  Metal halide

iii.  High pressure sodium

iv.  Low pressure sodium

v.  Mercury

  1. Is their a Line Reactor on the Power Line side of the Rectifier Circuit (3% or 5%)

a)  % Voltage Distortion of fundamental current

b)  % Current Distortion of fundamental current

  1. What is the voltage and current at the fundamental line frequencies.
  2. What is the present power factor of the load and how many KVA is the load

III) Energy Efficiency Solution

i.  12-months of utility bills

ii.  Number of shifts per day, length of shift, time of shift

iii.  List / Number of points of substation power entries, specifications of kW, kVA, secondary voltage, % impedance of sub station transformers and name of location.

iv.  List / Number of secondary transformers and name plate data specifications of kVA, kW, primary voltage, secondary voltage, % impedance, k factor rating, brand name, model number

v.  List / Number of motors, voltage and horsepower

vi.  List / Number of variable speed drives, voltage and horsepower

vii.  List / Number of computers, printers and faxes

viii.  List number of power in WATTS and which type of light i.e. as fluorescent, Metal hallide, Low pressure sodium, High pressure sodium, Mercury.

ix.  One-line diagram of the electrical system.

x.  Distance and size of cable from:

a)  Rectifier to sub panel

b)  Sub panel to sub transformer (if a local transformer exists)

c)  Sub transformer to main panel

d)  Main panel to utility transformer

b) Emergency Power/Generation – up to 35% efficient

i.  Which are critical loads

ii.  Size of critical loads, kVA, kW

iii.  Type of loads, motors, V.S. drives, welders, etc.

iv.  One-line diagram of electrical system

c) Cogeneration – up to 60% efficient

i.  Number of boilers

ii.  Type of boiler horsepower rating

iii.  Type of fuels such as diesel, natural gas, coal, etc.

iv.  Steam pressure out of boiler

v.  Steam heat exchanger

1.  Temperature of water output

2.  Volume of water output

3.  Pressure of steam output

4.  Load profile of steam

vi.  On gross aggregate basis

1.  Where is steam used?

2.  Where is hot water generated?

vii.  Load profile (15 minute or better resolution)

viii.  One-line diagram of electrical system

3 of 3