IKO Industries ltd.SBS Modified Bituminous Membrane RoofingSection 07 52 16

Master Guide Specification(Armourvent)Page 1

[Project Title]MM/DD/YYYY

To view IKO Spec. Notes click on the “pilcrow” ¶ in the MS Word Toolbar in the paragraph field. To Turn IKO Spec. Notes off click the “pilcrow” ¶ button again. Please delete this section before incorporating into a project manual

This section is intended for a partially self-adhered SBS base sheet and a heat welded SBS cap sheet. It can be applied on either metal deck or concrete. Delete items not relevant to substrate type if not applicable to Project.

  1. GENERAL

1.1GENERAL INSTRUCTIONS

.1Read and conform to:

.1The General Conditions of the Contract [CCDC 2, 2008] [CCDC ??, YEAR].

.2Section 00 73 10, Supplementary Conditions.

.2Comply with Division 1 requirements and documents referred to herein.

1.2SUMMARY

.1Section Includes: Provide SBS modified bituminous membrane roofing system including but not limited to following:

Delete items below not applicable for this project.

.1surface preparation including:

.1Removal of existing roof or portion of existing roof system.

.2Cleaning of substrate.

.2Roof sheathing (metal deck substrate only).

.3Vapour retarder.

.4Roof insulation.

.5Coverboard.

.6SBS modified bituminous base sheet.

Select 1 of the following 2 cap sheets. Use fire rated cap sheets for Class A rating requirements.

.7SBS modified bituminous cap sheet.

.8Fire rated SBS modified bituminous cap sheet.

.9Expansion joint system.

.10Roof accessories.

.11Roof walkways.

.12Integration of new roof into existing adjoining roof system.

.2Products installed but not supplied under this Section:

.1Roof drains.

.2Access hatches.

.3Related Sections: Following description of work is included for reference only and not presumed complete:

Following 5 paragraphs are related to LEED® requirements, delete if project is not to be a LEED® project.

.1Submittal forms required to be submitted by this Section: Section 00 62 00, Certificates and Other Forms.

.2Provision of general LEED® requirements: Section 01 33 29, General LEED® Requirements.

.3Provision of general LEED® Product requirements: Section 01 62 13, LEED® Product Requirements.

.4Waste management and disposal requirements: Section 01 74 19, Waste Management and Disposal.

.5Provision of indoor air quality requirements: Section 01 81 19, Indoor Air Quality Requirements.

.6[Stripping of existing roofing membrane system] [and/or] [cutting of existing roof slabs]: Section 02 41 00, Demolition and Salvage.

.7[Patching and Making Good of existing slab or roof deck] [and/or] [concrete deck finish]: Section 03 30 00, Cast-in-Place Concrete.

.8Reglets, through wall flashing and air/vapour barrier installation: Section 04 20 00, Masonry Units.

.9Provision of metal decking: Section 05 31 00, Steel Deck.

.10Supply of wood cant strips and other blocking: Section 06 10 00, Rough Carpentry.

.11Supply of prepainted flashing: [Section 07 46 19, Metal Siding System] [Section
07 62 00, Sheet Metal Flashing and Trim] [Insert cladding system providing prepainted flashing].

.12Provision of roof hatches and accessories: Section 07 72 00, Roof Accessories.

.13Sealants other then those required for roof system: Section 07 92 00, Joint Sealants.

1.3REFERENCES

.1Abbreviations and Acronyms:

.1AWPA: American Wood Protection Association;

.2CCA: Chromated copper arsenate (preservative)

.3CRCA: Canadian Roofing Contractors’ Association;

.4EVT: Equiviscous Temperature.

.5FBT: Finish Blowing Temperature.

.6FM: Factory Mutual Global;

.7FP: Flash Point.

.8Following 2 paragraphs are related to LEED requirements. Delete if not required.

.9FSC: Forest Stewardship Council;

.10LEED: Leadership in Energy and Environmental Design;

.11LTTR: Long Term Thermal Resistance.

.12MSDS: Material Safety Data Sheets.

.13OIRCA: Ontario Industrial Roofing Contractors Association;

.14SBS: Styrene-Butadiene-Styrene.

.15SMACNA: Sheet Metal and Air Conditioning Contractors’ National Association;

.16ULC: Underwriters Laboratories of Canada;

Following paragraph is related to LEED requirements. Delete if not required.

.17VOC: Volatile Organic Compound.

.2Definitions:

.1Roofing Terminology: Refer to ASTM D1079 and glossary as dictated by CRCA Manual.

.2Phased Construction: Layered installation in which each component of cross section of roof system are not completed in a specific roof area during a 1 day work period. This type of construction is NOT acceptable to roof system manufacturer.

.3Reference Standards:

.1ASTM C208-08a- Standard Specification for Cellulose Fibre Insulating CAN/ULC-S706Board

.2ASTM C1177/C1177M-08- Standard Specification for Glass Mat Gypsum Substratefor Use as Sheathing

.3ASTM D92-05a- Standard Test Method for Flash and Fire Points by
Cleveland Open Cup.

.4ASTM D1079-08a - Standard Terminology Relating to Roofing and
Waterproofing

.5ASTM D3273-00(05)- Standard Test Method for Resistance to Growth of Mold on the Surface of Interior Coatings in an EnvironmentalChamber

.6ASTM E84-08a- Standard Test Method for Surface Burning
Characteristics of Building Materials

.7ASTM E136-04- Standard Test Method for Behavior of Materials in a Vertical Tube Furnace at 750°C

.8AWPA P5-07- Standard for Waterborne Preservatives

.9CGSB 37-GP-9Ma- Primer, Asphalt, Unfilled, for Asphalt Roofing,
Dampproofing and Waterproofing

.10CGSB 37-GP-56M- Membrane, Modified, Bituminous, Prefabricated, and Reinforced for Roofing

.11CAN/CGSB-51.33-M89- Vapour Barrier Sheet, Excluding Polyethylene, for Use in Building Construction

.12CSA A123.4-04(08)- Asphalt for Constructing Built-Up Roof Coverings and Waterproofing Systems

.13CSA A231.2-95- Precast Concrete Pavers

.14CSA O80.1-M08- Specification of Treated Wood

.15FM 4470-86- Approval Standard for Class 1 Roof Covers

.16CAN/ULC-S102-07- Surface Burning Characteristics of Building Materials and Assemblies

.17CAN/ULC-S107-03- Methods of Fire Tests of Roof Coverings

.18CAN/ULC-S114-05- Standard Method of Test for Determination of Non- Combustibility in Building Materials

.19CAN/ULC-S126-06- Standard Method of Test for Fire Spread Under Roof- Deck Assemblies

.20CAN/ULC-S704-03- Standard for Thermal Insulation, Polyurethane and Polyisocyanurate Boards, Faced

.21CAN/ULC-S770-00 - Determination of Long-Term Thermal Resistance of Closed-Cell Thermal Insulating Foams

.22UL 1256- Standard for Fire Test of Roof Deck Construction

1.4ADMINISTRATIVE REQUIREMENTS

.1Coordination:

.1Prior to start-up and during work, review conditions of space below to ensure conflicts and/or altercations are kept to a minimum.

.2Work deemed disruptive to overall Project shall be cleared by Contractor and Owner in advance.

.2Preinstallation Meetings:

.1Arrange preinstallation meeting 1 week prior to commencing work with parties associated with trade as designated in Contract Documents or as requested by Consultant. Presided over by Contractor, include Consultant who may attend, Subcontractor performing work of this trade, Owner’s representative, manufacturer’s representative, testing company's representative and consultants of applicable discipline. Contact Consultant and involved parties minimum 2 weeks prior to preinstallation meeting to confirm details of meeting.

.2Record discussions of conference, decisions, agreements or conflicts reached and furnish a copy to involved parties. Review preparations and installation procedures and coordinate scheduling required for work of this Section.

.3Review methods and procedures related to roofing including following:

.1Tour, inspect and discuss conditions and coordination of substrate, roof drains, locations of roof drains, curbs, penetrations and other work performed by trades impacting this Section.

.2Examine deck substrate conditions and finishes for compliance. Review structural loading limits of deck and inspect deck for loss of flatness and for required mechanical fastening.

.3Review methods and procedures related to roofing installation, including manufacturer’s written instructions.

.4Review roofing system requirements (Drawings, Specifications and other documents).

.5Review required submittals.

.6Review and finalize construction schedules related to roofing work and verify availability of materials, installer’s personnel, equipment and facilities needed to make progress and avoid delays.

.7Review required inspections, testing, certifying and material usage accounting procedures.

.8Review weather and forecasted weather conditions, and procedures for coping with unfavorable conditions, including possibility of temporary roofing.

.9Review structural loading limitations of roof deck for stocking roofing materials.

.10Review flashing details, roof drainage and other conditions that will affect roofing systems.

.11Review fire hazard assessment of work prior to commencement of heat welding application.

.12Review temporary protection requirements for roofing system during and after installation.

.13Review roof observation and repair procedures after roofing installation.

.3Scheduling:

.1Co-operate with adjoining subtrades and promptly proceed with work as soon as site conditions permit.

.2Ensure items to be incorporated into work of this Section and items required for incorporation by other subtrades are supplied in a timely manner. Proceed with work of this Section after built-in items are installed and roof substrates are completed.

1.5SUBMITTALS

.1Provide 2 copies of each submittal unless otherwise noted in Specifications.

.2Product Data: Submit Product data on components of roof system including but not limited to:

.1Each product to be used, composition of material, and method of installation.

.2MSDS.

.3Certification of compliance with applicable standards and authorities having jurisdiction.

.4Warranty.

.3Shop Drawings: Submit Shop Drawings as required showing method of installation and layout of each layer, roof edge condition details, roof penetration flashing details, control and expansion joint details, standard roof sections, connection to air barrier in wall, details of insulation, tapered insulation layouts, vapour retarder [and sheathing securement details] and other details required for proper roof system installation not specified in, or are different from Specifications and Drawings.

.4Samples: Provide following samples of manufacturer’s roofing system components prior to commencement of work in this Section:

.1Insulation 300 mm x 300 mm (12” x 12”) square.

.2Roof membrane 300 mm x 300 mm (12” x 12”) square.

.3Metal flashing material 300 mm x 300 mm (12”) long.

.4Roof pavers 150 mm x 150 mm (6" x 6") square.

.5Test and Evaluation Reports:

.1If requested, provide Product test reports based on evaluation of comprehensive test performed by manufacturer and witnessed by a qualified independent testing agency for components for roofing system.

.2Indicate components of roofing system comply with requirements of manufacturer and these Specifications including quantity, statistical and descriptive data for each Product and other data pertaining to date, time and temperature for each load of bulk asphalt.

.6Manufacturer’s Instructions: Submit manufacturer’s installation instructions prior to installation of roofing system for use during installation.

.7Qualification Statements:

.1Provide a certificate or letter of authorization issued by roofing system manufacturer stating Contractor is registered, approved, authorized or licensed by roof system manufacturer to apply their Products and furnish manufacturer’s warranties if required.

.2Ensure Contractor is a member in good standing of CRCA.

1.6CLOSEOUT SUBMITTALS

.1Operation and Maintenance Data: Supply necessary maintenance data and repair instructions for binding into maintenance manuals. Data includes: Project name, location, dated and executed copy of manufacturer’s warranty, described herein and name address and phone number of nearest manufacturer’s representative. Include recommendations for periodic inspections, care and maintenance. Identify common causes of damage with instructions for temporary patching until permanent repair can be made.

.2LEED® Submittals:

Use following for Sections requiring LEED® Credit MR 5.1 and MR 5.2.

.1Materials & Resources LEED® Credits MR 5: Regional Materials: Provide Product data indicating location of material manufacturer for regionally manufactured materials. Ensure Contractor and/or Subcontractors provide following completed forms appended to Section 00 62 00 in accordance with Section 01 62 13:

.1Submit Recycled and Regional Content Form.

Use following for Sections requiring LEED® Credit MR 7.

.2Materials & Resources LEED® Credit MR 7: Certified Wood: Provide signed of chain-of-custody certificates from applicable parties, including but not limited to timber mills, manufacturers and distributors certifying materials and Products specified are made from certified wood obtained from forests certified by a FSC accredited certification body. Ensure Contractor and/or Subcontractors provide following completed forms appended to Section 00 62 00 in accordance with Section 01 62 13:

.1Submit FSC Certified Wood Content Form.

.2Submit Rapidly Renewable Content Form.

Use following for Sections requiring LEED® Credit EQ 4.1.

.3Indoor Environmental Quality LEED® Credit EQ 4.1: Low-Emitting Materials: Adhesives & Sealants: Provide manufacturers’ Product data for adhesives and sealants, including printed statement of VOC content and MSDS comply with SCAQMD Rule #1168. Ensure Contractor and/or Subcontractors provide following completed forms appended to Sectionn 00 62 00 in accordance with Section 01 81 19:

.1Submit Product VOC Identification Form.

Use following for Sections requiring LEED® Credit EQ 4.4.

.4Indoor Environmental Quality LEED® Credit EQ 4.4: Low-Emitting Materials: Composite Wood and Laminate Adhesives: Provide manufacturers’ Product data for wood composite and laminate adhesives, including printed statement of VOC content and MSDS stating materials and Products do not contain urea-formaldehyde. Ensure Contractor and/or Subcontractors provide following completed forms appended to Section 00 62 00 in accordance with Section 01 81 19:

.1Submit No-Added Urea-Formaldehyde Form.

1.7QUALITY ASSURANCE

.1Qualifications:

.1Manufacturers: Company to be recognized by membrane manufacturer as being qualified to install their roofing systems.

.2Installers:

.1Provide work of this Section executed by competent installers with minimum 10 years’ experience in application of Products, systems and assemblies specified and with approval and training of Product manufacturers.

.2Project Foreman:

.1Provide a competent project foreman with minimum 5 years’ experience in supervision of roofing system installation, knowledgeable in roofing type specified herein. Ensure foreman is present at job site during majority of work hours and is accessible to ensure good project coordination.

.2Do not alter foreman or crew without prior approval of Consultant.

.3Foreman to monitor weather conditions and take steps to ensure appropriate measures are implemented due to inclement conditions and to protect materials equipment and work to date.

.2Conform to CRCA’s “Roofing Specifications - 1997” manual as amended to date of this Specification, as applicable, except where indicated or specified otherwise. Do roofing work employing roofing Products, [roof sheathing,] plates and fasteners conforming to FM data for proposed roofing system. More stringent requirements by Consultant governs.

.3Mock-Ups: Construct for review, minimum 10 m2 (100 sq ft) mock-up sample at Project location designated by Consultant. Once accepted, mock-up remains part of finished work and used as a quality reference standard for balance of Project.

1.8DELIVERY, STORAGE AND HANDLING

.1Delivery and Acceptance Requirements:

.1Deliver materials in manufacturer’s original, unopened containers with manufacturer’s labels intact and legible.

.2Carefully unload in a manner to prevent damage.

.2Storage and Handling Requirements:

.1Refer to Product MSDS for precautionary measures during storage and handling.

.2Keep pail goods and membrane materials dry, stored in rolls standing on end, selvage edge up, elevated from contact with moisture, at temperatures not less than 4°C (40°F) or more than 49°C (120°F) and pre-conditioned before installation. Handle rolls with care to avoid crushing, puncturing or other damage. Ensure selvage edge is not damaged during handling and banding strips are removed before application of membrane. Do not use wet or damp membrane or flattened rolls.

.3Protect materials from damage by elements, weather and other activities on raised platforms and covered with breathable tarpaulins.

.4Ensure pail-goods have tight fitting lids when not in use. Store on end in up-right position.

.5Ensure materials stored on roof stay within designated live load limits of roof construction. Provide ample bases under equipment and materials to distribute weight to conform to these live load limits. Do not store materials on, or transport materials across, completed roof areas.

.6Do not expose insulation [and roof sheathing] to wet weather. Store and handle insulation to prevent broken edges and corners, punctures, indentations or other damage. Remove damaged insulation from site.

.7Ensure bitumen delivered in form of cartons has manufacturer's material identification labels intact on each carton; if in form of bulk tanker delivery, each shipment to be accompanied by written certificate from manufacturer confirming material identification including following:

.1Softening Point as per CSA A123.4.

.2Minimum FP per ASTM D92.

.3EVT.

.4FBT.

.8Do not intermix different types or grades of bitumen in bulk shipments.

.9Protect sheet metal materials from bending and scratching.

.10Store adhesive, emulsion based waterproofing mastics, sealants and primers between 15°C and 26°C (59°F and 79°F), or restore to temperature ranges before use.

.11Store materials at site within temporary sheds or trailers; such facilities must be well sealed and kept at least 3°C (5°F) warmer than exterior ambient temperature to ensure materials remain dry in terms of roofing. Do not use wet, damp, frozen or damaged materials. Stack rolls of felt on end.

.12Do not store more than 1 day's supply of materials on roof at any time. On roof, stack materials on pallets and completely cover with incombustible waterproof tarpaulin whenever work is interrupted, or when there is precipitation of any kind. Securely tie covering to pallets in such way as to be weather tight. Plastic covers and shrink-wrap covers by manufacturers are not acceptable for site storage and be removed upon delivery to roof.

.13Store combustible materials away from heat and open flames. Protect and store materials in dry, ventilated area away from welding flame, spark and from elements or harmful substance.

.14Do not lift rigid insulation in slings which will damage edges. Remove damaged insulation and replace with new material at no cost to Owner.

1.9SITE CONDITIONS

.1Ambient Conditions: Do not apply roof system during inclement weather or when ambient temperatures are expected to be below 5°C (40°F). For temperatures below this practice cold weather application techniques as recommended by membrane manufacturer.

Use following article for repairs, additions or installation of new mechanical equipment on existing roof. Delete if not applicable.

.2Existing Conditions:

.1Modifications are to take place on existing adjacent roof areas as part of work of this Section. Do no use existing roof areas as storage, except to extent required for removal, alteration and replacement of work.

.2Existing roofing is covered by roofing warranty. Obtain from Consultant necessary information regarding such warranty and notify manufacturer of existing roof by letter before work is commenced on existing roof.

.3Execute alteration work in manner to maintain existing warranty.

.4Provide temporary protection of existing roof while existing construction is open.

1.10WARRANTY

.1IKO Limited Labour and Membrane Warranty:

.1Warrant work of this Section for a period of 5 years against roof leaks as a result of material defects in accordance with General Conditions of the Contract. Promptly correct any defects or deficiencies which become apparent within warranty period, to satisfaction of Consultant and at no expense to Owner. Defects include but are not limited to; leaking, buckling, opening of seams, bond failure and extensive colour fading.

.2In addition to above, provide to Owner a written warranty covering defects of workmanship for a period of 2 years commencing from date of Substantial Performance of the Work and agree to Make Good promptly any defects which occur or become apparent within warranty period in conjunction with membrane manufacturer’s warranty. Ensure warranty is on either CRCA’s or OIRCA’s “Standard Form of Warranty.

  1. PRODUCTS

2.1MANUFACTURERS

.1Manufacturer List: Products of following manufacturers are acceptable subject to conformance to requirements of Drawings, Schedules and Specifications: