MEEITAX FORM 1
(Investment Tax Credit)
Instructions
- NAME OF FORM:
Annual ReportonPlanned Activities for the CalendarYear
- PURPOSE:
-To determine status of the field, whether mature or enhanced oil recovery (EOR) project for the purpose of the Investment Tax Credit
-To advise the MEEI of planned activities for the year
- LICENCE/SUB-LICENCE/CONTRACT:
Tick as appropriate and place licence number or blockname for a Production Sharing Contract.
(Prepare separate submissions for each licence/sub-licence or contract).
- OPERATOR:
State the name of the company operating the oil field.
- OTHER PARTIES:
State the name/s of the joint partners and the percentage ownership.
(No separate application is required from joint partners)
- MARINE/LAND:
Check appropriate box, marine or land and report information appropriately. (Prepare separate submission for marine or land)
- FIELD NAME:
State the name of the field being reported for the proposed activity.
(Only include fields on which work is proposed to be carried out during the year)
- DATE OF FIRST COMMERCIAL PRODUCTION:
Date of first commercial disposal of crude oilfrom this field (regardless of ownership of licence or contract at that date).
- WELL NAME:
Well name format for wells already drilled:field code–platform code-number.
The well name nomenclature is generated using the following rule:
Field Code / Dash / Platform Code / Dash / MEEI’s Well Number(Prefix + Number + Hole Types)
A / N / G / - / C / E / B / - / A / N / 1 / 1 / S / T / 1
- COMPLETED HORIZON:
State the horizon, sand or reservoir in which the well is completed.
- NRT- NEW HORIZON:
State the horizon, sand or reservoir in which the well will be completed.
- DEVELOPMENT DRILLINGLOCATION:
The location co-ordinates north and east of the base point.
- PROJECTION TYPE:
Type of coordinates e.g. Trinidad Cassini in links, UTM 21 WGS84 feet
- PRIMARY OBJECTIVE:
Objectives of the well in terms of horizon, sand, reservoir etc
- EOR PROJECT:
The name and/ornumber of the oil reservoir with which this project is concerned.
- OTHERFIELD DEVELOPMENT ACTIVITY:
Any other projects concerned with field development activitye.g. pipe line infrastructure.(Attach schedule of expenditure with details of activity)
- ESTIMATED COST:
The proposed total cost for each activity/project in $US.
(For joint venture operationsshow total cost of the activity)
- ESTIMATED PRODUCTION GAIN:
The additional production expected from this activity (bbls.)
- TIMING OF WORK:
The quarter in the year in which each proposed activity willtake place.
- DECLARATION:
- NAME:The name of the duly authorized officer of the company who verifies thereport as being true and correct.
- SIGNATURE:The signature of the duly authorized officer of the company whose name isshown in block letters.
- TITLE:The job or position of the duly authorized officer of the company who
signed the form.
- DATE:MM/DD/YYYY
Submit documents to:
The Permanent Secretary,
Ministry of Energy and Energy Industries,
Level 26, Tower C - Energy Trinidad and Tobago,
International Waterfront Centre,
1A Wrightson Road,
Port of Spain.
1