Nagesh R Ghugardare
CURRICULUM VITAE
1) Personal Details: -
Name: Mr.Nagesh Raghunath Ghugardare, Nationality: Indian, Date of birth: April 18, 1956
Point of Mobilization: Mumbai-India, Status: Married Driving license: Internationally valid
Passport Number & Validity: Z-1587704 Valid till March 15, 2014
Health: I possess a sound health and good physique.
Mobile: +91-9769081645/+91-9892192723 Email: ;
Present Employment & Availability: Presently I am working in Mumbai-India as Consulting Electrical Engineer and Available Immediately.
2) Education, Membership & Courses:-
i) Bachelor of Science in Engineering -Electrical (BSEE) from Newport University California USA in 1998 with Grade “B”, having attestation from Secretary of State Washington DC USA.
ii) Bachelor of Technology-Electrical from VMRF University India; iii) Diploma in Electrical Engineering in 1977.
Member of the Institution of Engineering and Technology UK & Membership No.: 77334705
2.1) Computer & Software Literacy: - MS Word, Excel, SKM, ETAP, Power Plot. Familiar with PSCAD/EMTDC Software.
2.2) BOISET and HUET Training and Certificate (First Aid, Fire Fighting and Sea survival and Helicopter Under-Water Egress Training and Certification)
3)Nature of Experience: I had worked for ExxonMobil, BG-Group, ARMCO, CHEVRON-TCO, SABIC, GMRA, DuPont, ONGC, CAIRN ENERGY, PKKR, Worley Parsons, Brown & Root, Siir Tech Nigi, Mitsubishi, Toyo, SAFCO, Black & Veatch, Saudi Electricity Company-SEC, Dar Al-Riyadh, Chemtex, M.N.Dastur, Crompton Greaves & Petro-Chemicals, and Allied Industries as Lead Electrical Engineer, Consulting Electrical Engineer, Head of Electrical (HoD) & Project Manager for more than 25 years in India, USA, S. Korea, Saudi Arab, Libya, Kazakhstan, Qatar and Tunisia.
4) Technical Capabilities and Projects Handled: FEED, Detailed Engineering, EPC/EPCIM/PMT/PMC Project Engineering Management, Construction, Inspection, Testing and Commissioning of Power Generation, Transmission and Distribution Systems for various On shore and Off shore Up-Stream and Down Stream Oil, Gas and LNG Projects, Refineries, Petro-Chemicals, Sub-Sea Projects, Water and Allied Projects, 600MW Power Generation, 400KV/380KV/220KV /132KV /110KV/ 66KV/ 33KV/11KV HV Transmission lines, Switchyards, 400KV/220KV 315MVA Transformers and GIS/AIS Substations, Gas Insulated Switchgears, OPGW, 220KV/110KV/66KV EHV-Cables, EHV/HV Transmission Distribution, GIS/AIS Substations, Switchyards, Protection & Control, Instrument Systems. Familiar with PUE-RoK, GOST, API,ANSI/IEEE, IEC, CENELEC, NORSOK,BS, ARAMCO, Institute of Petroleum for Hazardous area and ISO Standards.
a) Power Generation, EHV/HV Transmission Distribution, Power system study, Power Quality, Protection and Control,Power Management systems,ELICS,SCADA for ExxonMobil, BG-Tunisia, Tabarjal Power plant and Saudi Electric Company, GMRA Project at Libya and Polyester Project of Indo-Rama Synthetics India and Hindustan Zinc Project in India and other Various Projects in India.
o Selection of type of Power Generation Plant/System. Power System studies with ETAP/SKM Software like
Ø Load Flow, Short Circuit, Earth fault, Motor starting, Voltage drop, Harmonics and Transient stability, Cable selection, Protection and Control, Relay setting and Co-ordination, Numerical Relays. Practical Power Quality solutions.
Ø 600MW Power Generation with Steam and Gas Turbine (up to GE Frame 9) Mitsubishi/GE/SOLAR Turbines and Generators for Qatar Gas-II, Saudi Electricity company 200/150 MW Combined Cycle Power Plant (CCPP)- Tabarjal Power Plant, Grid Paralleling, Auto /Manual Synchronization of Generators, Load shedding & sharing, Protection, Control & Metering Systems. Diesel and Hydro-Electric power generation.
o Sub-Sea Wind Power Generation, Sub-Sea Cables
o 400KV/380KV/230KV/132KV/110KV/66KV/33KV/11KV Transmission lines, EHV Single Core screened Cables Power and Distribution Transformers up to 315MVA, LA’s,CTs/PTs, Gas Insulated Switchgear /Air Insulated Switchgear Substations Mechanical and Electrical design review and Construction,, Gas Insulated Switchgears, OPGW, 220KV/110KV/66KV EHV-Cables, for Saudi Electric Company and Great Man Made River Project in Libya and various Projects in India.
o Power Management Systems (PMS), ELICS,SCADA,DCS, Liaison with Electric supplies authorities
Selection, design Installation of Fiber Optics and Fiber Optics Cables and Optical Fiber Ground Wire-OPGW.
b) Project Engineering Management, planning and schedule monitoring:- Project Management, Monitoring /Reviewing Project Schedule and Man-hours,Inter-discipline Co-ordination, Supervising, Controlling of Senior Technical Officers, Engineers, Designers. Quality, Man-hour estimates.QA/QC.HSSE
c) EPC/EPCIM/PMT/PMC Project Engineering Management-For ExxonMobil-Qatar Gas-II LNG Project; BG-Tunisia Natural Gas Project and Brown & Root-For Great Man-Made River Project
o Preparation of Tender Packages/ITT documentation and bid technical review forElectrical and Instrumentation.
o Review Material quantities take off with the Client/Consultant bill of quantities. Sorting out if conflict or missing items. Preparation of Bill of quantities from shop drawings and site. Preparing the Bill of Quantities.
o Supervision, Review and Approve detailed design and Engineering Construction/Installation work carried out by EPC Contractor/ Vendor and ensure that EPC contractor/Vendor are performing the work as per the client’s requirements and applicable codes and standards that meets project objectives, industry standards and best practice for safety, reliability and cost. Preparing estimates, providing input to strategic plans and budgets, Liaison with statutory authorities. HSSEandQuality. Technical support in Concession Request
o Managing site design changes and interface engineering of different Contractor's designed packages. Approve the site design changes originated for construction/installation reasons. Ensure that all Technical Queries and Site Queries are properly and timely resolved. Project Change Notice and Claims Cost Estimates.
o Witnessing and Approving FATs/SATs/Pre-commissioning tests to establish the acceptability of the plants.
o Construction, Inspection, Testing and Commissioning of EHV/HV/LV Equipments and Installations.
d) Engineering:-
o Providing technically and financially optimal solutions. Developing standards, procedures and monitoring electrical and HSE codes and code compliance within Projects.
o Preparation of EHV/HV/LV Electrical design documents, Drawings, Specifications and Datasheets. Single line diagrams–Metering and Protection diagrams, Motor starter schemes, Earthing, Lighting and Lightning design, Cables, cable tray and earthing layouts. Review/Approve Vendor documents for construction. MTO, Cable and conduit Schedule, Switchyards and Substation, Electrical and Navigational layouts
o DC Power supply design,UPS design & power distribution. Solar power systems.
o CCTV,PA and Communication Systems
o Cathodic Protection of FPSO Hull Coatings and CP Systems, Marine Structures,Pipe lines,Tanks, Vessels and structures
o Heat Tracing system, Freezing Protection, Space heating,
o Preparation of Hazardous Area Classification Drawings & Selection, Installation of Electrical Equipment's including for H2S –Hydrogen Sulphide facilities
o HV/LV Variable Speed Drives, Power Motor Control Centers, Power Factor Correction & Equipments.
o Risk Assessments, Execute and monitor the Operation and Maintenance activities of the electrical installations.
o Navigational Aids
o Well Head stations and Control panels, Submersible pumps
o Process Control Instruments, Instrument Piping, Cabling, DCS/PLC/SCADA Interface, F &G and ESD System. SIL Analysis, process Trip Alarms systems.
e) Projects Handled:
o On shore Oil & Gas, LNG Projects, Refineries, Petro-Chemicals, Projects For Cairn Energy, Saudi Aramco’s, Black and Veatch,Siir Tech Nigi’s, ExxonMobil Qatar Gas-II LNG Project, BG-Tunisia Hasdrubal and Hannibal On-Shore Natural Gas Projects, Mitsubishi’s Saudi Methanol Petro-chemicals, Reliance MEG-Project, Ras Tanura and OMAN Refineries, SAFCO Fertiliser Project and GMRA-Water Projects, DuPont’s Polyester Projects,TCO-Kazakhstan’s Gas Utilisation Project and Sulphur recovery Projects of TCO,Black and Veatch, Siir Tech Nigi, Sales Gas Export Compressor Project at Tengiz Kazakhstan having 7.5MW,10KV Synchronous Motor and Variable Frequency drive (LCI) for Gas Compressor
o Offshore Oil & Gas Projects 1)BG-Tunisia-MISKAR-Off-Shore Gas Field Power Up-gradation and Feasibility Project 2) Abquiaq, Al-Quatif Plant Duba marine Terminals for Saudi ARMCO FPSO Gas Turbine Power Generation and distribution, Auto/ Manual Synchronization, Excitation Systems, for and Electrical Submersible Pumps (ESP) Package. 3) LNG Terminal for LNG Project in Azerbaijan 4) ONGC India -PANNA Off-Shore platform modification project.5) Sub-Sea Engineering Like Power Cables, Wind Power Generation
o FEED Projects: Sulphur Recovery and GUP-Gas Utilization Project for TCO-Kazakhstan, MISKAR-Off-
Shore Gas Turbine Power Generation Feasibility study, DuPont’s Polyester Project for Cheil Synthetics
o DuPont’s Polyester Projects: Design, detailed Engineering, Inspection, Construction of DuPont’s Polyester
o Projects at India, USA, S.Korea and Turkey
o Power Generation, Transmission and Distribution Projects
f) International Assignments: -
i) In U.S.A with M/S E.I. DuPont for Polyester Project Engineering Services.
ii) In South Korea with M/S Tong kook, Kumkang & Cheil Synthetics for Polyester project
iii) From Feb.2005, till Jan.2006, I was working as a Project Manager & Head of Department- Electrical with M/S.Dar Al- Riyadh Consultants Al-KHOABAR SAUDI ARABIA.
iv) From Feb.2006 till July 2006, I was working as a Senior Electrical Engineer with Brown & Root North
Africa Limited at Tripoli Libya
v) From Sept.2007 till Jan.08 with Worley Parsons Kazakhstan LLC and worked for TCO, PKKR and Projects in Atyrau-Kazakhstan as a Principal Electrical Engineer
vi) From Jan.2008 till March 2008 with ExxonMobil-Qatar Gas-II as a Electrical Engineer at QATAR.
vii) From Sept 2008 T0 April 2009 with BG-Tunisia as Consulting Electrical Engineer for MISKAR Off-Shore Gas Field and Hasdrubal, Hannibal On-Shore Gas Field Project.
5) Employment History:-
5.1) April 2009 To till date
Presently I am working as a Consulting Electrical Engineer for FEED, Engineering. Construction Supervision of Power Generation, Transmission and Distribution Projects, Variable Frequency drives and Oil, Gas and Petro-Chemicals Industries. Selection of type of Power Generation Plant/System,Liaison with Electricity Authorities and Inspectors. Techno-Economic Feasibility study.
5.2) Sept.2008-April 2009.
COMPANY : BG-Tunisia (Division of BG Group PLC-UK).
PROJECT : MISKAR Off-Shore Gas Field and Hasdurbal and Hannibal On-Shore Natural Gas project.
POSITION : Consultant Electrical Engineer
CLIENT : Worked for Client BG-Tunisia (BG-Tunisia) MISKAR Off-Shore Gas Field; Hasdrubal and Hannibal On-Shore Gas Field Project
RESPONSIBILITIES: Project Engineering Management Preparation of ITT documentation and bid technical review forElectrical and Instrumentation for Off-shore and On-Shore Oil and Gas Projects.
· Preparing Proposals, Tender /Bid packages and Evaluation; awarding a contract.
· Review, Approve Inspect and Ensure that the Design, Detailed Engineering, Inspection, Construction and Pre-Commissioning carried out by Engineering Consultants and Construction companies for MISKAR Off-Shore Gas Field and Hasdrubal and Hannibal On-Shore Gas Field Project As per client’s requirements and applicable codes and standards that meets project objectives, industry standards and best practice for safety, reliability and cost.
· Selection of type of Power Generation Plant.Sub-Sea Wind Power Generation
· Techno-Economic feasibility study and Power system System Up-grade study for Off-Shore Gas field platform 10MW Gas Turbine Generator Project. Power Generation, Distribution and HV/LV Variable Frequency drives. Power distribution study.
· Review Material quantities take off with the Client/Consultant bill of quantities. Sorting out if conflict or missing items. Send Bill of quantities to be revised by Technical office. Preparation of Bill of quantities from shop drawings and site. Assist in preparing the Bill of Quantities. Issue order to pay to the Subcontractor and the supplier
· Process control Instrumentation, Power Management Systems/DCS/SCADA, F &G and ESD, SIL Analysis, process Trip Alarms systems.
· Risk Assessments, Execute and monitor the maintenance activities of the electrical installations, Spares
· Managing site design changes and interface engineering of different Contractor's designed packages. Approve the site design changes originated for construction/installation reasons. Ensure that all Technical Queries and Site Queries are properly and timely resolved. Technical support in Concession Request, Project Change Notice and Claims. HSSE and Quality.
· Cathodic Protection of Marine structures and Sub-Sea pipelines.
· Navigational Aids-Engineering, Layout, Battery’s, Galvanic Isolation of power supply boards and panels.
5.3) March 2008 – 25th Sept.2008.
COMPANY : Employed as a Consulting Electrical Engineer
PROJECT : HV Variable Speed drives, Oil, Gas and Power
POSITION : Consulting Electrical Engineer
CLIENT : Toshiba Mitsubishi, Engineering consultancy companies
RESPONSIBILITIES : Design, Engineering, Inspection, Construction Supervision of Oil, Gas and Power Generation, Transmission and Distribution Projects and HV/LV Variable Frequency drives. Power Generation plant Selection like type, Techno-Economic and feasibility study. Preparing Proposals, Tender /Bid packages and Evaluation; Awarding a contract.
5.4) Jan. 2008 to March 2008
COMPANY: Exxon Mobil
PROJECT : 7.8mta Qatar Gas-II LNG Project Train 4 and 5.
POSITION : Consulting Electrical Engineer
CLIENT : Worked for Client ExxonMobil and Qatar Gas-II-PMT/PMC
RESPONSIBILITIES: Review and Approve the Design, Detailed Engineering, and Inspection, Construction by CTJV-CHIYODA Japan and TECHNIP France Joint Venture and Project Management. Project provides a Two gas liquefaction trains each capable of processing in excess of 7.8mtpa of natural gas for export by LNG tanker.
· 600MW Electrical power generation system consisting 3 # Mitsubishi Steam Turbine Generators (STG) rated 11KV, 44 MW each STGs. 1 set of GE Frame-6 Gas Turbine Generator (GTG) rated 11KV, 33 MW at 43ºC temp. 6 # 125MW Frame-9 Gas Turbine Generators for operating Propane, Nitrogen and Mixed Refrigerant Compressors, Auto Synchronizing and Paralleling, Load Shedding and sharing, Black start Diesel Power Plants.
· Preparing Proposals, Tender /Bid packages and Evaluation; Awarding a contract.
· 132/33KV 100MVA Switchyard and Substation-Grid Paralleling with STG/TG
· Electrical Integrated Control System (ELICS) and Power Management System (PMS),
· Protection and Control, Relay setting and Co-ordination study, EHV/HV Transmission lines and Cable Sizing, DC Power supply design, UPS design & power distribution, Lighting, CCTV and Lightning.
· Cathodic Protection for Pipe Lines, Tanks - above and under ground, Marine structures, Vessel and Tank Internals, Plant facilities, Reinforced concrete structures and well casings.
· Review Material quantities take off with the Client/Consultant bill of quantities. Sorting out if conflict or missing items. Send Bill of quantities to be revised by Technical office. Preparation of Bill of quantities from shop drawings and site. Assist in preparing the Bill of Quantities. Issue order to pay to the Subcontractor and the supplier
· Technical support in Concession Request, Project scope changes and Claims.
5.5) Sept 2007- January 2008
COMPANY : Worley Parsons Kazakhstan LLC
PROJECT : FEED Sulphur Expansion Project-SEP, Gas Utilization Project-GUP and UNIT-600 Sulphur
Pad Project, Sales Gas Export compressor Project for TCO. PKKR-Expansion Project
POSITION : Principal Electrical Engineer/ Lead Electrical Engineer
CLIENT : TengizChevoroil (TCO),PKKR
RESPONSIBILITIES: As a Principal Electrical Engineer/ Lead Electrical Engineer directly interacting with Client –TCO, PKKR, Leading a Team of Engineers and Responsible for FEED and Design, Engineering of
· Sales Gas Export Compressor Project at Tengiz Kazakhstan having 7.5MW, 10KV Synchronous Motor and Variable Frequency drive,