Objectives and outcomes for river operations in the River Murray System

PublishedbytheMurray‒DarlingBasinAuthority

PostalAddress:GPOBox1801,CanberraACT2601

Telephone:(02)62790100international+61262790100

Facsimile:(02)62488053international+61262488053

Email:

Internet:

MDBApublicationno.:06/16

ISBN(online):978-1-925221-61-9

AllmaterialandworkproducedbytheMurray‒DarlingBasinAuthorityconstitutesCommonwealthcopyright.MDBAreservestherighttosetoutthetermsandconditions for the use of such material.

WiththeexceptionoftheCommonwealthCoatofArms,photographs,theMurray‒DarlingBasinAuthoritylogoorotherlogosandemblems,anymaterialprotectedbyatrademark,anycontentprovidedbythirdparties,andwhereotherwisenoted,allmaterialpresentedinthispublicationisprovidedunderaCreativeCommonsAttribution3.0Australialicence.

©Murray‒DarlingBasinAuthority2016.

TheMurray‒DarlingBasinAuthority’spreferenceisthatyouattributethispublication(andanyMurray‒DarlingBasinAuthoritymaterialsourcedfromit)usingthefollowingwordingwithinyourwork:

Title:ObjectivesandoutcomesforRiverOperationsintheRiverMurraySystem.

Source:LicensedfromtheMurray‒DarlingBasinAuthorityunderaCreativeCommonsAttribution3.0AustraliaLicence

Asfaraspracticable,materialforwhichthecopyrightisownedbyathirdpartywillbeclearlylabelled.TheMurray‒DarlingBasinAuthorityhasmadeallreasonableeffortstoensurethatthismaterialhasbeenreproducedinthispublicationwiththefullconsentofthecopyrightowners.

InquiriesregardingthelicenceandanyuseofthispublicationarewelcomebycontactingtheMurrayDarlingBasinAuthority.

Coverimage:YarrawongaWeirontheRiverMurray(photobyBraydenDykes)

Disclaimer

Totheextentpermittedbylaw,theMurray‒DarlingBasinAuthorityandtheCommonwealthexcludesallliabilitytoanypersonforanyconsequences,includingbutnotlimitedtoalllosses,damages,costs,expensesandanyothercompensation,arisingdirectlyorindirectlyfromusingthisreport(inpartorinwhole)andanyinformationor material contained within it.

Accessibility

The Murray‒Darling Basin Authority makes its documents and information available in accessible formats. On some occasions the highly technical nature of the document means that we cannot make some sections fully accessible. If you encounter accessibility problems or the document is in a format that you cannot access, please contact us.

Page1

Objectives and outcomes for river operations in the River Murray System

Contents

1.Preliminary

2.Commencement

3.Interpretation

4.General Objectives and Outcomes

5.Specific Objectives and Outcomes

6.Achieving Objectives and Outcomes

7.Referring instances of possible non-compliance to others

8.Referring conflicts between objectives to others

9.Emergencies

10.Annual Operating Plan

11.Determining the volume of State water entitlements

12.Reports

13.Matters to be referred for advice, information or determination

14.Matters to be referred to the Committee

15.Other matters to be referred to the Committee

16.Matters which need not be referred to the Committee if the Authority seeks the advice
of the Water Liaison Working Group

17.Matters which the authority need not refer

18.Providing relevant information

19.Review and revision

AppendixA:SpecificObjectivesandOutcomes...... 24

Page1

Objectives and outcomes for river operations in the River Murray System

1.Preliminary

(1)Paragraph26(1)(c)andsub-clause31(1)oftheAgreementrespectively:

(a)empowertheCommitteetomakehighleveldecisionsinrelationtoriveroperationsandtosetobjectivesandoutcomestobeachievedbytheAuthorityinrelationtoriveroperations;and

(b)requiretheCommitteetoapproveadocumentwhichspecifiesthoseobjectivesandoutcomeseachyear,unlesstheCommitteedeterminesotherwise.

(2)Thisdocument:

(a)specifiescertaingeneralobjectivesandoutcomestobeachievedbytheAuthorityinclause4;and

(b)providesfortheCommitteeprogressivelytospecifyinAppendicesSpecificObjectivesandOutcomesrelatingtomatterssuchasthosespecifiedinclause5.

(3)Figure 1andFigure 2attheendofthisdocument,respectivelysetoutindiagrammaticformtherelationshipbetweenthisdocumentand:

(a)otherdocumentsofparticularsignificance;and

(b)othersupportingdocuments.

2.Commencement

(1)Subjecttosub-clause2(2),thisdocumenttakeseffectonthedayitisapprovedbytheCommittee.

(2)TheSpecificObjectivesandOutcomessetoutinanAppendixtothisdocumenttakeeffectonthedaythattheCommitteeapprovesthatAppendix,orsuchlaterdatespecifiedbytheCommittee.

3.Interpretation

(1)Definitions

Thefollowingdefinitionsapplyinthisdocumentunlessthecontextrequiresotherwise:

ActmeanstheWaterAct2007(Cth).

AgreementmeanstheMurray–DarlingBasinAgreement,Schedule1oftheAct.

AnnualOperatingPlanmeanstheAnnualOperatingPlanadoptedbytheAuthorityundersub-clause10(1)(a)foraparticularwateryear.

AuthoritymeanstheMurray–DarlingBasinAuthority.

BasinPlanhasthemeaningsetoutinsub-section4(1)oftheAct.

CommitteemeanstheBasinOfficialsCommittee.

emergencymeansanemergencythattheMinisterialCouncilhasagreedexists,forthepurposesofsub-clause29(3)oftheAgreement.

EmergencyActionPlanmeanstheEmergencyActionPlanreferredtoinsub-clause10(3).

generalobjectivemeansanobjectivesetoutin clause4.

generaloutcomemeansanoutcomesetoutinclause4.

LivingMurrayBusinessPlanmeansthebusinessplanagreedpursuanttoclause13oftheLivingMurrayIntergovernmentalAgreement.

LivingMurrayAnnualWateringPlanmeansthedocumentofthatnamedevelopedbytherelevantcommittee.

LivingMurrayIconSiteEnvironmentalWaterManagementPlanmeansalocalwateringplaninrespectofasignificantecologicalsite,referredtoinclause117oftheLivingMurrayBusinessPlan.

LivingMurrayIntergovernmentalAgreementmeanstheIntergovernmentalAgreementonAddressingWaterOverallocationandAchievingEnvironmentalObjectivesintheMurray–DarlingBasinof25June2004.

priorpracticemeanstheresolutions,practicesandproceduresoftheMinisterialCouncil,theRiverMurrayCommission,theMurray–DarlingBasinCommission,theCommitteeandoftheAuthorityunderwhichriveroperationswerecarriedoutundertheAgreementanditspredecessors,beforethecommencementofthisdocument.

Relevantcommitteemeansanyrelevantadvisorycommitteeincludingarelevantsection203CommitteeoranyotherrelevantcommitteeapprovedbyMinisterialCouncil.

ReviewGroupmeanstheIndependentRiverOperationsReviewGroupreferredtoinsub-clause12(3).

RiverMurrayOperationsCommitteemeanstheadvisorycommitteeofthatnameestablishedbyMinisterialCouncilundersub-clause15(1)oftheAgreement.

RiverMurraySystemhasthemeaningsetoutinsub-section86A(3)oftheAct.

RMOassetshasthemeaningsetoutinclause2oftheAgreement.

SnowySchemehasthemeaningsetoutinsub-clause2(32)ofScheduleFtotheAgreement.

SouthernBasinStatemeanseachofNewSouthWales,VictoriaandSouthAustralia.

SouthernConnectedBasinEnvironmentalWateringCommitteemeanstheadvisorycommitteeofthatnameestablishedbyMinisterialcouncilundersub-clause15(1)oftheAgreement,tosupporttheoperationalcoordinationofenvironmentalwaterdeliveryinthesouthern-connectedBasin.

specificobjectivemeansanobjectiveapprovedbytheCommitteeandspecifiedinanAppendix,pursuanttosub-clause6(3).

specificoutcomemeansanoutcomeapprovedbytheCommitteeandspecifiedinanAppendix,pursuanttosub-clause6(3).

StatewaterentitlementmeanstheentitlementofaStatetowater,determinedinaccordancewithPartXIIoftheAgreement.

WaterLiaisonWorkingGroupmeanstheadvisorycommitteeofthatnameestablishedbytheAuthorityundersubsection203(1)oftheAct.

waterorderhasthemeaningsetoutinsub-clause122(2)oftheAgreement.

waterresourceassessmentmeansawaterresourceassessmentreferredtoinsub-clause11(1).

wateryearmeansthetwelvemonthsfrom1Junetothefollowing31May.

(2)RulesforInterpretingthisdocument

Headingsareforconvenienceonly,anddonotaffectinterpretation.Thefollowingrulesalsoapplyininterpretingthisdocument,exceptwherethecontextmakesitclearthataruleisnotintendedtoapply.

(a)Thisdocumentmustbereadinconjunctionwithclauses30to35oftheAgreement.

(b)WordsandphrasesdefinedintheActthatarenototherwisedefinedinsub-clause3(1)havethesamemeaninginthisdocument.

(c)Areferenceto:

(i)legislation(includingsubordinatelegislation)istothatlegislationasamended,re-enactedorreplaced,andincludesanysubordinatelegislationissuedunderit;

(ii)adocumentoragreement,oraprovisionofadocumentoragreement,istothatdocument,agreementorprovisionasamended,supplemented,replacedornovated;

(iii)aclause,sub-clause,paragraph,sub-paragraphorAppendixisareferencetoaclause,sub-clause,paragraph,sub-paragraphorAppendixofthisdocument;and

(iv)anything(includingaright,obligationorconcept)includeseachpartofit.

(d)Asingularwordincludestheplural,andviceversa.

(e)Ifawordisdefined,anotherpartofspeechhasacorrespondingmeaning.

(f)Ifanexampleisgivenofanything(includingaright,obligationorconcept),suchasbysayingitincludessomethingelse,theexampledoesnotlimitthescopeofthething.

(g)AnAppendixtothisdocumentispartofthisdocument.

4.GeneralObjectivesandOutcomes

(1)Subjecttosub-clause30(1)oftheAgreementandclause6,theAuthoritymustachievetheobjectivesandoutcomesrequiredbythefollowingsub-clauses4(2)to(6),whenperformingitsriveroperationfunctions,butisnotrequiredtodosoinanyparticularorderofpriority.

(2)Waterstorageanddeliveryandaccounting

(a)Objectives

(i)TooperatetheRiverMurraySystemefficientlyandeffectivelyinordertodeliverStatewaterentitlements.

(ii)TomaximisethewateravailabletotheSouthernBasinStates,afterprovidingforoperatingcommitmentsintheRiverMurraySystem.

(b)Outcomes

(i)Theconservationofwaterandminimisationoflosses.

(ii)Theaccurateandtimelypreparation,delivery,reviewand,wherenecessary,amendmentofwateraccountsandwaterresourceassessments,inaccordancewiththisdocument.

(iii)ThedeliverytotheSouthernBasinStatesoftheirauthorisedwaterorders(includingwatertradedunderScheduleDoftheAgreement),unlessphysicalconstraintsoftheRiverMurraySystempreventthisfromoccurring.

(3)RMOassets

(a)Objectives

ToensurethatRMOassetsallowtheAuthoritytomanageanddeliverwaterthatisfitforthepurposeforwhichitistobeused,efficiently,effectivelyandsafely.

(b)Outcomes

(i)Theeffectivemanagement,maintenance,repair,renewalandreplacement,andtheprotectionofthesecurity,ofRMOassets.

(ii)TheeffectivemanagementandmitigationofanyemergencyoccurringatRMOassets.

(iii)ConductriveroperationsinwaysthatprotectthestructuralandoperationalintegrityofRMOassets.

(iv)Themanagementoffloodsinorderto:

  • firstly,protectthesecurityofrelevantRMOassets;then
  • secondly,tomaximisetheavailablewater,calculatedinaccordancewithclause102oftheAgreement,attheendoftherelevantfloodingepisode;andthen
  • thirdly,subjecttotheforegoingitems,limitflooddamagetodownstreamcommunitiesandincreasebenefitstotheenvironmentandpublicamenity,forexample,byprolongingwetlandinundationorbysupportingrecreationalactivities.

(v)UseexistingandnewRMOassetstodeliverenvironmentalwatermoreeffectivelyandtoachieveenvironmentalobjectivesforwaterdependentecosystems.

(4)Peopleandcommunities

(a)Objectives

(i)TocontributetothesafetyofcommunitiesalongtheRiverMurray.

(ii)Tocontributeto,andhaveregardfortheeconomic,social,environmentalandculturalactivitiesandvaluesofpeopleusingtheRiverMurraySystem.

(iii)Theprovisionofwatertomeetcriticalhumanwaterneeds.

(b)Outcomes

(i)Productiverelationshipswithrivermanagers,usersandotherstakeholderswithaninterestinriveroperationsaremaintained

(ii)Consistentlywithsub-paragraph4(3)(b)(iv),damagetodownstreamcommunitiesislimited,whenmanagingflooding.

(iii)Eventsthatmayadverselyaffectthequalityofwateravailableforurban,irrigation,industrial,environmental,recreationalorstockanddomesticusearemitigated.

(iv)TherequirementsofmajorpubliceventsusingpartsoftheRiverMurraySystemareproperlyconsidered.

(v)NavigationalandrecreationalusesoftheRiverMurraySystemareproperlyconsidered.

(vi)Appropriateregardisgiventoculturalheritagematters.

(5)Environment

(a)Objectives

Tocontributetotheprotectionand,wherepossible,restorationofpriorityenvironmentalassetsandecosystemfunctionswithintheRiverMurraySystem.

(b)Outcomes

(i)Riveroperationsaremanagedinwayswhichimproveenvironmentalattributesandsupportecosystemfunctionsandprocesses.

(ii)Environmentalwateringactivitiesarefacilitatedhavingregardtothe environmental watering plans of the Commonwealth, The Living Murray, and Southern Basin States.

(iii)Theknowledge,documentaryandpracticebasesforeffectiveenvironmentalwateringareallimproved,togetherwithcollaborationbetweenrelevantstakeholdersrelatingtothesematters.

(iv)TheWaterLiaisonWorkingGroupandanyotherrelevantcommitteereceivetimelyinformationaboutanysignificantactualorpredictedchangetotheRiverMurraySystem’swaterresources,inaccordancewithsub-clause15(5).

(v)Theriskofsignificantadverseenvironmentaleventsisreducedand,wheresuchaneventisunavoidable,itsimpactismitigated.

(vi)Riveroperationsaremanagedandoperationalpracticesreviewed,andifnecessaryaltered,toensurethatriverscanbemanagedtoachievemultipleobjectives.

(6)CommunicationandInformationmanagement

(a)Objectives

ToensurethattheAuthority,inoperatingtheRiverMurraySystem:

(i)usesthebestavailabledata,toolsandsystems;

(ii)keepsallstakeholderswithaninterestintheAuthority'sriveroperationswellinformedofitsplansandactivities;

(iii)actstransparently;and

(iv)isaccountableforitsactionsinaccordancewiththeAgreement.

(b)Outcomes

(i)TheMinisterialCouncil,theCommittee,theRiverMurrayOperationsCommittee,theWaterLiaisonWorkingGroup,otherrelevantcommittees,otherstakeholderswithaninterestintheAuthority'sriveroperationsandthepublicareeachprovidedwithappropriate,timelyandaccurateinformationabouttheAuthority'sriveroperations.

(ii)AppropriateandeffectivemeansareusedtocommunicatewithstakeholdersandtorefermatterstotheWaterLiaisonWorkingGroupandCommittee,inaccordancewiththisdocument.

(iii)AnyrecommendationsoftheCommitteeinrelationtotheestablishment,termsofreference,operationsorrecommendationsoftheReviewGroupareimplemented.

(iv)HydrometricstationsformingpartofRMOassets,asrequiredbyclause45oftheAgreement,aremanagedaccordingtobestpracticemethodstocollect,transfer,storeandassurethequalityofalldata,inaccordancewithanyrelevantagreementwithaSouthernBasinState,andsupportforecastingoffutureconditionsintheRiverMurraySystem.

5.SpecificObjectivesandOutcomes

(1)TheCommitteewill,duringthecurrentwateryearandthereafter,progressivelyspecifycertainSpecificObjectivesandOutcomesfortheAuthority'sriveroperationsinrelationtoanyorallof:

(a)adesignatedreachoftheRiverMurraySystem;

(b)adesignatedriveroperationactivity;

(c)anyRMOasset,

andmaydeterminetherelativeprioritywhichtheAuthoritymustgivetoachievinganyspecificobjectiveoroutcome.

(2)TheCommitteewillspecifyanymatterreferredtoinsub-clause5(1)inanAppendix.

(3)Subjecttoclause30(1)oftheAgreementandclause6,theAuthoritymustachievetheSpecificObjectivesandOutcomesspecifiedpursuanttothisclausewhenperformingitsriveroperationsfunctions.

(4)Withoutlimitingsub-clause5(1)or5(2),theCommitteemayprogressivelyspecifySpecificObjectivesandOutcomesfor:

(a)thefollowingreachesoftheRiverMurraySystem:

(i)UpperMurraytoHumeDam;

(ii)MittaMittaRiver,includingDartmouthDam;

(iii)HumeDamtoYarrawongaWeir,includingLakeMulwala;

(iv)YarrawongaWeirtoTorrumbarryWeir;

(v)TorrumbarryWeirtoEustonWeir;

(vi)TheEdwardsandWakoolRiverSystems;

(vii)EustonWeirtoWentworthWeir;

(viii)WentworthWeirtotheSouthAustralianborder,includingLakeVictoria;

(ix)SouthAustralianbordertoWellington;

(x)WellingtontotheMurrayMouth,includingLakesAlexandrinaandAlbert,thebarragesandtheCoorong;and

(xi)LowerDarling,includingMenindeeLakesandtheinteractionbetweentheLowerDarlingandtheGreatDarlingAnabranch

(b)thefollowingriveroperationactivities:

(i)managingtheinteractionbetweentheRiverMurraySystemandtheSnowyScheme;

(ii)carryingoutwaterresourceassessments;

(iii)preparingandmaintainingwateraccounts;

(iv)makingadjustmentsfortransfersofwaterentitlementsandallocationsunderScheduleDoftheAgreement;

(v)communications;and

(vi)operationoftheRiverMurraySystem.

(5)Subjecttoclause5(7),duringanyperiodbeforeSpecificObjectivesandOutcomesarespecifiedundersub-clause5(1)foranyreachoftheRiverMurraySystem,anyriveroperationactivity,oranyRMOasset,butnotthereafter,theAuthoritymustconductitsriveroperationsconsistentlywith:

(a)eachgeneralobjectiveandoutcome;and

(b)priorpractice,

inrelationtothatreachoftheRiverMurraySystem,riveroperationactivityorRMOasset.

(6)IftheAuthorityhasanydoubtaboutthenatureofpriorpracticeinrelationtoanyreachoftheRiverMurraySystem,riveroperationactivityorRMOasset,itmustseektheadviceoftheWaterLiaisonWorkingGroup.

(7)Ifthereisaconflictbetween:

(a)ageneralobjective,generaloutcome,previouslyspecifiedobjectiveorpreviouslyspecifiedoutcome(eachanexistingrequirement);

AND

(b)priorpractice,

inrelationtoanyreachoftheRiverMurraySystem,riveroperationorRMOasset,theexistingrequirementmustbeobserved.

6.AchievingObjectivesandOutcomes

Eachgeneralorspecificobjectiveandoutcomespecifiedunderclause4or5includesaprovisionthatitmaybeachieved:

(1)onlybyactingatalltimesinaccordancewiththeAgreementandthisdocument;and

(2)withoutlimitingparagraph6(1),bydoingonlywhatisreasonablypracticableinallthecircumstances,aftertakingintoconsideration:

(a)whetherornoteachoftheSouthernBasinStateshasprovidedtheAuthoritywithtimelyandaccuratehydrometricandotherdatarequiredbytheAuthoritytoperformitsriveroperationseffectively;

(b)thehighvariabilityanduncertaintyoftheRiverMurraySystemrelatingto:

(i)weatherconditionsandassociatedfactors(suchasprecipitationandevaporationrates);

(ii)inflowstorivers;

(iii)useofwaterpursuanttowaterallocationsandbyotherusers;

(iv)carry-overofwaterallocationsbetweenwateryears;

(v)theinteractionof,andmovementofwaterbetween,groundwaterandsurfacewatersources;

(vi)thequalityofwater;

(vii)thedifficultyofaccuratelypredictinganyofthemattersreferredtoinparagraph6(b)(ii);

(viii)thetimethatwatertakestotravelandotherphysicalconstraintsoftheRiverMurraySystem;

(ix)rainfallandstreamflowforecastsbytheBureauofMeteorologyfortheRiverMurraySystem;and

(x)thesocialand/oreconomicconsequencesofparticularactivities.

(c)limitstotheaccuracyofhydrologicalmodels(suchasmodelsforwateraccountingandwaterresourceassessment)andofrainfallandstreamflowforecasts;

(d)uncertaintyaboutchangestothegeomorphologyofriverchannelsnearflowgaugingstations;

(e)theneedtoimplementparticularriveroperationsactivitiessuchasmaintainingorrefurbishingRMOassets;

(f)theoccurrenceofanyunforeseenevent;and

(g)uncertaintyabouttheenvironmentalconsequencesofparticularactivities(forexample,becauseofuncertaintyaboutecosystem,naturalbiologicalorbiophysicalprocesses).

7.Referringinstancesofpossiblenon-compliancetoothers

(1)If,afterconsideringthemattersreferredtoinsub-paragraphs6(b)-(g),theAuthorityconcludesthatitmaybeunabletoachieveanygeneralorspecificobjectiveoroutcomespecifiedunderclause4or5inaccordancewithclause6without:

(a)failingtoactinaccordancewiththeAgreementorthisdocument;or

(b)affectinganyStatewaterentitlement,theAuthoritymustreferthemattertotheWaterLiaisonWorkingGroupforadvice.

(2)IftheWaterLiaisonWorkingGroupsoadvises,theAuthoritymustreferthemattertotheCommitteeafterfirstseekingtheadviceoftheRiverMurrayOperationsCommittee.

(3)IfamatterisreferredtotheCommitteeundersub-clause7(2),theCommitteemayapprovetheAuthorityundertakingriveroperationsotherthaninaccordancewiththisdocument.

8.Referringconflictsbetweenobjectivestoothers

(1)IftheAuthorityconsidersthatitmaybeunabletoachieveoneormoreofthegeneralorspecificobjectivesoroutcomesspecifiedunderclause4or5,inwholeorinpart,becauseofaconflictbetweeneitherorbothofobjectivesandoutcomes,theAuthoritymustreferthemattertotheWaterLiaisonWorkingGroupforadvice.

(2)IftheWaterLiaisonWorkingGroupsoadvises,theAuthoritymustreferthemattertotheCommitteeafterfirstseekingtheadviceoftheRiverMurrayOperationsCommittee.

(3)IfamatterisreferredtotheCommitteeundersub-clause8(2),theCommitteemayapprovetheAuthoritygivingprioritytooneormoreconflictingobjectiveoroutcome,despiteanyotherrequirementof,ormadeunder,thisdocument.

(4)TheCommitteemayonlygiveapprovalundersub-clause8(3)afterconsideringallrelevantprevailingcircumstances(includingwhethergivingprioritytooneormoreconflictingobjectivemayhaveamaterialeffectonanyStatewaterentitlement).

(5)Sub-clause(1)doesnotprecludetheAuthorityfromseekingadvicefromanyotherrelevantcommittee.

9.Emergencies

(1)Inplanningandconductingriveroperations,theAuthoritymusthaveregardtothepossibilitythattheoccurrenceofanemergencymayrequiretheAuthorityimmediatelytorespondtothatemergency.

(2)IftheMinisterialCouncilagreesthatanemergencyexistspursuanttosub-clause29(3)oftheAgreement,paragraph29(3)(b)oftheAgreementauthorisestheMinisterialCounciltodecidethattheAuthorityshouldcarryoutriveroperationsotherwisethaninaccordancewiththisdocument.

(3)TheAuthoritymust:

(a)haveandmaintainanEmergencyActionPlan;and

(b)provideacopyoftheEmergencyActionPlan,asamendedfromtimetotime,totheCommittee.

(4)Exceptasprovidedinsub-clause9(2),inanemergencytheAuthoritymustconductitsriveroperationsinaccordancewiththeEmergencyActionPlan,aftertakingintoconsiderationanyrequestsmadetotheAuthoritybyanypersonauthorisedtoactunderanyemergencyordisasterplanadoptedbyaSouthernBasinState.

(5)Subjecttotherequirementsofsection86FoftheActandanydecisionoftheMinisterialCouncilundersub-clause29(3)oftheAgreement,ifduringanemergency:

(a)theAuthorityundertakesanyriveroperation,orfunctionrelatingtoriveroperations,thatisinconsistentwith,ornotprovidedforin,anyobjectivesoroutcomesspecifiedunderclauses4or5orintheAnnualOperatingPlanforthatwateryear;and

(b)theproposaltoundertakethatriveroperationorfunctionhasnotpreviouslybeenreferredtotheCommittee,

theAuthoritymustgiveawrittenreporttotheCommitteerelatingtoitsperformanceofthatriveroperationorfunctionassoonaspracticableandnolaterthanfiveworkingdaysaftertheriveroperationorfunctionwasperformed.

10.AnnualOperatingPlan

(1)PreparationandAdoption

(a)Onorbefore31 Julyineachwateryear,theAuthoritywillprepareandadoptanAnnualOperatingPlanfortheRiverMurraySystemforthe following twelve months.

(b)AnAnnualOperatingPlanwill:

(i)beconsistentwitheverydocumentreferredtoinFigure 1;

(ii)haveregardto the environmental watering plans of the Commonwealth, The Living Murray and Southern Basin States;

(iii)bepreparedbytheAuthorityafterconsideringadvicefromtheWaterLiaisonWorkingGroupandanyotherrelevantcommitteesabouttheappropriatecontentofthedraftAnnualOperatingPlan;and

(iv)include:

(A)theanticipatedhydrologicalcircumstancesintheRiverMurraySystematthestartoftherelevantwateryear;

(B)hydrologicalassumptionsmadebytheAuthorityfortherelevantwateryear;

(C)theAuthority'sestimateofthevolumeofwateravailabletomeetthewaterentitlementofeachSouthernBasinStateatthestartoftherelevantwateryear(includinganyreservesofwaternotusedinthepreviouswateryear);

(D)theAuthority'sestimateofthevolumeofwaterrequiredtomeetotherparticularpurposesdesignatedbytheAgreement(suchasminimumreserves)duringtherelevantwateryear;

(E)theAuthority'sestimateofthevolumeofwateravailabletomeetthepurposesreferredtoinsub-sub-paragraph10(b)(iv)(d);

(F)anyrisktothequalityorquantityofwateravailabletomeetcriticalhumanwaterneeds;

(G)RiveroperationsplannedbytheAuthoritytobeundertakenduringtherelevantwateryear(includingriveroperationsforenvironmentalpurposes)underseveralpossiblescenariosofwateravailability;and

(H)anyproposalbytheAuthoritywhichhaspreviouslybeenapprovedbytheCommittee,toaffectthewaterentitlementofanyStatebydepartingtemporarilyfromtheusualwateraccountingproceduresappliedbytheAuthority,duringtherelevantwateryear.

(c)TheAuthoritywillgiveacopyofanyAnnualOperatingPlanadoptedunderparagraph10(1)(a)totheRiverMurrayOperationsCommitteeandtheCommittee.

(d)TheAuthoritywillcarryoutitsfunctionsunderPartsXII(DistributionofWaters)andXIV(EffectofSnowyScheme)oftheAgreementinaccordancewiththeAnnualOperatingPlanadoptedfortherelevantwateryear,unlessthisdocument,theAgreementortheActrequirestheAuthoritytodootherwise.

(2)Monitoringprogress

(a)Onceineverythreemonths,oratsuchothertimesrequestedbytheWaterLiaisonWorkingGroup,theAuthorityagreestoprepareasummaryofdatarelatingtotheimplementationoftheAnnualOperatingPlan.

(b)Asummaryofdatapreparedunderparagraph10(2)(a)willsetoutdatatoindicate:

(i)howriveroperationshavebeenconductedbytheAuthorityintheprecedingmonthsofthewateryear;and

(ii)howriveroperationsmightbeconductedduringtheremainderofthatwateryear,havingregardtobotharangeofpossibleoutlooksandtheAnnualOperatingPlan.

(c)TheAuthoritywillgiveacopyofeachsummaryofdatapreparedunderparagraph10(2)(a)totherepresentativeofeachSouthernBasinStateontheWaterLiaisonWorkingGroup,intimeforthatsummarytobeconsideredatthefirstmeetingoftheWaterLiaisonWorkingGroupafterthesummaryhasbeenprepared.

(d)IftheAuthorityconsidersthatasummaryofdataindicatesthattheremayneedtobeasignificantchangetotheriveroperationsenvisagedbytheAnnualOperatingPlan(becauseof,forexample,thepossibilityofgreaterflowsintheRiverMurraySystemthanwerepreviouslyanticipated,ortheneedtoundertakeemergencyworkonanRMOasset),theAuthoritywillreviewtheAnnualOperatingPlaninaccordancewithsub-clause10(3).

(3)Reviewandamendment

(a)TheAuthority,inconsultationwiththeWaterLiaisonWorkingGroup,willreviewtheAnnualOperatingPlan:

(i)inOctoberofeveryyear;

(ii)atsuchothertimesasmayberecommendedbytheWaterLiaisonWorkingGroup;

(iii)wheneverrequiredpursuanttoparagraph10(2)(d);and

(iv)atanyothertimethattheAuthoritythinksappropriate.

(b)Areviewconductedunderparagraph10(3)(a)will:

(i)setoutinformationrelevanttoeachpossiblescenarioofwateravailabilityconsideredintheAnnualOperatingPlan;

(ii)setoutinformationaboutriveroperationsconductedbytheAuthorityduringtheprecedingmonthsoftherelevantwateryear;and

(iii)indicatewhethertheAuthoritystillexpectstoundertaketheplannedriveroperationssetoutintheAnnualOperatingPlanduringtheremainderoftherelevantwateryearand,ifnot,whatchangestotheplannedriveroperationsareproposedbytheAuthority.

(c)TheAuthoritymay,fromtimetotime,amendanAnnualOperatingPlan,whetherornotithaspreviouslyconductedareviewpursuanttoparagraph10(3)(a),afterseekingadvicefrom:

(i)theWaterLiaisonWorkingGroup, and if it so recommends, the River Murray Operations Committee;and subsequently

(ii)iftheRiverMurrayOperationsCommitteesorecommends,advice will be sought from theCommittee.

(d)TheAuthoritywillgiveacopyofanyamendedAnnualOperatingPlantotheRiverMurrayOperationsCommitteeandtheCommittee.

11.DeterminingthevolumeofStatewaterentitlements

(1)Forthepurposesofdetermining,fromtimetotime,thevolumeofeachStatewaterentitlementinthecourseofanywateryeartheAuthorityhasagreedtomakewaterresourceassessmentsinaccordancewiththisclausemonthly,oratsuchotherintervalsastheWaterLiaisonWorkingGroupmayrecommend.

(2)TheAuthoritywillmakeeachwaterresourceassessmentunderseveralpossiblescenariosofwateravailability.

(3)IftheCommitteesorequires,theAuthoritywillprepareforecastsofeachStatewaterentitlementfortheensuingwateryear,bypreparingwaterresourceassessmentsinaccordancewiththisclause.

(4)AtsuchintervalsastheCommitteemayrequire,theAuthoritywillreviewand,ifitconsidersittobeappropriate,amendanyhydrologicalassumptionstobemadeforanywaterresourceassessment,afterseekingtheadviceoftheWaterLiaisonWorkingGroup.

(5)Awaterresourcesassessmentwill:

(a)takeintoaccountanyadvicegivenbytheWaterLiaisonWorkingGroupundersub-clause11(4);

(b)beconsistentwithanyrelevantspecificobjectivesoroutcomesspecifiedunderclause5or,intheabsenceofrelevantspecificobjectivesoroutcomes,beconsistentwithpriorpractice;

(c)determinetheforecastvolumeofwaterattheendofthecurrentwateryearof:

(i)eachStatewaterentitlement;

(ii)thewateravailabletomeetcriticalhumanwaterneedsunderclauses102Aand102BoftheAgreement;

(iii)anyadvanceofwaterforcriticalhumanwaterneedswhichtheCommitteemayneedtodetermineunderclause102CoftheAgreement;

(iv)anyrepayableadvanceofwatermadetoaStateinaprecedingwateryear,thatisincludedinaStatewaterentitlement;

(v)thecurrentconveyancereservedeterminedbytheAuthorityunderclause102DoftheAgreement;

(vi)thecurrentminimumreservedeterminedbytheAuthorityunderclause103oftheAgreement;and

(vii)waterwhichmustbeusedforadesignatedpurposeduringtherelevantwateryear,asaresultofadecisionmadebytheMinisterialCouncil,theCommitteeortheAuthority,inaccordancewiththeAgreement.

(d)statethewatersharingtierthatappliesinthecurrentwateraccountingperiod.

(6)TheAuthoritywillprovideeachState'srepresentativeontheWaterLiaisonWorkingGroupwitheachwaterresourceassessmentpreparedbytheAuthorityeither:

(a)monthly;or

(b)atanymorefrequentintervalsapprovedbytheCommittee.

(7)TheAuthoritywillpromptlyprovideeachRiverMurrayOperationsCommitteememberandeachCommitteememberrepresentingaSouthernBasinStatewithasummaryofeachwaterresourceassessmentreferredtoinsub-clause11(6)atthesameintervalsrequiredbythatparagraph.

12.Reports

(1)WaterAccounts

(a)TheAuthorityhasagreedtopreparemonthlywateraccountsforeachSouthernBasinState,asataspecifieddateintheprecedingmonth,inaccordancewiththisclause.

(b)Wateraccountswill:

(i)beconsistentwithanyrelevantSpecificObjectivesandOutcomesspecifiedunderclause5or,intheabsenceofrelevantSpecificObjectivesandOutcomes,beconsistentwithpriorpractice;

(ii)setoutthevolumeofwatertobeallocatedtoNewSouthWalesandVictoria,respectively,pursuanttoclauses106and107oftheAgreement;

(iii)setoutthevolumeofanyflowstowhichNewSouthWalesandVictoriaarerespectivelyentitledunderclause108oftheAgreement;

(iv)setoutthevolumeofwaterbeingheldineachmajorstorageforeachSouthernBasinState;

(v)setout,foreachSouthernBasinState,thevolumeofwaterthenintransitintheRiverMurraySystem;

(vi)setoutthevolumeofwaterdeemedtobeusedrespectivelybyNewSouthWalesandVictoria,pursuanttoclause109oftheAgreement;

(vii)duringanyperiodofspecialaccounting,setoutanyimbalancecalculatedunderclause126oftheAgreement,asadjustedbytheAuthorityunderclause127oftheAgreement,whereappropriate;

(viii)beconsistentwithpart4ofScheduleGAccountingforSouthAustralia’sStorageRightstotheAgreement;and

(ix)beconsistentwithpart4ofScheduleHWaterSharingDuringTiers2and3totheAgreement.

(c)AtintervalsagreedbetweentheAuthorityandeachSouthernBasinState,theAuthoritywillprovidethatState'srepresentativeontheWaterLiaisonWorkingGroupwiththewateraccountspreparedforthatStatesincewateraccountswerelastprovidedtothatrepresentative.

(2)AnnualRiverOperationsreport

(a)By31Julyineachyear(orsuchlaterdatedeterminedbytheCommittee)theAuthorityhasagreedtoprepareandgivetotheRiverMurrayOperationsCommitteeandtheCommitteeanAnnualRiverOperationsReportonriveroperationsundertakenbytheAuthorityduringtheprecedingwateryear,inaccordancewiththisclause.

(b)AnAnnualRiverOperationsReportwill:

(i)summarisetheriveroperationscarriedoutbytheAuthority;

(ii)indicatethedegreetowhichanygeneralorSpecificObjectivesandOutcomesspecifiedunderclauses4or5wereachievedbytheAuthority;

(iii)indicateanydeparturesfromthegeneralandSpecificObjectivesandOutcomesreferredtoinsub-paragraph12(2)(b)(ii)thatwereapprovedbytheCommitteeandundertakenbytheAuthority;

(iv)reportontheoperationofSouthAustralia’sstoragerights,pursuanttoclause29ofScheduleGtotheAgreement;

(v)setouteachmatterwhichtheAuthorityreferredtotheCommitteetodetermineunderclause33oftheAgreementandthenatureofthatdetermination;and

(vi)setoutanyothersignificantresolutionsmade,oractionstakenbyeitherorboththeCommitteeor/andtheAuthorityinrelationtoriveroperations(includinganyalterationsmadetoriveroperationsthatweremadeinordertocomplywithrequirementsoftheAct,theAgreementoranyotherlegislationapplyingtotheAuthority).

(3)AnnualreviewofRiverOperations

(a)Pursuanttosub-section203(1)oftheAct,theAuthorityhasdeterminedtoappointanIndependentRiverOperationsReviewGrouptoassistitinperformingitsfunctionsunderthisdocument,withtheconstitutionandfunctionsandfollowingtheproceduressetoutinthisdocument.

(b)Subjecttoparagraph12(3)(e),theAuthoritywillappointuptofourmembersoftheReviewGroupfromalistofatleastfour,andnomorethanseven,personsnominatedbytheCommittee,eachofwhomhassignificantexpertisein,orsignificantexperiencerelatingto,riveroperations and one member of the Review Group from a list of at least two and no more than three persons nominated by the Committee each of whom has significant expertise in, or significant expertise relating to, environmental water delivery.

(c)Subjecttoparagraph12(3)(d),section204oftheActappliestomembersoftheReviewGroup.

(d)IftheCommitteerecommendsthattheAuthorityterminatetheappointmentofamemberoftheReviewGroup,theAuthoritywillconsiderthatrecommendationwhendecidingwhethertoterminatetheappointmentundersection204(5)oftheAct.

(e)IftheAuthorityterminatestheappointmentofoneormoremembersnominatedbytheCommitteeunderparagraph12(3)(b),theAuthoritywillappointoneormorereplacementmembers,asrequired,fromalistofatleasttwicethenumberofpersonsrequiredtobeappointed,nominatedbytheCommittee,eachofwhomhassignificantexpertisein,orsignificantexperiencerelatingto,riveroperations.

(f)EachyeartheReviewGroupmustreviewtheAuthority'scompliancewiththeprovisionsofthisdocumentduringtheprecedingwateryear,havingregardto:

(i)generalandSpecificObjectivesandOutcomesapplyingtothatwateryear;

(ii)intheabsenceofanyrelevantSpecificObjectivesandOutcomesforareachoftheRiverMurraySystem,RMOassetorriveroperationsactivity,thepriorpracticefortherelevantreach,RMOassetoractivity;

(iii)theprovisionsofclause6;and

(iv)anyotherrelevantmatter.

(g)Forthepurposeofconductingatimelyreview,theAuthoritywillgivetheReviewGroupcopiesofthewateraccountsandAnnualRiverOperationsReportforthepreviouswateryear,by1Augustinanyyear.

(h)TheReviewGroupmustgivetheAuthorityaReviewReport,settingouttheresultsofthereviewconductedunderparagraph12(3)(f)by30Septemberinanyyear.

(i)AfterreceivingaReviewReport,theAuthoritywillgiveittotheWaterLiaisonWorkingGroupforthepurposeofmakingcommentsonanyrelevantmatteroffactorinterpretationsetoutinthatreport.

(j)AfterreceivinganycommentsfromtheWaterLiaisonWorkingGroup,theAuthoritywillsubmit ittothefirstmeetingoftheRiverMurrayOperationsCommitteeheldafter1Novemberinanyrelevantyear.

(k)TheAuthoritywillsubsequentlysubmittothenextmeetingoftheCommittee:

(i)theReviewReport;

(ii)anycommentsmadebytheWaterLiaisonWorkingGroupontheReviewReport;

(iii)anyadvicemadebytheRiverMurrayOperationsCommitteeontheReviewReport;

(iv)anyadvicetheAuthoritymaywishtogivetheCommitteeinrelationtomatterssetoutintheReviewReport;and

(v)anyactionswhichtheAuthorityproposestotakeinthelightofmatterssetoutintheReviewReport.

13.Matterstobereferredforadvice,informationordetermination

(1)Pursuanttosub-clauses31(1),33(3)and30(3)respectively,oftheAgreement:

(a)theAuthoritymustrefertotheCommitteefordetermination,afterfirstseekingtheadviceoftheRiverMurrayOperationsCommittee:

(i)anymatterrelatingtocarryingonriveroperationswhichthisdocumentrequiresittorefer;and

(ii)anydecisionthattheAuthorityproposestomakeinrelationtoriveroperationsthathasthepotentialtohaveamaterialeffectonaStatewaterentitlement;and

(b)theAuthoritymustactinaccordancewithanydeterminationmadebytheCommitteerelatingtothatmatterordecision.

(2)Pursuanttosub-clause33(3)and26(1)(c)oftheAgreement,clauses14,15and16respectivelysetoutmattersrelatingtoriveroperationswhichtheAuthority:

(a)mustrefertotheCommittee;

(b)needonlybereferredtotheCommitteeiftheWaterLiaisonWorkingGroupsoadvisestheAuthority;and

(c)neednotbereferredtotheCommitteeiftheAuthorityfirstseekstheadviceoftheWaterLiaisonWorkingGroup,beforedeterminingthematter.

(3)Forthesakeofclarity,clause17setsoutmattersrelatingtoriveroperationswhichtheAuthoritymaydeterminewithoutreferringthemattertoeithertheCommitteeortheWaterLiaisonWorkingGroup.

14.MatterstobereferredtotheCommittee

(1)InadditiontothemattersthatmustbereferredtotheCommitteepursuanttoclauses7and8,theAuthoritymustrefereachofthefollowingmatterstotheCommitteefordetermination,afterfirstseekingtheadviceoftheRiverMurrayOperationsCommittee,inthecircumstancessetoutbelow.

(a)InsufficientChannelCapacity

Anypreviousdirectiongivenorproceduredeterminedundersub-clause98(1)orclause66oftheAgreement,respectively,iftheAuthorityconsidersthatifthedirectionorprocedureisimplementedintheprevailingcircumstances,itisreasonablylikelytoresultineither:

(i)insufficientwaterbeingprovidedtomeetalldownstreamordersforwater;or

(ii)downstreamchannelcapacitybeingexceededifalldownstreamordersforwateraremet.

(b)ReductioninWaterAllocationswithinaState

AnyproposalbytheAuthoritytoadjustthevolumeofwateravailabletomeetaStatewaterentitlement,iftheAuthorityconsidersthatsuchanadjustmentislikelytorequireaSouthernBasinStatetoreducethevolumeofallocationsithaspreviouslyannouncedasbeingavailabletowaterentitlementholdersinthatwateryear.

(c)Matterreferredtoinparagraph33(1)(b)oftheAgreement

Pursuanttoparagraph33(1)(b)oftheAgreement,anymatterwhichtwoormoremembersoftheCommitteehaverequiredtobereferredtotheCommitteeinthecircumstancessetoutinthatparagraph.

15.OthermatterstobereferredtotheCommittee

(1)Inadditiontothemattersreferredtoinclauses7and8,theAuthoritymustrefertotheCommitteefordetermination,afterfirstseekingtheadviceoftheRiverMurrayOperationsCommittee,anymatterrelatingtoriveroperationsthat:

(a)isnotdealtwithin,orisinconsistentwith,aspecificobjective,aspecificoutcomeorwithanyotherprovisionofthisdocument;or

(b)twoormoremembersoftheWaterLiaisonWorkingGroup,whorepresentSouthernBasinStates,considermayhavethepotentialtohaveamaterialeffectonanyStatewaterentitlementbecauseadeterminationrelatingtothatmattermayrequireaSouthernBasinStatetoreducethevolumeofallocationsithaspreviouslyannouncedasbeingavailabletowaterentitlementholdersinthatwateryear.

(2)Withoutlimitingsub-clause15(1),iftheAuthorityconsidersthatanyofthefollowingeventsisreasonablylikelytooccur,itmustnotifytheWaterLiaisonWorkingGroupofthatfact,assoonaspracticable.

(a)Specialaccounting

TheAuthoritydeclaresorterminatesaperiodofspecialaccountingpursuanttoclauses123or129oftheAgreement.

(b)Directionaboutavalleyaccount

TheAuthoritygives,amendsorcancelsadirectionaboutwaterstandingtothecreditofavalleyaccountpursuanttosub-clause11(4)ofScheduleDoftheAgreement.

(c)Unregulatedflows

(i)TheflowoftheRiverMurrayattheconfluenceofFrenchman'sCreekislikelytoexceed,foraperiodofatleastoneweek,thesumof:

(A)thequantitieswhichSouthAustraliaisentitledtoreceiveunderclauses88or90oftheAgreement;

(B)thevolumeofwatertobeusedforenvironmentalpurposesthenbeingdeliveredtoSouthAustralia;

(C)thevolumeofanyotherwaterwhichisthenrequiredtobedeliveredtoSouthAustraliaundertheAgreement(forpurposessuchasdilutionflows,satisfyingwatertradingcommitmentsorsupplyingpreviouslydeferredentitlements);

(D)anyquantitieswhich,intheopinionoftheAuthority,shouldandcanbeimpoundedinLakeVictoria;and

(E)anyquantitiesorderedforusebyNewSouthWalesandVictoria.

(ii)AnyotherunregulatedflowislikelytooccuratsuchlocationandofsuchmagnitudeanddurationastheCommitteemaydeterminefromtimetotime,andnotifytotheAuthority.

(d)VariationofmonthlyquantitiesforSouthAustralia

TheAuthorityvariesanymonthlyquantitywhichSouthAustraliaisotherwiseentitledtoreceive,pursuanttoclause90oftheAgreement.

(e)ChangeintheAuthority'sabilitytodirectreleasesfromMenindeeLakesStorage

AnychangeintheAuthority'sabilitytodirectreleasesfromMenindeeLakesStorage,throughtheoperationofclause99oftheAgreement.

(f)Internalspill

Aninternalspill,withinthemeaningofclause116oftheAgreement,occursinDartmouthReservoir,HumeReservoir,LakeVictoriaortheMenindeeLakesStorage.

(3)WhetherornottheAuthorityhasnotifiedtheWaterLiaisonWorkingGroupundersub-clause15(2),itmustnotifytheWaterLiaisonWorkingGroupassoonaspracticableafteraneventreferredtointhatsub-clauseoccurs.

(4)IftwoormoremembersoftheWaterLiaisonWorkingGroupeachofwhomrepresentsaSouthernBasinStatesoadvisetheAuthority,theAuthoritymustinformtheRiverMurrayOperationsCommitteeandtheCommitteeaboutanymatternotifiedtotheWaterLiaisonWorkingGroupundersub-clause15(2)or15(3),assoonaspracticableafterreceivingthatadvice.

(5)TheAuthoritymustalsonotifytheChairoftheSouthernConnectedBasinEnvironmentalWateringCommittee:

(a)ofanymatterreferredtoinparagraph15(2)(c),atthesametimeasitnotifiestheWaterLiaisonWorkingGroup;and

(b)assoonaspracticable,ifitconsidersthat,asaresultofitsriveroperations,anopportunityislikelytoarisetomeetoneormoreoftheenvironmentalwateringoutcomessetoutinthe environmental watering plans of the Commonwealth, The Living Murray and the Southern Basin States.

16.MatterswhichneednotbereferredtotheCommitteeiftheAuthorityseekstheadviceoftheWaterLiaisonWorkingGroup

(1)Despiteanyotherprovisionofthisdocument(includinganygeneralorspecificobjectiveoroutcome)iftheAuthorityproposestoexerciseafunctionrelatingtoriveroperationswhichtheAuthorityconsidersthataSouthernBasinStatemightregardasbeingofparticularsignificance,theAuthoritymust:

(a)notifytheWaterLiaisonWorkingGroupoftheproposalatleasttwoweeksbeforetheAuthorityproposestoexercisethatfunction,whereverpossible;and

(b)consideranyrelevantadvicegivenbytheWaterLiaisonWorkingGrouprelatingtothatproposal,beforetheAuthoritydecidestoexercisethefunction.

(2)Withoutlimitingsub-clause16(1),theAuthoritymustnotify,andconsideranyrelevantadvicefrom,theWaterLiaisonWorkingGroupbeforeitdecidestoamendorcancelanydirectionmadeunderparagraph11(4)(a)ofScheduleDtotheAgreement,whichrelatestowaterstandingtothecreditofavalleyaccount,wherethatdirectionisnotinaccordancewiththeAnnualOperatingPlanforthatwateryear.

17.Matterswhichtheauthorityneednotrefer

Forthesakeofclarity,theCommitteedoesnotrequiretheAuthoritytorefertoeithertheWaterLiaisonWorkingGroup,theRiverMurrayOperationsCommittee,ortheCommitteeanymatterrelatingtotheAuthorityperformingitsriveroperationsfunctionsunderclause29oftheAgreement,exceptanymatterthatitisrequiredtorefer:

(1)underparagraph33(1)(a)or(b)orsub-clause33(3)oftheAgreement;or

(2)underclauses7,8,10,15or16oranyotherprovisionofthisdocument.

18.Providingrelevantinformation

(1)WhenreferringamattertotheWaterLiaisonWorkingGroup,RiverMurrayOperationsCommitteeortheCommittee:

(a)pursuanttoparagraph33(1)(a)or(b)orsub-clause33(3)oftheAgreement;or

(b)underclauses7,8,Error! Reference source not found.,15or16,oranyotherprovisionofthisdocument,theAuthoritymustgivetheWaterLiaisonWorkingGroup,RiverMurrayOperationsCommittee,ortheCommittee,asthecaserequires:

(i)allinformationavailabletotheAuthoritythatisrelevanttothematterreferred;

(ii)anyfurtherinformationwhichtheWaterLiaisonWorkingGroup,theRiverMurrayOperationsCommittee,ortheCommitteemayrequest;

(iii)informationabouthowthematterreferredisrelatedtoanygeneralorspecificobjectiveoroutcomespecifiedunderclauses4or5;

(iv)acopyofanyadvicereceivedbytheAuthorityaboutthematterfromanyrelevantcommittee;and

(v)inthecaseofamatterreferredtotheCommittee,aclearstatementofthetermsofanydeterminationsoughtbytheAuthorityfromtheCommittee.

(2)IftheAuthorityisrequiredtoestimatetheeffectofaproposeddecisionoractiononaStatewaterentitlementforthepurposeofprovidinginformationundersub-clause18(1),theAuthoritymustestimateandcompare:

(a)thevolumeofwaterthatwouldbeanticipatedtobeavailabletomeetthatStatewaterentitlementiftheproposeddecisionoractionisnotmadeortaken;with

(b)thevolumeofwaterthatwouldbeanticipatedtobeavailabletomeetthatStatewaterentitlementiftheproposeddecisionoractionismadeortaken.

(3)Inestimatinganeffectundersub-clause18(2),theAuthoritymusteitheruse:

(a)thewateraccountingandassessmentmodelsotherwiseusedforthepurposesoftheAgreement;or

(b)someothermethod(suchasusingdailyoperationalspreadsheets)thattheAuthorityconsiderstobesuitableinthecircumstances.

19.Reviewandrevision

(1)Subjecttosub-clauses19(2)and19(3),theCommitteewillreviewtheoperationofthisdocumenteachyear.

(2)IftwoormoremembersoftheCommitteesorequest,andtheCommitteeconsidersitappropriatetodoso,theCommitteewillreviewtheoperationofthisdocumentatanyothertime.

(3)TheCommitteewillreviewtheoperationofthisdocumentassoonaspracticableafter:

(a)theAuthoritypublishesaproposedBasinPlan,oranyproposedamendmenttoaBasinPlan;

(b)theMinisterialCouncilamendstheAgreementinarelevantway;or

(c)theRiverMurrayOperationsCommitteerecommendsthatanyspecificobjectiveorspecificoutcomereferredtoinclause5shouldbeadopted,amendedorrepealed.

(4)WhenevertheCommitteereviewsthisdocument,itwill:

(a)consultwiththeRiverMurrayOperationsCommittee;and

(b)haveregardtothemostrecentReviewReportpreparedbytheReviewGroup.

(5)IftheCommitteedecidesthatanyamendmentisrequiredtothisdocumentasaresultofareviewconductedunderthisclause,itwill,assoonaspracticable:

(a)maketherequiredamendment;and

(b)approvetheamendeddocumentpursuanttosub-clause31(1)oftheAgreement.

Figure1:Relationshipsbetweenthisdocumentandotherdocumentsofparticularsignificance

Note:Inthisfigure,areferencetoaclauseistoaclauseoftheAgreement.

Figure2:Relationshipsbetweenthisdocumentandothersupportingdocuments

Inthisfigure,unlessstatedotherwise,areferencetoaclauseistoaclauseinthisdocument.

Deliberately left blank

Page 1

Objectives and outcomes for river operations in the River Murray System

AppendixA:SpecificObjectivesandOutcomes

ApprovedonbytheBasinOfficialsCommittee

Effectivefrom29April2016

Deliberately left blank

Page 1

Objectives and outcomes for river operations in the River Murray System

AppendixA:SpecificObjectivesandOutcomes

TableofContents

Introduction

1.Dartmouth Dam

1.1.Maximum planned regulated release

1.2.Airspace management and flood operations

1.3.Maximum rate of rise and fall in River level during planned regulated releases

1.4.Minimum planned regulated releases

1.5.Practices to be replaced by this document

2.Hume Dam and Reservoir

2.1.Maximum planned regulated releases

2.2.Maximum rate of fall in River level during planned regulated releases

2.3.Minimum planned regulated releases

2.4.Airspace management and flood operations

2.5.Practices to be replaced by this document

3.Yarrawonga Weir

3.1.Maximum planned regulated flow

3.2.Flood Operations at Yarrawonga Weir

3.3.Management of Lake Mulwala during the irrigation season

3.4.Supporting social and recreational use of Lake Mulwala

3.5.Minimum planned regulated release from Yarrawonga Weir

3.6.Practices to be replaced by this document

4.BarmahMillewa Forest

4.1.BarmahMillewa Forest Environmental Water Allocation accounting provisions

4.2.Forest Regulator Operation

4.3.Practices to be replaced by this document

4.4.Practices to be revoked by this document

5.Edward-Wakool System

5.1.Use of the Wakool System

5.2.Edward River Offtake Operation

5.3.Gulpa Creek Offtake Operation

5.4.Werai Forest Regulators Operation

5.5.Authority water orders downstream of Stevens Weir

5.6.Practices to be replaced by this document

6.Torrumbarry Weir

6.1.Practices to be revoked by this document

7.Swan Hill

7.1.Minimum water level at Swan Hill

7.2.Practices to be replaced by this document

8.Weir and Lock No. 10 – Wentworth Weir

8.1.Minimum River Murray contribution to flow over Weir and Lock 10 –
Wentworth Weir

8.2.Practices to be replaced by this document

9.Lake Victoria

9.1.Lake Victoria Operating Strategy

9.2.Inlet and outlet flow rates

9.3.Full Supply Level of Lake Victoria

9.4.Maximum rate of rise of Lake level

9.5.Improving water quality using Lake Victoria

9.6.Practices to be replaced by this document

9.7.Practices to continue despite this document

10.Menindee Lakes Storage (when the Authority has the ability to direct releases)

10.1.Maximum planned regulated release downstream of Menindee Lakes Storage

10.2.Maximum rate of rise and fall in flow rates downstream of
Menindee Lakes Storage

10.3.Minimum planned regulated releases from Menindee Lakes

10.4.Distribution of water stored within Menindee Lakes Storage

10.5.Practices to be replaced by this document

10.6.Practices to be revoked by this document

11.Lower Lakes Barrages

11.1.Operation of the Lower Lakes Barrages

12.System Operation

12.1.Harmony Operation of Dartmouth and Hume Reservoirs

12.2.Harmony Operation of the Menindee Lakes Storage and Lake Victoria

12.3.Additional Dilution Flows to South Australia

12.4.Bulk transfer from Dartmouth Reservoir to Hume Reservoir

12.5.Bulk transfers from Hume Reservoir to Lake Victoria

12.6.Management of rain rejection events

12.7.Planning for, and communication of potential unregulated flow advice

12.8.Variability in river flow patterns and levels

12.9.Use of bypasses of the Barmah Choke

12.10.Lindsay River Allowance

12.11.Dealing with shortfalls in meeting water demands

12.12.Adjustment of flows to South Australia in response to rating table changes

12.13.Determining the minimum inflow prediction

12.14.Practices to be replaced by this document

12.15.Practices to be revoked by this document

13.Water Accounts

13.1.Maintenance of the Water Accounts, including the Water Accounting Model,
model code and associated data

14.Water Resource Assessment

14.1.Maintenance of the Water Resource Assessment model, including the model
code and associated data

14.2.Minimising the impacts of one State leaving a period of special accounting

15.Tier 2 and 3 Water Sharing Arrangements

15.1.Advances of water to support critical human water needs or the conveyance
reserve

15.2.Remedial actions

15.3.Priorities for water allocation in periods of Tier 2 and 3 water sharing arrangements

15.4.Setting aside the conveyance reserve

Attachment A to Specific Objectives and Outcomes

Planned environmental water

Bulk Entitlement (River Murray – Goulburn Murray Water - Flora & Fauna) Conversion
Order 1999 - Consolidated as at 23 June 2011

SpecificObjectivesandOutcomes

Introduction

  1. TheObjectivesandOutcomesforRiverOperationsintheRiverMurraySystemdocument(ObjectivesandOutcomesdocument)allowsfortheCommitteetomakeSpecificObjectivesandOutcomesfortheoperationoftheRiverMurraySystem(clause5oftheObjectivesandOutcomesdocument).Thisappendixgiveseffecttothisrequirement.
  2. EachgeneralandspecificobjectiveandoutcomemustbeachievedinaccordancewiththerequirementsoftheObjectivesandOutcomesdocument.
  3. UnlessotherwiseagreedbytheCommittee,theinitialversionoftheSpecificObjectivesandOutcomeshasbeenpreparedinaccordancewith;

(i)thedecisionsoftheMinisterialCouncil,formerRiverMurrayCommission(RMC),theformerMurray-DarlingBasinCommission(MDBC)andtheCommitteepriortotheadoptionoftheSpecificObjectivesandOutcomesdocument;and

(ii)establishedpracticesinrelationtoriveroperationsthatappliedpriortothecommencementofthisdocumentthathadnotbeenformallyapprovedbyanauthorisingbody.

  1. TheSpecificObjectivesandOutcomesareconsistentwiththerulesoftheformerdecisionmakingbodies,buthavebeenupdatedtoreflectcontemporarypractice.Theywillberevisedandamendedonanasneedsbasistoensure:

(i)theyreflectcontemporarypracticesandincorporatedecisionsmadebytheCommitteeunderclause26oftheAgreementandadviceprovidedunderclause201oftheWaterAct2007afterAugust2012;

(ii)consistencywiththerequirementsandassumptionsoftheBasinPlan,suchasthoserelatingtosystemdelivery,andoperationalandpolicyconstraints.

  1. TheMurray-DarlingBasinAuthority(theAuthority)willdevelopproceduresunderclauses66and98oftheAgreementthatprovidemoredetailonhowtheseSpecificObjectivesandOutcomeswillbeimplemented.TheAuthoritywillprogressivelydevelopproceduresinconsultationwiththepartiestotheAgreementtosupporteachSpecificObjectiveandOutcome.

Page 1

Objectives and outcomes for river operations in the River Murray System

  1. DartmouthDam

Version / DateApproved / Revisedby / Summaryofrevisions
1 / 14/02/2013 / ReviewoftheAgreementTaskforce / RiveroperatingrulesagreedbytheBasinOfficialsCommitteeatmeeting11(AgendaItem9.1)updatedtoensuretheyreflectcontemporarypracticeandareincorporatedintothecurrentgovernanceframework.
2 / 29/04/2014 / BasinOfficialsCommittee / SO&O1.4amendedtoensuretheminimumreleaseisalways200ML/d,butallowingittoincreasedependingonstoragelevelsandwaterquality.

1.1.Maximumplannedregulatedrelease

(a)Purpose

ToestablishamaximumplannedregulatedreleasedownstreamofDartmouthDamthatbalancesdeliveringentitlementsandwaterorderstotheSouthernBasinStates,(O&Osub-clause4(2))withlimitingdamagetodownstreamcommunities(O&Osub-clause4(4)).

(b)SpecificObjective

PlannedregulatedreleasesfromtheDartmouthPondageWeir(Banimboola)todeliverStatewaterentitlementsandtransferstoLakeHumewillbemanagedtolimitdamagetolandholdersbetweenDartmouthDamandHumeReservoir.

(c)SpecificOutcome

Inmakingregulatedreleases,theAuthoritywillnotplantoexceedthemaximumregulatedflowbetweenDartmouthDamandHumeReservoir,unlessforthepurposesoffloodoperations.

(d)Interpretation

TheCommitteeadvisesthatthemaximumregulatedflowbetweenDartmouthDamandHumeReservoirshouldcontinuetobedeterminedby3.4mlocalgaugeheightontheTallandoongauge,whichisequivalenttoanominalflowof10000ML/day.

1.2.Airspacemanagementandfloodoperations

(a)Purpose

ToestablishanairspacemanagementandfloodoperationstrategyforDartmouthDamthatisconsistentwithO&Osub-clause4(3).

(b)SpecificObjectives

(i)FloodmanagementatDartmouthDamisconsistentwiththegeneralobjectiveforfloodmanagement4(3)(b)(iii).

(ii)AirspacemanagementatDartmouthDam,whethertargetoradditional,forthepurposeoflimitingdamagetodownstreamcommunities,shouldhaveminimalrisktosecurityofsupplyinbothHumeandDartmouthReservoirswithoutcompromisingtheintegrityofeitherDam.

(iii)DuringfloodoperationsatDartmouthDam,theAuthoritywillliaisewithrelevantagenciesinordertocoordinatethemanagementofthefloodingevent.

(c)SpecificOutcome

(i)AirspacemanagementatDartmouthDamwillbebasedonaveryhighprobabilitythatDartmouthwillbeeffectivelyfullpriortodemanddownstreamofHumeReservoirexceedinginflowstoHume.

(ii)AirspacemanagementatDartmouthDamwillnotresultinlessthanthetargetairspaceatHumeReservoir.

(iii)AirspacemanagementatDartmouthDamwillcontributetothemitigationoffloodingconditionsdownstreamofbothDartmouthandHumeDams.

(iv)CommunicationinregardstothemanagementofthefloodingeventbetweentheAuthorityandrelevantparties,includingweatherforecastingandemergencyagenciesandrelevantStateConstructingAuthorities,willremainaccurateandtimelyandkeepallrelevantpartieswellinformed.

(d)Interpretation

TheCommitteeadvisesthatpostfloodoperations,basedontransitioningtoworst-caseplanningwaterresourceassessment,DartmouthDamshouldbeeffectivelyfull(99%ofthetotalcapacityatFSL)whendownstreamdemandsexceedinflows.

1.3.MaximumrateofriseandfallinRiverlevelduringplannedregulatedreleases

(a)Purpose

ToestablishamaximumrateofriseandfallinriverlevelheightsforplannedregulatedreleasesfromDartmouthPondageWeir(Banimboola)thatbalances:

  • theconservationofwaterandminimisationoflosses(O&Osub-clause4(2));
  • thecontributiontothesafetyofcommunities(O&Osub-clause4(4));and
  • thecontributiontotheprotectionandwherepossible,restorationofpriorityenvironmentalassetsandecosystemfunctions(O&Osub-clause4(5))intheDartmouthDamtoHumeReservoirreach.

(b)SpecificObjective

PlannedregulatedreleasesfromDartmouthPondageWeir(Banimboola)willbemanagedsothatratesofriseandfallofriverlevelheightsinthedownstreamreachtoHumeReservoirdonotcontributetobankinstability,andtoprovidetimeforadequatewarningtoMittaMittaRivercommunitiesofsignificantchangesinriverlevelbetweentheDartmouthPondageWeirandHumeReservoir.

(c)SpecificOutcome

Inmakingregulatedreleases,theAuthoritywillnotplantoexceedthemaximumratesofriseandfallinriverlevelbelowtheDartmouthPondageWeir(Banimboola).

(d)Interpretation

Excludingfloodoperations,theCommitteeadvisesthattheAuthorityshouldcontinuetoimplementthefollowingmaximumtargetratesofriseandfallofplannedregulatedreleasesfromtheDartmouthPondageWeirwhenflowsarewithinthemaximumplannedregulatedrelease(section1.1);

MaximumrateoffallatColemansgauge[1](localgaugeheight)of:

(i)20mm/hourwhenwaterlevelatColemansgaugeisgreaterthan1.75mandtheBanimboolaPowerStationisoperatingnormally;

(ii)60mm/hour,butnotmorethan720mminany24hoursatallothertimes

MaximumrateofriseatColemansgauge(localgaugeheight)of:

(i)150mm/hourwhilethedepthatColemansgaugeislessthan1.25m;

(ii)100mm/hourwhilethedepthatColemansgaugeisbetween1.25mand1.75m;

(iii)50mm/hourfordepthsatColemansgaugegreaterthan1.75m.

1.4.Minimumplannedregulatedreleases

(a)Purpose

ToestablishaminimumplannedregulatedreleasefromtheDartmouthPondageWeir(Banimboola)thatbalancestheconservationofwaterandminimisationoflosses(O&Osub-clause4(2))withcontributingtotheprotectionand,wherepossible,restorationofpriorityenvironmentalassetsandecosystemfunctions(O&Osub-clause4(5)).

(b)SpecificObjective

MinimumplannedregulatedreleasesfromtheDartmouthPondageWeir(Banimboola)toprovideforriparian,amenityandin-streamneeds,willbemanagedtoconservewaterintheDartmouthReservoirwhilstsupportingenvironmentalassetsandecosystemfunctionsbetweenDartmouthandHumeReservoirs.

(c)SpecificOutcome

Inmakingregulatedreleases,theAuthoritywillnotplantofallbelowminimumflowratetargetsatColemansgauge.

(d)Interpretation

TheCommitteeadvisesthatthefollowingminimumplannedflowratestargetedatColemansgaugeshouldcontinuetobe:

Table2:MinimumplannedflowratestargetedatColemansgauge

Dartmouthvolume / Minimumplannedflowrates
Atalltimes / 200ML/day
60%DartmouthVolume<-70% / Averageof200-300ML/daytomanagewaterqualityandecosystemfunction.
70%DartmouthVolume<-80% / Averageof200-400ML/daytomanagewaterqualityandecosystemfunction.
DartmouthVolume80% / Averageof200-500ML/daytomanagewaterqualityandecosystemfunction.

TheAuthorityDelegateshallapprovereleasingatflowratesabove200ML/d.Actinginaccordancewithclause16(1)theAuthoritywillnotifyandconsideradvicefromtheWLWG(atleasttwoweekspriortoexercisingthefunction)ifitconsidersthataSouthernBasinStatemightregardtheriveroperationasbeingofparticularsignificance.

TheCommitteeadvisestheAuthoritytoconsidervariabilityinriverflowpatternsandlevelswhenmakingminimumplannedregulatedreleasesfromDartmouthDam,consistentwithSpecificObjectiveandOutcome12.8

Theaverageflowwillbecalculatedovertheperiodoftimethestoragevolumeisateachstoragerange.

1.5.Practicestobereplacedbythisdocument

(a)Regulatedreleaseof10000ML/dfromDartmouthDam-AssumedbytheMurray-DarlingBasinCommissionon1June1999,Meeting51,AgendaItem7,butincontextthiswasnotexplicitapproval(Practice8).

(b)DartmouthDampre-releaseoperation–WithintheoperationaldiscretionoftheAuthority(Practice38).

(c)DartmouthDamfloodoperation-WithintheoperationaldiscretionoftheAuthority(Practice37).

(d)MaximumrateofriseandfallofriverleveldownstreamofDartmouthDam-ApprovedbytheMurray-DarlingBasinCommissionon18-19May1993,Meeting25,AgendaItem17,(Practice16).

(e)MinimumreleasesfromDartmouthDam-approvedbytheMurray-DarlingBasinCommissionon18-19May1993,Meeting25,AgendaItem17(Practice10).

Page 1

Objectives and outcomes for river operations in the River Murray System

  1. HumeDamandReservoir

Table3:HumeDamsectionversioncontrolinformation

Version / DateApproved / Revisedby / Summaryofrevisions
1 / 14/02/2013 / ReviewoftheAgreementTaskforce / RiveroperatingrulesagreedbytheBasinOfficialsCommitteeatmeeting11(AgendaItem9.1)updatedtoensuretheyreflectcontemporarypracticeandareincorporatedintothecurrentgovernanceframework.
2 / 11/12/2014 / MDBAinconsultationwithWaterLiaisonWorkingGroup / TemporaryamendmentmadetotheSpecificObjectiveandOutcome2.2-MaximumrateoffallinRiverLevelforthe2014-15and2015-16wateryearstoreflecttheagreedrevisedratesoffallatBasinOfficialsCommitteemeeting30.ApprovedatBasinOfficialCommitteemeeting30(agendaitem15)on11/12/2014

2.1.Maximumplannedregulatedreleases

(a)Purpose

ToestablishamaximumplannedregulatedreleasedownstreamofHumeDamthatbalancesdeliveringentitlementsandwaterorderstotheSouthernBasinStates (O&Osub-clause4(2))withlimitingdamagetodownstreamcommunities(O&Osub-clause4(4)).

(b)SpecificObjective

PlannedregulatedreleasesfromHumeDamtodeliverStatewaterentitlementsandtransferstoLakeVictoriawillbemanagedtolimitdamagetolandholdersbetweenHumeDamandYarrawongaWeir.

(c)SpecificOutcome

Inmakingregulatedreleases,theAuthoritywillnotplantoexceedthemaximumregulatedflowbetweenHumeReservoirandYarrawongaWeir,unlessforthepurposesoffloodoperations.

(d)Interpretation

TheCommitteeadvisesthatthemaximumregulatedflowbetweenHumeDamandYarrawongaWeirshouldcontinuetobeaflowof25000ML/day(currently3.83mlocalgaugeheight)attheDoctor’sPointgauge[2].

2.2.MaximumrateoffallinRiverlevelduringplannedregulatedreleases

(a)Purpose

ToestablishamaximumrateoffallinriverlevelforplannedregulatedreleasesfromHumeDamthatbalancestheconservationofwaterandminimisationoflosses(O&Osub-clause4(2))withcontributingtotheprotectionand,wherepossible,restorationofpriorityenvironmentalassetsandecosystemfunctions(O&Osub-clause4(5))intheHumeDamtoYarrawongareach.

(b)SpecificObjective

ChangesinriverleveldownstreamofHumeDamwillbemanagedtolimitthepotentialforplannedregulatedreleasestocontributetobankinstabilitybetweenHumeDamandYarrawongaWeir.

(c)SpecificOutcome

Inmakingregulatedreleases,theAuthoritywillnotplantoexceedthemaximumratesoffallinriverlevelbelowHumeDam.

(d)Interpretation

Excludingfloodoperations,whenflowsarebetween12,000ML/dayandthemaximumplannedregulatedrelease(section2.1)theCommitteeadvisesthattheAuthorityshouldtarget:

(i)anaveragerateoffallof0.15mperdayovernomorethansixdaysatDoctor’sPoint,withamaximumrateoffallonanygivendayofnomorethan0.225m;and

(ii)anaveragerateoffallof0.20mperdayovernomorethansixdaysatHeywoods,withamaximumrateoffallonanygivendayofnomorethan0.225m.

Whenflowsarebelow12,000ML/dtheAuthorityshouldmakereleasesfromHumeDamtoatargetmaximumrateoffallinriverlevelbelowHumeDamof0.2m/day(8inches)atHeywood’sgaugeand0.15m/day(6inches)attheDoctor’sPointgauge.

2.3.Minimumplannedregulatedreleases

(a)Purpose

ToestablishaminimumplannedregulatedreleasefromHumeReservoirthatbalancestheconservationofwaterandminimisationoflosses(O&Osub-clause4(2))withcontributingtotheprotectionand,wherepossible,restorationofpriorityenvironmentalassetsandecosystemfunctions(O&Osub-clause4(5)).

(b)SpecificObjective

MinimumplannedregulatedreleasesfromHumeDamtoprovideforriparian,amenityandin-streamneeds,willbemanagedtoconservewaterintheHumeReservoirwhilstsupportingenvironmentalassetsandecosystemfunctionsbetweenHumeReservoirandYarrawongaWeir.

(c)SpecificOutcome

Inmakingregulatedreleases,theAuthoritywillnotplantofallbelowminimumflowratetargetsdownstreamofHumeDam.

(d)Interpretation

TheCommitteeadvisesthattheminimumregulatedflowtargetsdownstreamofHumeDamshouldcontinuetobe600ML/dayatHeywoodsBridgegauge[3]andanaverageflowof1200ML/dayattheDoctor’sPointgauge.

2.4.Airspacemanagementandfloodoperations

(a)Purpose

ToestablishanairspacemanagementandfloodoperationstrategyforHumeReservoirthatisconsistentwithO&Osub-clause4(3).

(b)SpecificObjective

(i)FloodmanagementatHumeReservoirisconsistentwiththegeneraloutcome forfloodmanagement4(3)(b)(iv).

(ii)AirspacemanagementatHumeReservoir,whethertargetoradditional,forthepurposeoflimitingdamagetodownstreamcommunities,shouldhaveminimalrisktosecurityofsupplyinHumeReservoirwithoutcompromisingtheintegrityoftheDam.

(iii)DuringfloodoperationsatHumeReservoir,theAuthoritywillliaisewithrelevantagenciesinordertocoordinatethemanagementofthefloodingevent.

(c)SpecificOutcome

(i)AirspacemanagementatHumeReservoirwillbebasedonaveryhighprobabilitythatthestoragewillbeeffectivelyfullpriortodemanddownstreamofHumeReservoirexceedinginflowstoHume.

(ii)AirspacemanagementatHumeReservoirwillcontributetothemitigationoffloodingconditionsdownstreamoftheDam.

(iii)CommunicationinregardstothemanagementofthefloodingeventbetweentheAuthorityandrelevantparties,includingweatherforecastingandemergencyagencies,relevantStateConstructingAuthoritiesandtheRiverMurrayActionGroup,willremainaccurateandtimelyandkeepallrelevantpartieswellinformed.

(d)Interpretation

TheCommitteeadvisesthatpostfloodoperations,basedontransitioningtoworst-caseplanningwaterresourceassessment,HumeReservoirshouldbeeffectivelyfull(99%ofthetotalcapacityatFSL)whendownstreamdemandsexceedinflows.

TheCommitteeadvisesthatthetargetairspaceforthepurposeoffloodmitigationatHumeReservoirshouldbewithintherangeof30GL-386GLwhichisequivalenttobetween0.15m-2.0mbelowFullSupplyLevel.

2.5.Practicestobereplacedbythisdocument

(a)Regulatedreleaseof25000ML/dfromHumeReservoir-Murray-DarlingBasinCommission,1June1999,Meeting51,AgendaItem7(Practice9).

(b)ThemaximumratesoffallofriverlevelatHeywoods(8”/day)andDoctorsPoint(6”/day)-RiverMurrayCommission,18September1957,Meeting183(Practice17).

(c)Minimumreleaseof1223ML/dfromHumeReservoir,RiverMurrayCommission,5May1958(Practice11).

(d)HumeReservoirpre-releaseoperation,discussedbutnotexplicitlyagreedtobytheMurrayDarlingBasinCommissioninNovember1995(Practice35).

(e)HumeDamfloodoperation,withintheoperationaldiscretionoftheAuthority(Practice39).

Page 1

Objectives and outcomes for river operations in the River Murray System

  1. YarrawongaWeir

Table4:YarrawongaWeirsectionversioncontrolinformation

Version / DateApproved / Revisedby / Summaryofrevisions
1 / 14/02/2013 / ReviewoftheAgreementTaskforce / RiveroperatingrulesagreedbytheBasinOfficialsCommitteeatmeeting11(AgendaItem9.1)updatedtoensuretheyreflectcontemporarypracticeandareincorporatedintothecurrentgovernanceframework.
2 / 10/12/2015 / River Murray Operations Committee / At meeting 37, BOC agreed to specify new SO&O 3.1a and amend SO&O 3.1 to become 3.1b. Minor amendments made to 3.1b for consistency with new SO&O 3.1a.

3.1.Maximumplannedregulatedflow

3.1.a Maximum planned regulated flow downstream of Yarrawonga Weir when inundation of the Barmah-Millewa Forest is desirable

(a)Purpose

To establish a maximum planned regulated flow downstream of Yarrawonga Weir when inundation of the Barmah-Millewa Forest is desirable, that balances operating the River Murray System efficiently and effectively in order to deliver State water entitlements (O&Osub-clause 4(2)), with contributing to the economic, social, environmental and cultural activities and values of people using the River (O&O sub-clause 4(4)) and contributing to the protection and restoration of priority environmental assets and ecosystem functions (O&Osub-clause 4(5)).

(b)SpecificObjective

Maximum planned regulated releases from Yarrawonga Weir when inundation of the Barmah-Millewa Forest is desirable, seek to limit impacts to downstream communities.

(c)SpecificOutcome

In making planned regulated releases, the Authority will not plan to exceed the maximum planned regulated flow downstream of Yarrawonga Weir when inundation of the Barmah-Millewa Forest is desirable.

(d)Interpretation

The Committee advises that the maximum planned regulated flow downstream of Yarrawonga Weir when inundation of the Barmah-Millewa Forest is desirable,is up to 3.3m at the Tocumwal Gauge, subject to:

  • consultation with potentially affected landholders in relation to planned regulated flows above 3.0 m at the Tocumwal Gauge;
  • adequate notice prior to commencement of those flows; and
  • the implementation of agreed measures and actions to limit impacts.
  • Further, from 1 October to 31 May planned regulated flows downstream of Yarrawonga Weir greater than 3.0 m at the Tocumwal Gauge will only occur if BOC is notified and no BOC member opposes the action.

Note that the water levels of 3.3m and 3.0m at the Tocumwal Gauge referred to above, are equivalent to flow rates of about 18000ML/dayand about 15,000ML/day downstream of Yarrawonga Weir, respectively.