GENERAL GUIDELINES FOR ESTABLISHING AN IRREVOCABLE LETTER OF CREDIT/ DOCUMENTARY CREDIT (SIGHT & USANCE)

  1. All the clauses within the L/C must be clear, concise and acceptable.

No special clauses, terms and conditions allowed.

  1. L/C to be confirmed by a local or foreign bank in Singapore unless LC is issued from an International Bank.
  1. L/C should be irrevocable, unrestricted and made available with any bank in Singapore by negotiation, unless it is confirmed.
  1. L/C must be for value more than USD50,000.00
  1. L/C must state that all charges inside or outside Singapore, including advising commission, negotiation commission, reimbursement charges, discrepancy charges, discount charges and interest, are for Applicant’s account.
  1. L/C must allow 21 days (minimum) from the shipment date for presentation of documents for negotiation
  1. Do not call for documents other than Commercial Invoices, Packing Lists and Transport Documents (Bills of Lading/Airway Bills/House Airway Bills/Delivery Orders) in the L/C.
  1. Do not call for any of the following documents in the L/C:
  • Beneficiary Certificate certifying that shipment details have been advised by telex or fax to Issuing Bank/ Applicant/ Insurance Company after shipment is effected
  • Certificate of Origin from Chambers of Commerce
  • Pre-shipment Certificate
  • Manufacture’s Warranty / Guarantee / Quality Certificate
  • Airlines or Carrier’s Agent Certificate
  1. Do not include delivery/shipping schedules, detailed product description/ part numbers in the L/C.
  1. L/C should allow partial shipment and transshipment but shipment & billing should be arranged for complete order in one single invoice. This arrangement is to cut down on LC bank charges as there is a minimum charge for every partial LC submission.
  1. L/C should allow shipment from Singapore.
For Usance LC Only
  1. For Usance L/C, prevailing Prime rate + 1.5% (not LIBOR or SIBOR or cost of funds) must be charged to Applicant from the time the draft is discounted till the final settlement of the bill. L/C must allow separate draft for the interest amount which must be payable over and above the L/C value.
  1. Maximum tenor for Usance L/C is 30 days from the date of the Transport Documents. (Any tenor higher than 30 days will require specific approval)
Important Notes
  1. Orders will not be released before the original L/C is received and vetted.
  1. Orders will not be released and hence documents will not be processed if the L/C contains discrepancies that requires amendments. i.e. Expired L/C or Shipment date, unacceptable clauses or others deemed as discrepancies.
  1. Any deviation from the above requires specific approval.
  1. For orders via LC payment, avoid partial delivery/billing as there is a minimum L/C bank charges for each document submission.

Note:

To avoid unnecessary LC amendment charges & shipment delay, draft LC must be forwarded to Ingram for vetting & acceptance.

For any LC queries, kindly contact Ms Lee Kim Kee at +65 6590-1664 or email her at