1.1 Project background and construction necessity 3

1.2 Purposes and principles for assessment 6

1.3 Preparation basis 7

1.4 Assessment level and assessment scope 14

1.5 Assessment standard 17

1.6 Time for assessment and prediction 19

1.7 Assessment method 19

1.8 Assessment content and key points of assessment 20

1.9 Conformance to industrial policy and planning 20

1.10 External environment relations and the environmental protection objects 21

2.0 Project Overview 25

2.1 Project name, project location and construction type 25

2.2 Construction project composition 25

2.3 Overview of main works 26

3.0 Project Analysis 36

3.1 Analysis of environmental problems of the Project 36

3.2 Introduction to process flow during construction period 37

3.3 Introduction to process flow during operation period 40

3.4 Main impact source analysis during construction period 40

3.5 Environmental impact source analysis during operation period 45

4.0 Environment Overview and Status Assessment 51

4.1 Natural environment overview 51

4.2 Environmental quality status survey and assessment 51

5.0 Environmental Impact Assessment 53

5.1 Social Environmental Impact Assessment 53

5.2 Ecological environmental impact assessment 55

5.3 Acoustic environment impact assessment 60

5.4 Water Environmental Impact Assessment 67

5.5 Atmospheric environmental impact assessment 71

5.6 Solid Waste Environmental Impact Assessment 74

5.7 Environmental Risk Impact Assessment 76

6.0 Water and Soil Conservation 79

7.0 Resettlement Plan 80

8.0 Public Consultation 81

8.1 Purpose of public consultation 81

8.2 Implementation of public consultation survey 82

8.3 Statistical analysis on survey results 85

9.0 Environmental Protection Measures and Techno-Economic Feasibility 88

9.1 Environmental protection measures during design stage 88

9.2 Measures to prevent pollution and mitigate impact during construction period 90

9.3 Measures to prevent pollution and mitigate impact during operation period 96

9.4 Investment estimation of environmental protection works 98

10.0 Environmental Protection Management and Environmental Monitoring 101

10.1 Environmental protection management 101

10.2 Environmental monitoring plan 105

10.3 Environmental supervision plan 111

11.0 Economic Cost-benefit Analysis on Environmental Impact 117

11.1 Purpose of environmental economic cost-benefit analysis 117

11.2 Method of environmental economic cost-benefit analysis 117

11.3 Social benefit analysis 117

11.4 Environmental benefit analysis 118

12.0 Environmental Impact Assessment Conclusion 121

Figures

Figure 1 Project Location Map

Figure 2-1 General Plan of Project Area (Hongchuan Town)

Figure 2-2 Drainage Plan of Project Area (Hongchuan Town)

Figure 2-3 General Plan of Project Area (Liujiang Town)

Figure 2-4 Road Plan of Project Area (Liujiang Town)

Figure 2-5 Water Supply Plan of Project Area (Liujiang Town)

Figure 2-6 Drainage Plan of Project Area (Liujiang Town)

Figure 3-1 General Layout of Hongchuan Town Subproject

Figure 3-2 General Layout of Liujiang Town Subproject

Figure 3-2-1 General Layout of Road of Liujiang Town

Figure 3-2-2 Layout Plan of Water Purification Plant of Liujiang Town

Figure 3-2-3 General Layout of Ecological Parking Lot of Liujiang Town

Figure 3-2-4 General Layout of Water Supply Pipe Network of Liujiang Town

Figure 4-1 Map of External Environmental Relations and Monitoring Point Distribution of Hongchuan Town Subproject

Figure 4-2-1 Map of External Environmental Relations and Monitoring Point Distribution of Liujiang Town Subproject (Overall)

Figure 4-2-2 Map of Liujiang Town External Environmental Relations and Monitoring Point Distribution of Liujiang Town Subproject (Local 1)

Figure 4-2-3 Map of Water Purification Plant External Environmental Relations and Monitoring Point Distribution of Liujiang Town Subproject (Local 2)

Figure 5-1 Map of Present Land Use of Hongchuan Town Subproject

Figure 5-2 Map of Present Land Use of Liujiang Town Subproject

Figure 6 Water System Map of Project Area

Figure 7 Soil Erosion Map of Project Area

Figure 8 Vegetation Distribution Map of Project Area

Figure 9 Hydrogeological Map of Project Area

Figure 10 Design Sketch of Standard Cross-section of Liujiang Town Subproject

Figure 11 Bridge Map of Liujiang Town Subproject

Annexes

Annex 1 Project Approval Document

Annex 2 Executive Standards for Environmental Protection of the Project

Annex 3 Planning & Construction Bureau Document on the Project

Annex 4 Water Resource Feasibility Report and Approval of Water Purification Plant in Liujiang Town Subproject

Annex 5 Water and Soil Conservation Scheme and Approval of the Project

Annex 6 Resettlement Action Plan of the Project

Annex 7 Project Land Documents

Annex 8 Flood Drainage Description of the Project

Annex 9 Document of Description and Delineation of Drinking Water Sources of the Project

Annex 10 Assessment of No Rare Animals and Plants in the Project

Annex 11 Project Monitoring Report

Annex 12 Public Consultation Sample Questionnaire and Respondent List of the Project

Annex 13 Power of Attorney of the Project

Hongya County Restructuring Component of Sichuan Small Towns Development Project by World Bank Loans / Foreword

Foreword

Hongya County has already determined in 2009 to implement the “Diverting Water from Qingyi River to the City” Project with the support of World Bank’s loan, and the project passed the World Bank appraisal in August 2010. The “Diverting Water from Qingyi River to the City” (Diversion Canal) Project is undertaken by Hongya county government, with a total length of 9200 meters and an estimated investment of RMB 104,816,600. The development organization of the project is Planning and Construction Bureau of Hongya County, and the construction companies are Zhejiang Provincial No.1 Water Conservancy & Electric Power Construction Group Holdings Co., Ltd. and Hunan Greenwood Urban Landscape Engineering Co., Ltd. The project includes water drainage, river training and water diversion works, and started construction from July 2013. It has proceeded smoothly after land requisition and resettlement in the early state, and currently, the 9km diversion canal for diverting water from Qingyi River to the city along with the harnessing of the moat at south and north of the city has been completed, promoting the reconstruction of the old city of Hongya County, improving the water system landscape along the canal, optimizing the land use pattern of the city, and improving the environmental quality.

The Hongya County Restructuring Component of Sichuan Small Towns Development Project by World Bank Loans was officially put forward based on the above mentioned conditions, which is the improvement and extension of the “Diverting Water from Qingyi River to the City” Project of Hongchuan Town, and will improve the municipal infrastructure of Liujiang Town (a famous ancient town) and life quality of the residents of and tourists to Hongya County. In June 2014, the Hongya County Housing and Urban-Rural Construction Bureau filled out the Screening Schedule in respect of the Hongya County Restructuring Component of Sichuan Small Towns Development Project by World Bank Loans. In August 2014, the Hongya County Housing and Urban-Rural Construction Bureau prepared the Project Proposal for the Hongya County Restructuring Component of Sichuan Small Towns Development Project by World Bank Loans. In this Project Proposal, apart from the improvement and extension of the above mentioned “Diverting Water from Qingyi River to the City” Project of Hongchuan Town, the improvement for the municipal infrastructure of Liujiang Town (another critical tourism town of Hongya County) is also included in the project construction.

According to the World Bank Loan—Feasibility Study Report on Hongya County Restructuring Component of Sichuan Small Towns Development Project: Hongya County Restructuring Component of Sichuan Small Towns Development Project by World Bank Loans is divided into two subprojects, i.e. Hongchuan Town Subproject and Liujiang Town Subproject. The former includes 1) River channel works: river dredging 2.2km, desilting 106,800 m3; riverine wetland governance 6.37801ha (about 95.62 mu); new river bank construction 2.2km, and river bank repair and renovation 1.8km. 2) Sewage pipe works: sewage pipe laying 2.35km. The latter includes 1) road works: new road construction 1.39km, and road reconstruction 0.97km. The road width is 8-12m as per the planning, meanwhile, underground pipe network, lighting, signs, mark lines, etc. will be provided. 2) Bridge works: 3 new bridges (1 foot bridge and 2 vehicular bridges). 3) Urban rainwater garden works: new public green land 67312.17m2, a total of 100mu. Build a complete urban rainfall flood management system and provide a public green land resource for daily leisure of the residents and the tourists by adopting the green infrastructure concept combining with road rainwater regeneration system, etc. 4) Water purification plant and pipe network project: 1 new water purification plant covering an area of 7.5mu, with short term (2020) capacity of 2500m3/d and long term (2030) capacity of 4500m3/d; and the new water transportation pipeline 12km. 5) Digital urban works: create various data resource platforms like geospatial framework data, unit grid data, management part data and geocoding data platforms to form a complete, closed and interconnected digital urban works management system. 6) Ecological parking lot: construct a single-layer ecological parking lot with a floor area of 7954m2, and 237 vehicular parking places (228 for private cars and 9 for buses) and 60 bicycle parking places (for public rental).

According to relevant provisions of the Environmental Protection Law of the People’s Republic of China, the Law of the People's Republic of China on Appraising of Environment Impacts and the Regulations on the Administration of Construction Project Environmental Protection, Southwest Jiaotong University was entrusted by the Hongya County Housing and Urban-Rural Construction Bureau to undertake the environment impact assessment work of that project and compile the Environmental Impact Assessment. After accepting the entrustment, the assessment unit established the project team to conduct the work as per the principles, methods, contents and requirements specified in the Technical Guideline for Environmental Impact Assessment. With the great help of the local government, the staff of the project team conducted the field reconnaissance and the environmental investigation in detail for the environmental sensitive points like the main residential area of the project implementation area, etc., and listened to the opinions of relevant departments and the masses, and collected the information widely. They also conducted a detailed investigation, consultation and opinion exchange work for the departments in the region where the project is located, like competent department for environmental protection, relevant department for implementing the land acquisition and resettlement work, urban planning department, water department, etc., sent the opinion consultation forms for the directly affected masses and recorded relevant opinions; carried out the monitoring work for atmospheric environment, water environment, acoustics environment as well as bottom mud of the moat of Hongchuan Town, and finally completed this Report in June 2015.

With the substantial support of numerous departments and relevant specialists in preparation of the Report, the environmental monitor station of Hongya County completed this monitoring work for relevant environmental factors of the assessment, and we hereby would like to express sincere thanks!

18

Hongya County Restructuring Component of Sichuan Small Towns Development Project by World Bank Loans / 1.0 Introduction

1.0 Introduction

1.1 Project background and construction necessity

1.1.1 Project background

Hongya County has already determined in 2009 to implement the “Diverting Water from Qingyi River to the City” project by World Bank loans, and it has passed the World Bank Project Assessment in August 2010. The “Diverting Water from Qingyi River to the City” (diversion canal) project undertook by the county government has a total length of 9200 meters, and estimated investment of RMB 104,816,600. The project owner is Planning and Construction Bureau of Hongya County, and the construction unit is Zhejiang Provincial No.1 Water Conservancy & Electric Power Construction Group Holdings Co., Ltd., and Hunan Greenwood Urban Landscape Engineering Co., Ltd. The work has been carried forward smoothly through earlier stage land requisition and demolishing resettlement, currently, 9 Km. diversion canal construction of the “Diverting Water from Qingyi River to the City” project along with the harnessing of the moat at south and north of the city has been completed, promoting the reconstruction of the old city of Hongya County, improving the water system landscape along the canal, optimizing the land use pattern of the city, and improving the environmental quality.

Hongya County Restructuring Component of Sichuan Small Towns Development Project by World Bank Loans was officially put forward based on the above mentioned conditions, which is aimed to improve and extend the “Diverting Water from Qingyi River to the City” project of Hongchuan Town, and improve the life quality of the residents of and tourists to Hongya County through improving the municipal infrastructures of Liujiang ancient town. In June 2014, the Hongya County Housing and Urban-Rural Construction Bureau filled out the Project Screening Schedule in respect of the Hongya County Restructuring Component of Sichuan Small Towns Development Project by World Bank Loans. In August 2014, the Hongya County Housing and Urban-Rural Construction Bureau prepared the Project Proposal for Hongya County Restructuring Component of Sichuan Small Towns Development Project by World Bank Loans.

1.1.2 Construction necessity

I. Demands for improving the urban flood control standard to ensure the life and property safety of the residents

Hongchuan Town Subproject is closely related to the Hongchuan town environmental comprehensive control subproject of Sichuan Small Towns Development Project by World Bank loans. The important purpose of Hongchuan Town environmental comprehensive control subproject of Sichuan Small Towns Development Project by World Bank loans which is implementing by our county is to clear the sludge and bury the sewage interception trunk pipe by dredging the old riverways (channels) within the city, and introduce river water with Class 2 water quality (10m3/sec), and make the river water flows through the city from the west to the east by two riverways (channels) in north and south to comprehensively improve the urban ecological environment and purify the water environment.

II. Demands for improving the ecological environment to improve the life quality of the residents

Hongchuan Town Subproject is located downstream from the Hongchuan Town environmental comprehensive control subproject, and the existing ecological environment is very poor, and the Class 2 water quality of the introduced Qingyi River water can be maintained only after it is fully renovated and flows back to Qingyi River, thus the ecological balance idea of “return the borrowed water with good quality water” can be achieved, and ensure the integrity of Hongchuan Town environmental comprehensive control subproject of Sichuan Small Towns Development Project by World Bank loans. In conclusion, construction of the project is necessary and shall be carried out as soon as possible. The project is an improvement and extension for the important purpose of Hongchuan Town environmental comprehensive control subproject of Sichuan Small Towns Development Project by World Bank loans, and the adhering idea has a high degree of unity,.