Annual sustainability report 2013-14

Prepared by:

Dean Gornall

Head of Facilities

Chris Harding

Director of Estates and Facilities

Covering paper:

Rob Elek

Director of Strategy & Business Development

Board of Directors

20th November 2014

Date produced:

9thOctober 2014

Annual sustainability report 2013-14: Covering paper

The detailed annual sustainability report for 2013-14 is appended to this covering paper, this presents a summary of carbon emissions performance from April 2008 to March 2014, based on all building carbon emissions where Moorfields is responsible for the procurement of energy.

The carbon target represents a 10% reduction in carbon emissions over the 5-years from the baseline year of 2008/09 to 2014/15; our performance at the end of the 4th year is shown below:

•Absolute carbon emissions have decreased by 1% from 5,456 tCO2 to 5,386 tCO2;

•Emissions from electricity have reducedby 3%, those from gas have increased by 2%;

•Emissions from City Road, the asset responsible for most carbon emissions, have decreased by 4%, whilst those from the RDCEC have increased by 21%.

The detailed report presents the energy efficiency measures delivered over the past 4 years, and demonstrates that the increase in patient activity has been delivered with minimal impact on our carbon emissions, i.e. our carbon emissions per patient have reduced by approximately 29%. This has been achieved despite the continuing growth in the intensity of use of the estate, both in terms of occupancy and extended working hours, additional diagnostic equipment, and the delivery of the new data centre in the RDCEC (a key component of our IT business continuity plans).

Based on the above information, we will not achieve the 10% saving in the final scheme year; however a key planned efficiency relating to voltage optimisation will have a significant impact on our emissions and may enable us to meet the target at the end of 2015/16. There are no financial consequences for not achieving the target, over and above the continued purchase of carbon allowances. The reputational impact of non-achievement should be minimised by our over-achievement in reducing emissions per patient, and the reality that the national performance lists are no longer published.

As participants in the Carbon Reduction Commitment we are required to purchase carbon allowances at £12 per tonne. We emitted 5,625 tonnes[1]in 2013/14 and this equates to £67,500 in allowance purchases –in line with planned expenditure and a saving of £2,700 against the previous year.

Carbon allowances will increase to £16.40per tonne for the 2014/15 scheme year, if we were to maintain our current emission levels this would equate to a cost £92,250.

Trust Board Recommendation

The Board is asked to note:

  1. The annual sustainability report andour current performance against the 10% target, in the context of additional patient activity and intensity of use.
  2. The underlying carbon emissionreduction of approximately 29% per patient.
  3. The further plans to improve energy efficiency through voltage optimisation.

Rob Elek

Director of Strategy & Business Development

1


2013/14 Sustainability Report

Annual Update

1


2013/14 Sustainability Report

Contents

Section/ChapterPage

Carbon Emissions - Performance

Carbon Emissions - Mitigation

Waste – Performance

Compliance

Carbon Emissions - Performance

This annual report provides a summary of carbon emissions performance from April 2008 to March 2014 based on all building carbon emissions where Moorfields Eye Hospital NHS Foundation Trust is responsible for the procurement of energy.

This includes the following sites:

•Moorfields Eye Hospital, City Road;

•Moorfields Pharmaceutical;

•Richard Desmond Children’s Eye Centre;

•Ebenezer Street;

•Provost Street;

•8 Wimpole Street;

•Arthur Steele Unit;

•St Anne’s.

The key messages from this report are highlighted below:

Detailed explanation of these results is provided over the following pages.

1.1Absolute Carbon Emissions

Absolute carbon emissions refer to the total amount of carbon emitted through the consumption of energy across all buildings where Moorfields Eye Hospital NHS Foundation Trust is responsible for the procurement of energy. The reason why carbon emissions are measured on this basis is that this directly links to the requirements of the Carbon Reduction Commitment legislation (see

Compliance Section) as well as NHS Sustainable Development Unit and Climate Change Act targets.

In order to calculate carbon emissions, Moorfields utilises industry standards including the Greenhouse Gas Protocol and DEFRA Guidance to report emissions from scope 1, 2 and 3 sources. These reporting scopes are explained below:

Scope 1 emissions: direct greenhouse gas emissions occurring from sources owned or controlled by the Trust. For example the combustion of natural gas in boilers;

Scope 2 emissions: greenhouse gas emissions from the off-site generation of grid electricity;

Scope 3 emissions: all other indirect emissions, which are the consequence of the Trust’s activities but occur from sources not owned or operated by the Trust. For example grid loses from the transportation and distribution of electricity.

In order to contribute towards national carbon mitigation targets set by both Government and the NHS Sustainable Development Unit, Moorfields has set the following carbon reduction target:

Moorfields Eye Hospital NHS Foundation Trust will reduce absolute carbon emissions by 10% by the end of financial year 2014/15 based on a 2008/09 baseline.

The following figures and tables illustrate the Trust’s progress to date:

As the figure and table above demonstrate, absolute carbon emissions have decreased from 5,456tCO2 to 5,386tCO2 (1%) when comparing 2008/09 with the same period in 2013/14. This therefore shows that, at present, Moorfields is not on track to achieve its carbon emissions target.

The relatively small reduction has been achieved primarily due to a 3% reduction in electricity consumption. In contrast, carbon emissions from the combustion of natural gas have increased 2%.

In the half year Sustainability Report, emissions were reported as 8% below the April-September 2008 baseline level. This was encouraging and suggested that the carbon emissions reduction target would be achieved. However, it was noted at the time that emissions were expected to increase during the remainder of the year as the Combined Heat and Power (CHP) engines were switched off to undergo maintenance. Whilst this led to the slight benefit of reducing natural gas consumption, electricity consumption increased markedly. This can be clearly seen in the figure below, where from February to early April an increase in average daily half hourly electricity consumption can be seen. From early April electricity consumption returned to normal operating levels. It is expected that this should continue for the rest of the year.

By using the CHP consumption figures for the same time period in 2012/13 it can be calculated that a 6.4% saving would have been achieved when comparing 2008/09 with 2013/4. This would have put the Trust far closer to the reduction target going in to the last year of the target period.

(a)Carbon emissions by asset

These demonstrate that Moorfields Eye Hospital, City Road was responsible for 66% of total building emissions during 2013/14 and is therefore the largest contributor to the absolute carbon footprint. Emissions at this asset have decreased 4% when comparing 2008/09 and 2013/14. A number of energy efficiency measures have been implemented at this site over the past 2 years which have contributed to reduction in emissions here. See the “Carbon Emissions - Mitigation” section for further details. It is expected that this reduction will increase over the next financial year as the CHP engine has returned to normal operating levels.

Moorfields Pharmaceutical is the second largest emitter of carbon in the Trust’s estate portfolio. The second figure illustrates that carbon emissions have remained broadly similar over the past 6 years with a relatively minor 0.4% decrease when comparing 2008/09 and 2013/14.

Following the installation of a data centre and associated plant (including a new chiller) at the Richard Desmond Eye Centre, carbon emissions increased 21%. However, no further major mechanical and electrical system installations are planned for this site in the near future. If emissions had remained static at this asset, a 3% reduction target across the whole organisation would be achieved when comparing absolute emissions between 2008/09 and 2013/14.

1.2Relative Carbon Emissions

Relative carbon emissions are used to understand how Moorfields Eye Hospital NHS Foundation Trust emits carbon relative to its functions as a specialist healthcare organisation. To do this absolute carbon emissions are scrutinized against two intensity factors, £million revenue and patient activity numbers, in order to understand how carbon emissions change as business functions change.

Relative carbon emissions Apr-Sep 2008 to Apr –Sep 2013 - £million revenue

Relative carbon emissions Apr-Sep 2008 to Apr-Sep 2013 – patient activity

These figures both demonstrate that despite substantial increases in £million revenue and patient activity numbers, relative carbon emissions have decreased by 35% and 23% respectively. This therefore illustrates that the Trust is operating in a more energy efficient manner.

The principle reason that absolute carbon emissions have not reduced more over the past 6 years is that the Trust’s business activities, as highlighted above, have rapidly increased.

For example, patient activity has grown by 29% when comparing 2008/09 and 2013/14. This in turn has resulted in increased carbon emissions as increased patient demand has driven increased energy consumption. Any savings made through energy conservation measure projects have been partly negated as a result of this.

If patient carbon intensities had remained at the same rate as 2008/09, absolute carbon emissions in 2013/14 would have been 7,020 tCO2. When comparing this figure with the actual performance of 5,386 tCO2 in 2013/14 it can be inferred that carbon mitigation measures have resulted in the avoidance of 1,634 tCO2, a 29%reduction.

Carbon Emissions - Mitigation

Previously the status of installed energy efficiency measures was provided verbally by the Maintenance Manager. However, the Energy Engineer is now in the process of undertaking detailed surveys of previous energy saving measures and providing full reports on each activity to both confirm level of savings achieved as well as highlighting any potential future opportunities.

Future planned activities are shown below.

It is anticipated that these actions should ensure the required reduction in absolute carbon emissions, assuming no changes to business functions e.g. an increase in patient activity numbers or the installation of energy intensive equipment. A further detailed analysis will be provided over the coming months.

Past Energy Efficiency Measures – 2010 to Present

Ref / Energy saving projects / Capital Cost / Annual Cost Saving / Anticipated Energy Saving (kWh) / Carbon Saving (tCO2) / Status / Comment
1 / Upgrade lighting as part of outpatients refurbishment / £ 134,311 / £ 11,090 / 123,211 / 67 / Complete
August 2010
Medical Records & A&E / The A and E department has had a full LED re fit when this area was upgraded
2 / Full review of previous energy related projects / £ 36,894 / £ 19,000 / 190,000 / 104 / Complete
March 2011
3 / Installation of Variable Speed Drives on the Air Handling Units (AHU) / £ 36,894 / £ 19,000 / 190,000 / 104 / Complete
March 2011 / At present set manually to one speed. No evidence of auto speed adjustments
4 / Insulation of exposed pipework. / £ 4,995 / £ 4,301 / 108,000 / 20 / Complete
May 2011 / Some areas outstanding e.g. steam pipes near Estates Offices. This has been complete. Early 2013
5 / A&E Ventilation Plant improvement - BMS Controls / £ - / £ 5,200 / 54,000 / 28 / Complete
October 2011 / All the controls have been fine-tuned during the service. Fire dampers have been installed and tested.
6 / Installation of Inverters on Constant Temperature Pump / £ 57,828 / £ 26,600 / 650,000 / 120 / Complete
November 2011 / A Control strategy has now been applied to schedule the running speed of these inverters with the outdoor air temperature. The speed of the inverter drives is now reduced to an average of 35 htz (70%) using this strategy compare to the manual adjustment method previously applied at 45 Htz (90%)
7 / Chiller switch off during Out of Hours and increased use of free cooling - BMS controls / £ - / £ 13,068 / 145,200 / 77 / Complete
January 2012 / This will be within 2014.
8 / Insulation of Clean Steam Generators / £ 3,410 / £ 3,187 / 132,807 / 25 / Complete
February 2012 / The Steam Generators have been insulated Mid 2012
9 / Installation of Fan Coil Units in Cumberledge Ward Bedrooms and a Plate Heat Exchanger for bathroom heating / £ 57,828 / £ 26,600 / 650,000 / 120 / Complete
June 2012 / FCU’s have been insulated in the Cumberledge ward Mid 2012
10 / HVAC Controls -Feasibility study to reduce run times, adjust set points and review service planning for AHUs / £ - / TBC / TBC / TBC / Complete
October 2013 / Feasibility complete, evidence available and new schedules applied.
Savings to be confirmed by Energy Engineer
11 / Primary Plant Controls - Feasibility study to adjust primary plant run times in order to reduce working loads whilst maintaining current operating conditions / £ - / TBC / TBC / TBC / Complete
October 2013 / Feasibility complete, evidence available and new schedules applied.
Savings to be confirmed by Energy Engineer
12 / Installation of controls to valve across two chillers to allow the set back of the day chiller at night. / £ 1750 / TBC / TBC / TBC / Complete
October 2013 / Introduction
Both of the Chiller machines on the LG floor at 163 City are running 24/7. The reason for this is that there are no control strategies to ensure that the Moorefield’s Pharmacy is kept to an appropriate temperature for the storage of the Drugs and other medical products.
13 / Combined Heat and Power (CHP) Projects / £ 5,600 / £ 15,000 / 375,000 / 205 / Part Complete
Energy Engineer to ensure data points are operational / Energy meters installed.
CHPs linked to BMS.
Infrastructure and contract complete for selling excess energy to the grid.
Total / £ 337,760 / £ 143,046 / 2,618,218 / 870

Current Energy Efficiency Measures

Ref / Energy saving projects / Project Description / Status
1 / Implementation of Energy Books / A building specific dashboard for energy audits, carbon savings and cost savings is being developed to support business cases for future energy saving measures. These will be used to inform the Sustainability Steering Group. / Near Completion
Some final fine tuning required
2 / Energy audits / Undertake a full detailed survey of previous energy related projects to ensure accuracy of completion, kWh reductions and submit reports to the Estates Director for review. / In Progress
3 / LED Lighting Rollout / Continued replacement of existing lighting with LED equivalents where suitable. / In Progress
Survey completed for lighting options to the Lower Ground.
4 / HVAC Controls / Tuning of AHU control loops to make plant operations more efficient. Checking of all AHU's to ensure correct operation of fresh air and recirculation dampers for free heating and cooling. / In Progress
5 / Voltage Optimisation / Installation of Voltage Optimisation equipment as part of ongoing energy efficiency measures / In Progress
See Case Study. This process has been initiated under the ESPO Framework.

Waste – Performance

The table below gives an overview of our waste volumes and segregations percentages.

Facilities previously benchmarked Moorfields with all NHS hospitals across the UK using the ERIC data for 2012 – 2013. The data showed that Moorfields were currently placed 38 out of 294 hospitals with regards to the percentage of waste being diverted from Landfill.

Waste volumes – April 2013 to March 2014

Whilst we are placed 38 within the UK out of 294 hospitals there are other considerations that need to be understood. A large percentage of the other 37 Hospitals incinerate most of their waste. This is not the best disposal route as stated by the EA with the waste hierarchy. If we take the incineration process into consideration then we would indicatively be place within the top ten hospitals within the UK on waste performance. Please note that this information was benchmarked against 2012 – 2013 as the most current ERIC reports have not been released online as of yet.

Compliance

Carbon Reduction Commitment

As participants in the Carbon Reduction Commitment Moorfields Eye Hospital NHS Foundation Trust is required to measure, monitor and disclose carbon emissions from all electricity and certain gas supplies to the Environment Agency where the Trust is responsible for the procurement of energy. When carbon emissions have been ascertained, an allowance for each tonne of carbon must be purchased and surrendered at a cost of £12/tonne. This cost is due to increase to £16.4 for the next scheme year (2014/15).

During the 2013/14 period 5,625tonnes of carbon covered by the scheme have been emitted. This equates to £67,500 in allowance purchases. When compared to the previous scheme year, emissions covered by the CRC have reduced by 225tonnes. This represents a saving of £2,700 in reduced allowance purchase requirements.

(a)Carbon Reduction Commitment – External Audit

In order to avoid financial penalties associated with noncompliance, an external audit has been carried out covering Moorfields participation in the first four years of the scheme. Following this audit, where participation was independently checked and assured, the Trust can confirm that it is compliant in all areas of the scheme including areas of best practice.

Display Energy Certificates

Buildings occupied by a public authority where the total useful floor area of the building exceeds 500m2, and which is frequently visited by the public, are legally required to have a Display Energy Certificate (DEC). The aim of these are to provide an energy rating of a building from A to G, where A is very efficient and G is the least efficient based on the amount of metered energy used by the building. These must be updated on an annual basis.

At present Moorfields is required to have two Display Energy Certificates - one for Moorfields Eye Hospital, City Road, the other for the Richard Desmond Eye Centre. The most recent Display Energy Certificates are shown below. Despite each A-G rating remaining the same as previous certificates, Moorfields Eye Hospital, City Road has shown an improvement with a score of 132 as opposed to 136 in the previous year. In contrast, performance at the Richard Desmond Eye Centre, for reasons mentioned in the “Carbon Emissions - Performance” Section, has slipped with a score of 113 compared to 106 last year.