Trans Lex Work Ltd.

MAIN REFERENCES

/2014. June/

Table of Content

I. Main contracting, construction

II. Reconstruction works

III. Repairs, maintenance, execution, operation

IV. Expert consultancy, technical diagnostic survey, requirement-systems, design

V. Development of quality assurance system and company images management consultancy

VI. Rotating machine diagnostic, vibration diagnostic

VII. Operating and start up of plants

VIII. Repair of concrete constructions

IX. Tank inspections and reconstructions

XI. Trade

I. Main contracting, construction

COLUMBIAN TISZAI KOROMGYÁRTÓ Kft.

2007-2008

  • Planning, building and operation of a 10 MW capacity tail gas fired power plant as a main contracting.

NITROGÉNMŰVEK ZRt.

2006-2007

New acid plant investment

  • Building, gearing of three pcs. of 2000 m3 acid bins; configuration of the new pipeline system (consortional partner: Vegyépszer ZRt.)
  • Complete overhaul of warehouse, installation of material mover conveyor for loose fertiliser.

2010

  • Disassembly of the2C Acid Plant and dissociation of its non-sold parts

2013

  • Reformer furnace rewamp, capacity upgrade

TVK NyRt.

2007-2008

  • Complete reconstruction of a tubular bridge pipe network (4th. stage of the reconstruction).

EVONIK-AGROFERM Co. / Kaba

2010-2011

  • Cooling water system modification with the implementation of new built cooling towers and compressor building for 2 pcs. Trane chillers

DUNAMENTI ERŐMŰ Zrt.

2013

  • DN2800 pipe reconstruction and modification in a length of 120 m

INOTAL Alumíniumfeldolgozó Zrt.

2013

  • Planning and implementation of the cooling system of an aluminium coarse wire line

II. Reconstruction works

Bandar Imam Petrochemical Co.,Iran

1992-1994

Post-war reconstruction works (technical diagnostic survey and construction):

  • 100 kt/y LDPE plant of very high (3000 bar) operating pressure
  • 50 kt/y HDPE plant
  • 50 kt/y polypropylene plant.

Partners: Tecnimont S.p.A. Milano and Belleli S.p.A Mantova, Italy

National Petrochemical Public Co. Ltd., Thailand

1993

  • Technical consultancy on the reconstruction of steam cracker furnaces.

MOL Nyrt. (Hungarian Oil and Gas Co.) Exploration & Production Division / Szeged Plant

1996-2000

  • Upgrade and reconstruction along with foundation repair of nine pcs. reciprocating compressor aggregates. Partner: Alphatec Mérnökiroda Kft. (Alphatec Engineering Bureau Ltd.)
  • MARKER, Storage and Transportation Unit, Dabas Plans for the revamp of metering and calibration station.
  • Technical consultancy provided for the reconstruction project of unit "D-E".
  • Rewamp of tubular furnaces IV-P-1/E and IV-P-2/E in gas preparation unit “E”.

TVK Nyrt. (Tisza Chemical Combine Co.)

2000-2008

  • Engineering examination of tubular bridge pipe network system, making an expert opinion and suggestion, complete the first item of reconstruction.(Data: total pipe network system: 7,7 km; total length of pipe: 229 km; No. of pipe supports: 33800 pcs; No. of valves: 1600 pcs.)
  • Water Plant reconstuction of C-851 and E-901 cooling towers.

EVONIK-AGROFERM Zrt.

2012

  • Partial reconstruction of a tubular bridge pipe network (1th. stage of the reconstruction).

III. Repairs, maintenance, execution, operation

Nitrogénművek Zrt. (Nitrogen Works Co., Pét)

1995-2014

  • Ammonia Plant: Replacement of primary cracking furnace’s tubing and reconstruction of walling (supported by computer based network management).
  • Acid Plant:Replacement of refractory internal lining of hot-gas duct between reactor and turbine at four units.
  • Dilute Acid Plant / Quench Boilers Position 7.:Design, approval of workshop design by the authorities and construction of 2 pcs. boilers.
  • Ammonia Plant:Modification and construction of alkali distributing system of towers 102 E A/B.
  • Overhaul of turbine compressor and generator units.
  • Full-scale overhaul of recirculatory cooling water tower typ. CT-I.
  • Ammonium plant overhaul of 2 pcs. turbine compressors and 2 pcs. SIEMENS steam turbines.
  • Ammonium plant examination and reparation of the decoupling pipes
  • Conzervation of 103 JT KP and 105 JT steam turbine rotatiting parts

Debreceni Vízmű Zrt.

1995-2014

  • Continuous service of turbo blowers and centrifuges.

Miskolci Vízmű Zrt.

1995-2014

  • Continuous service of turbo blowers and centrifuges.
  • Repair of HV turbo compressor and motor

MOL Nyrt. (Hungarian Oil and Gas Co.)

1996-2000

  • Exploration & Production Division / Szeged Plant:Complete renewal of water distribution system and knock-out drums at evaporation condensers.
  • Gas Preparation Unit “EE”: Renewal of tubular furnaces IV-P-1/EE and IV-P-2/EE.
  • Turbocharger repair for Waukesha 7042 GL type gas turbines on an ongoing basis.Repair of main collector’s heat exchanger tube bundles.
  • Water Feedback System: Repair of pumps N° 9 and 10 (type CNSZ 180-1900), and pre-operational revision, commissioning and modification of a CNSZ 18-950 type pump previously stored in warehouse.
  • Renewal with guaranty of sliding bearings.
  • Repair of 1000 m3tank N° 2900-3 at the main collector.
  • Production of reciprocating compressors’ spray catcher.
  • “NF” Plant: Modification of gas engine’s (typ. Waukesha 7042 GL) cooling water system of compressors K-724, K-726, K-728
  • Boiler room “C”- Expert examination (age limit determination) and preparation for authorithy structure examination of typ. 3HO 10/12 (3 pcs) and type GIB 20/12 (2 pcs) steam boilers.

LINDE GÁZ MAGYARORSZÁG Zrt. (Linde Gas Hungary Co. / Kazincbarcika)

2001-2014

  • Supervision and repairing of acetylene reciprocating compressors (2 pcs).
  • Revision of DEMAG Oxigen and Nitrogen compressors.
  • Overhaul of TA-18 and TA-28 JOY air compressors.
  • Continuous revision of DEMAG Oxygen and Nitrogen compressors.
  • Resetting a PM 1371 B and a P1474 BA charging pump.
  • Implementation of the Free Floating Piston Technology (FFPTM) into C-1408 NEA CO2 reciprocating compressor.
  • Dnepropetrovsk, vibration diagnostics, intallation of shaft movement sensor, taking part at the overhaul.
  • Repair of acethilen reactor
  • HYCO-1 plant pipe system scheduled supervision
  • Construction and diagnostics examination at HYCO-2 plant during shut-down.
  • Continuous repair or H2 and Acetilen compressors
  • Jerez de la Frontera, Spain„ a complete overhauling of the two JOY TA-18 compressors

House of Parliament (Budapest)

1996

  • Boiler Plant:Overhaul and reconstruction of 40,2 m tall brickset chimney. Partner: VEGYÉPSZER Co.

EVONIK-AGROFERM Co. / Kaba

2001-2014

  • Improvement of UNOZAWA blower type 317 B.
  • Improvement of compressor techn. mark 501 A type 3GR 250/430, and its parts epicyclic train and electromotor.
  • Preparation of a lid of a 501B turbo-compressor circulating gear box.
  • Repair of 230 A-1 and 230 B-1 CICLO gear
  • Repair the load control system of the 501/B turbo-compressor
  • Complete overhaul of the 501/B turbo-compressor

BorsodChem Zrt. / Kazincbarcika:

1998-2007

  • Modification of PVC-reactors.
  • Adjustment of two pcs. of PGW compressors at the Chlor Plant

TVK Nyrt. (Tisza Chemical Combine Co.)

2000-2014

  • Compensation of acetylene charger reciprocating compressor No. V.
  • Mechanical renovation of a HTV-700 recirculational cooling tower.
  • LDPE2 sack packer dismantling and relocation of PP4 sack packer.
  • Maintenance of 9 pcs DN600 valves at PP-IV Cooling tower No.10.

GE Hungary Co./ Hajdúböszörmény

2001-2012

  • Reparation of different types of pumps and fans, and vibration diagnostical examinations.
  • Renovation and reparation of 12 fans.

Holcim Hungária Rt./Kalcinátor Kft./CARMEUSE HUNGÁRIA Kft. / Hejőcsaba Calcicplant

2001-2011

  • Production and location of a roller crusher + jig-shaken tray with a capacity of 50 t/hour, Beremend
  • Repair of various rotating machines.
  • Blower installation.
  • Continuous repair and maintenance of compressors, dust collectors, blowers, generators, engines.
  • Replacement of the fossil flour mill’s drift work.

FCI Connectors Hungary Ltd./ Tatabánya

2001-2002

  • Complex control, operate and maintenance of service systems and equipment in the workshop hall & office complex of FCI.
  • Local maintenance of power-current electric equipment in the workshop hall.

MIFROVIT Miskolci Hűtőipari Co. / Miskolc

2001

  • Supervision and repairing of screw compressor.

ICN Magyarország Rt.

2001

  • Chemical Plant I. Renewal of crude morphine production line during the yearly overhaul.

TAGHLEEF INDUSTRIES KFT. (previously RADICIFILM Hungary Kft.

2002-2014

  • Daily mechanical maintenance of the biafol film production lines in the scope of service-contract.

2010

  • Reparation of a blower type RP 3

Columbian Tiszai Koromgyártó Kft.(Columbian TiszaiCarbon Manufacturing Ltd.)

2002-2014

  • Construction of a 10MW Tail-gas fired power plant as a turn-key project.
  • Daily maintenance of rotating machines in the scope of service-contract.
  • Overhaul of 2 pieces Rotary-dryer unit.
  • Purging and technical survey of 3000 m3 quenchoil tank.
  • Replace the bottom-sheet of a 3000 m3 quenchoil tank.
  • Reparation of a side-shaker fitted to a 10000 m3quenchoil tank
  • Reconstruction of a rotary –dryer unit at Tread 2B row
  • Exhaust gas utilizing turbine’s supervision.
  • Reparation of Carcas raw –rotor padded dryer.
  • Tread 2A raw- rotor padded dryer repairs.
  • Tread 2B raw- rotor padded dryer repairs.
  • General overhaul of blowers and fans.

CHINOIN Co.

2002

  • Production of a 3,15m3 acid-resistant extractor and it’s local settlement, and renewing the driver and stuffing box locking fluid system.

Debreceni Erőmű Co.(Power Plant of Debrecen)

2002-2003

  • Yearly revision of a 7,1 MW performance steam-generator machine group.

1996-2011

•Regular overhaul of HV turbo blowers

•Regular examination of CP3 centrifuges

Karpatnefotohim, Kalush – Ukraine

2004-2011

  • Rotary part changed overhaul of T5806, T5807 and T5808 SIEMENS produced steam turbines at plant shutdowns; vibration diagnostics measurements.

2011

•Examination of the pipelines’ inner welding seams with endoscope

AES-II Tiszai Erőmű Ltd.(AES-II Tiszai Power Plant Ltd.)

2002

  • Reparation and enlarging of the instrument air system.

Mátra Power Plant Zrt.

2002-2008

  • Repair of NA 1000-1200 closing valves, repair of NA 250 equipments.
  • Maintenance of 2 items of NA 1600 slam type lock (U 128, U 129) at the 3rd block.

2004-2014

•Regular maintenance of ringed and stucked locks

EASTERN Sugar Co./Kaba

2002-2005

  • Renovation and reparation of DRESSER and GROH Type blowers.
  • Technical survey and rotor overhaul of No. 29. and No. 30 steam turbines.

Nyíregyházi Erőmű Co.(Power Plant Nyíregyháza Co.)

2002-2003

  • Reparation of a 11,2 MW performance steam-turbine/generator unit.

Szelence Ltd.

2003

  • Reparation of EVM 200/540-II type vacuum pump.

Paksi Atomerőmű Zrt.(Nuclear Power Station Co. / Paks)

2003-2014

  • Reparation of filter fillings of generator’s bearing oil.
  • Designing, manufacturing repairing of filter fillings of generator’s bearing oil.

2010-2012

  • Presentation of pecific manufactured hydraulic pipes
  • Examination of regulator valves’ maintenance that are in operation at generator’s aid-plant oil system

MONDI BP Zrt. (previously NEUSIDLER ZRt.)

2001-2007

  • Reparation of pump Nr. DC 200/400 M.
  • Technical survey and overhaul of 5,2 MW steamturbine-generatorunit.
  • Vibration diagnostics and regulator cleaning of an 5,2 MW stematurbine.
  • Preparation of a PM 8 type paper production line.
  • Preparation of 21 pump, fitting duocone seals.

Synergy Kft.

2007

  • Pumps repairs.

TRANS SPED (DTT) Kft.

2009-2014

  • Reparation of a blower type C 561 B
  • Reparation of a blower type C 901 D
  • Service of compressors type PK 902 B-D

VÍZ- ÉS CSATORNAMŰVEK KONCESSZIÓS Zrt.

2010

  • Maintenance of a blower type XLP 310

BUDAPESTI ERŐMŰ ZRT.

2009

  • Kispesti Erőmű- revision of a Siemens steam turbine, disassembly and reassembly of a Flender engine; maintenance of several fittings, valves and electric engines
  • Újpesti Erőmű- revision of an Alstom steam turbine; maintenance of several fittings, valves and electrical engines

2010-2014

  • Revision of the steam turbines manufactured by Siemens; maintenance of several fittings, valves and electric engines at Kispest, Újpest and Kelenföld areas.

AKZO NOBEL COATINGS ZRT.

2009

  • Planning, manufacturing and replacement of colour convertertanks No. 30/17 and 30/18, conversion of pipeline joinings, trace changing

FŐVÁROSI CSATORNÁZÁSI MŰVEK ZRT.

2010-2012

•Maintenance of several equipments that operate at the Northern-Budapest Wastewater Cleaning biogas plant

FŐVÁROSI KÖZTERÜLET FENNTARTÓ ZRT.

2011

  • Reparation of damaged tubular bridge of the garbage recovery plant, material purchasing.

IV. Expert consultancy, technical diagnostic survey, requirement-systems, design

MOL Rt. (Hungarian Oil and Gas Co.)

1994-2001

  • Exploration & Production Division / Szeged Plant / Gas Preparation Unit “E”: Technical diagnostic survey of mechanical equipment (pressure vessels, rotating machines, pipelines, safety valves, ferro-concrete foundations, high-temperature insulations, steel constructions). All data were captured, processed and presented in a computer based data processing system (GRAFOSZ 1.0). Project preparation and implementation were supported by computer based network management and resource.
  • Exploration & Production Division / Szeged Plant: Working out of requirement-system for contracts concerning construction and servicing.Elaboration of “Technical Requirements” for contracts regarding construction and service suppliers.
  • Exploration & Production Division / Gas and Oil Transport Department: Review of Maintenance Technology Approach and Maintenance Technology Instructions.
  • Exploration & Production Division / Szeged Plant / Gas Preparation Unit: Technical diagnostic survey of 4 tubular furnaces.
  • Exploration & Production Division / Szeged Plant/ Gas Preparation Unit: Design activity:
  • Detailed design of amendments required by trial run of H2S removal facility.
  • Detailed design of modified piping between facilities H2S removal and KÖGÜ, enabling further coupling of there facilities.
  • Detailed design for erection of the main pumps "MOYNO 9H065G1 SSO-XDBB" of the H2S removal facility.
  • Exploration & Production Division / Szeged Plant / Hydrogen Sulphide Removal Facility LO-CAT II:Technical inspection and qualification. Partner: Tecnimont S.p.A Milano, Italy
  • Exploration & Production Division / Szeged Plant:Technical requirements' system relating to perforation prevention in carbon steel underground pipes transporting hydrocarbon. Technical requirements' system relating to perforation prevention in synthetic pipes transporting water.
  • Szeged Plant / Storage Tank Farm F-10:Technical survey of AUDCO ROCKWELL armatures, specification of repair technology, cost estimation and finally performing domestic overhaul of the armatures (100 pcs).
  • Exploration & Production Division / Kiskunhalas Plant / Engineering Co-ordination: Development and continuous operating of Computer Aided Maintenance System
  • Exploration & Production Division / Szeged Plant: Technical evaluation of the wellhead armature’s failure at the gas well ALG 1001.
  • Exploration & Production Division / Szeged Plant: Survey of 21 well pipehead armatures.
  • Exploration & Production Division / Szeged Plant/ Gas Preparation Unit: Detailed design of exchanger’s header II-T-1.
  • Exploration & Production Division / Szeged Plant:Expert's opinion relating to supplement of missing quality assurance documents for appliances.Elaboration of expert’s report for replacement of armatures’ quality statement documents.
  • Exploration & Production Division / Szeged Plant: Elaboration of expert’s report to solve operational problems of heat exchangers H09 and H12 of main collector.
  • Exploration & Production Division / Szeged Plant/ StorageTank Farm E-10: Development of painting technology and related economical analysis for spherical product containers.
  • Exploration & Production Division / Szeged Plant: Examination of technical problems of reciprocating gas compressor.
  • Exploration & Production Division / Szeged Plant: Examination of performance reciprocating compressor driven by gas engine.
  • Expert examination of dewaxing lubricator pipes, substitution of the missing documentation, complete of the necessary repairs.
  • Exploration & Production Division / Szeged Plant / Pressure Booster Plant: Definition of pressure pulsation in the pipeline system of compressor K-711.
  • Exploration & Production Division / Szeged Plant: Study about the modification of K-701 gas engine pipeline.
  • Exploration & Production Division / Szeged Plant / “NF” Plant: Study about modernisation of ignition system of Ganz gas engines (14 pcs) type 18PA4V185GE-C.
  • Exploration & Production Division / Szeged Plant: Register and structural examination of atmospheric storage tanks of inflammable fluids, fusions and intoxicants, substitution of the essential documentation.
  • Exploration & Production Division / Szeged Plant: Expert opinion about T-9 oil line’s failure of oil well Sze 28.
  • Szeged Plant : “15 years expert opinion” of tank park 400 m3ball tank No. „E-10” marked 401.
  • Overhaul of DRESSER-CLARK compressor gas-engine units type HMB10, emission reduction of gas engine.
  • Refining, Supervision of stoker for safe operating, Százhalombatta.

MOL Rt. (Hungarian Oil and Gas Co.)

2013-2014

  • MMM pilot project inspection at MOL

TVK Nyrt. (Tisza Chemical Combine Co.) / Tiszaújváros:

1995-2013

  • Technical diagnostic survey of the idle PolypropylenePlantI.; technical and economical investigation and in-depth study on relocation of this plant to other country. Partner: Tecnimont S.p.A. Milano, Italy.
  • Examination of HAMON cooling towers (2 pcs).
  • Complete mechanical planning of a tubular bridge pipe network.
  • LDPE-2 plant pipes examination with MMM method.

RICHTER GEDEON Vegyészeti Gyár Rt.(Richter Gedeon Chemical Works Co.) / Budapest

1997-1999

  • Inspection and review of processing plant’s ventilator system (design).
  • Complete planning of technical store and fireguard basis.

PAKSI ATOMERŐMŰ Zrt.(Nuclear Power Plant PAKS)

2008-2012

  • Preparing a technical expert survey about the chechking, maintaining, replacing of fire-stop valves.
  • Paksi Atomerőmű Zrt maintenance works and supervisions (repairs and replacements) – system’s converting in accordance with ASME-standards.
  • Part E: contrasting the practice of maintenance works and supervisions with the specifications of the ASME XI and ASME OM volumes.
  • Making pneumatic-operated quick valve maintenance procedure suitable to the ASME standards.
  • Preparing an expert survey in the topic of appliance, supervision, maintenance and replacement of safety fittings inhibiting ignition impact’s spread in the system of hydrogen.
  • Complex investigation of generators’ auxiliary oil system.

Nitrogénművek Zrt. (Nitrogen Works Co., Pét)

1997

  • Nitrogen Fertiliser Plant:Design activity for debottlenecking project.
  • Urea Plant:Design of new adsorber and modification of exiting reactor.

DUNASTYR Co. / Százhalombatta

1997-2004

  • Expert survey and evaluation of the possible causes leading to heavy damage of a 600 m3 pellet silo.
  • Storage hall capacity enlargement study.
  • Examination of the damage silo with special 3D laser scanning technology, making an expert proposal.

GEOINFORM Co. / Szolnok

1998

  • Expert’s report and structural inspection of BSB mobile measuring separator of 100 bar authorized pressure.

FCI Connectors Hungary Ltd.

200-2001

  • Performance of technical supervision during the construction of the new workshop hall & office complex of FCI.
  • Tatabánya: Development of closed cooling water system.

Bestfoods Hungary Ltd./UNILEVER HUNGARY Ltd.

2000-2002

  • Examination of boiler typ. TP-600/12-G and AKH-2/12, prepare for the official examination.
  • Expert opinion of blending room’s dust collector system.
  • Rákospalota , Röszke Plants: Maintenance organisation. (Total Productive Maintenance, CMMS settlement)

MIFROVIT Miskolci Hűtőipari Rt. (MIFROVIT Refrigerating Industry Co.)/Miskolc

2001

  • Examination of cooling reciprocating compressors’ principal axis.

Kabai Cukorgyár Rt.(Sugar Mill Co) / Kaba

2001

  • Noise-reducing of reciprocating compressors (2 pcs) planning and construction.

EVONIK-AGROFERM Co.:

2002

  • Mechanical examination and reparation of a SZ70-1 234/A sliding spin.
  • Nádudvar Plant: Examination of the ammonia and sulphuric acid pipes, and sulphuric acid tank.

2012

  • Static examination of the tubular bridge pipe network
  • Complete examination of the tubular bridge pipe network according to 63/2004 GKM.

CHINOIN Co.

2002

  • Production planning of a 3,15 m3 large acid-resistance extractor.
  • Planning of the No.738 tank park. ( 6 of 20m3 and 3 of 50m3 acid-resistance tanks)

LINDE Gáz Magyarország Co.( Linde Gas Hungary Co.)

2002-2009

  • Expert Report about the examination of the C1161 and C1461 compressors in Kazincbarcika.
  • Expert Report about the vibration and greasing diagnostical examination of the C1608 and C1408 compressors in the Dunaújváros Plant.
  • Supervision and technical expert of masonry of the reformer furnace.
  • Kazincbarcika – Classification according to PED of pressure vessels, pipes, safety valves at ASU, HYCO-1 and HYCO-2 plants. Preparing of Control plan and Computer based documentation. Developing of „0” statement.
  • Make HAZOP analysis at the Gas bottle loader plant.
  • Mechanical examination of a reciprocating compressor with a FREE Floating Piston C-1408 produced by NEA.
  • Static and diagnostic examinations at HYCO-2 plant.

HOLCIM Hungária Co. (Hejőcsaba Lime Plant Co. / Miskolc)

2003

  • State examination of Maerz furnace’s chimney.

SLOVNAFT FCC Plant

2003

  • Examination report about failure of No. 13 B 101 steam turbine-air compressor unit on behalf of TÜV Rheinland InterCert.

Columbian Tiszai Koromgyár Kft.(Columbian Tiszai Carbon Manufacturing Ltd.)

2005-2011

  • Expert opinion of steam boiler technical condition, plant equipment works number: 6038.
  • Tail-gas plant Own frequency examination of a G71 gas turbine and related BASF generator aggregate with a final item method.
  • Expert opinion about the mechanical status of a 34-06-01 signed, 1000 m3 volumed storage tank.

2010-2014

  • Expert opinion about the technological status of a No.34-01-01, 10000 m3 volumed quenchoil tank.
  • Expert opinion about the A and B boiler, about the Tread 2A and 2B dryer technological status.
  • Replica examination of the Carcass line.
  • Expert opinion about the tubular bridge pipe network.

EBEPLAN Kft. Szombathely