HAROLD L. JACOB
Registered Welding Inspector R/40550 CSWIP3.1 38535
Associate Welding Engineer,PWS-JWES-08-1027-01
;
+63 921 850 2897,+63 927 789 4267
CURRICULUM VITAE
BRIEF EXPERIENCE
Over ten years in varied engineering practice involving metals fabrication and construction of Oil & Gas, Power, Chemical and Petrochemical plant with extensive experience in welding and steel fabrication industry for structural, piping, boiler components and process equipments, shutdown works & tie-ins. Familiar with internationally recognized codes and standards (ASME, AWS, API,ANSI, BS, JIS, ISO9000) and able to demonstrate understanding of structural, piping and equipment drawings, project and work procedures and QC inspection documents and procedures, welding details and welding procedures to ensure the fabrication / construction is performed in accordance with project specifications and standards.
RESPONSIBILITIES
- Inspection General oversight of the fabrication / construction activities from a quality and good construction practice, maintaining and verifying implementation of the project quality assurance program/plan at site
- Observe and report quality issues/concerns together with notification of contractors proposed actions during resolution of quality issues.
- Monitor Project Materials and consumables
- Monitor welding, preheat and fit-up practices and verify these activities are performed in accordance with project requirements
- Perform visual inspection of welder production work.
- Monitor welding cut outs and repairs
- Monitor dimensional control activities in the field
- Monitor NDT activities
- Monitor calibration and operating parameters of welding and NDT equipments
- Monitor and witnessing punch listing and line walk down inspections of piping systems
- Monitoring and witnessing of hydro and pneumatic test, water flushing activities of piping systems
- Monitor and witness of piping system reinstatement as per test package
- Monitor the Contractors QC team inspection activities to verify quality control is performed in accordance with project requirements
- Coordinate and manage information between Contractors QC inspection team and the Project Team
- Documentation
- Reviewing and statusing subcontractor or supplier quality document submittals (Quality Plans and Procedures, Inspection and Test Plans)
- Review and comment on documents generated
- Reviews the preparation, qualification of PQR & WPS
- Review of Material Certificates, Vendor documents in accordance with project requirements and specifications
- Safety
Health, Safety and Environmental (HSE) inductions and awareness programs were attended throughout my career involving in construction of Oil & Gas, Power and Petrochemical Plant, provided the understanding and knowledge required in implementing Project Safety Management System successfully and safely with concerns on environment.
PROFESSIONAL EXPERIENCE AND CAREER
TECNICAS REUNIDAS SA, construction ofmain auxiliary systems for utilities,offsites and external interconnections(Borouge 2) for Abu Dhabi Polymers Company Ltd ADNOC, for the second phase expansion project in Ruwais, Abu Dhabi, United Arab Emirates
December 3, 2008 – April 10, 2010
Construction of new process facilities includes: Storage, Fuel Gas System, Diesel Oil, Boiler Feed Water, Steam System, Condensate System, Chemicals System, Demineralised Water, Service & Potable Water System, Seawater Unit, Closed Loop Cooling Water, Instrument & Plant Air System, Nitrogen System, Firewater System, Flare & Blowdown, Drainage & Sewer, Effluent Treatment and Spent Caustic
SNAMPROGETTI SpA Eni,A Company of SAIPEM 3rd NGL (Natural Gas Liquefaction)
Train Projectfor GASCO – Abu Dhabi Gas Industries Ltd., Ruwais, Abu Dhabi, United Arab Emirates
May 23, 2006 – March 31, 2008
Construction of Main Rack Structures, Fractionation & Refrigeration Area, Steam & Utilities Area, Treatment Area, Sulfur Recovery Unit, HP & LP Flare Area, Four Miscellaneous BS7777 Butane and Propane Tanks and One Double Deck Floating Roof Pentane Tank, and Jetty Facilities
Babcock-Hitachi (Philippines) Incorporated,a subsidiary of Babcock Hitachi Kure Japan
San Roque, Bauan, Batangas, Philippines
February 11, 2002 - May 31, 2006
Construction / Fabrication of Power and Utility Boilers, Incinerator Boilers, Steam and Water Drums, Boiler Piping, Heat Recovery Steam Generators, Economizer, Superheater Tubes, Water & Steam Headers
First Philippine Balfour Beatty,3rd FloorBenpresBuilding, Exchange RoadCorner Meralco Ave., Pasig City, Philippines
Projects involved:
ILIJAN 1200 MW COMBINED CYCLE PLANT(Aquatech International, Ilijan,Batangas, Philippines)
May 2001 – August 2001
Construction of Water Treatment Plant Facility – skid mounted process equipments, high and low pressure pumps and chemical treatment equipments.
SAN LORENZO 500MW CCGT(Kaefer-Raco Engineering GmbH, Sta Rita, Batangas, Philippines)
May 2001 – October 2001
Construction of Air Intake and Exhaust System for a 500MW Combined Cycle Gas Turbine Plant
ILIJAN NPC NATURAL GAS PIPELINE (Ecco-Asia NACAP Joint Venture –EANJV, Ilijan/Tabangao, Batangas Philippines)
May 2001 – September 2001
Station Piping and Mechanical Works fabrication and erection
ArabianMetalProductsOrganizationJubailIndustrialCity, Kingdom of Saudi Arabia
January 1996 – May 1998
Fabrication and Erection of Steel Structures
Projects Involved:
Al-Yamamah Hunter Project Phase III (2,900 TONS) for Costain International Limited, Royal Saudi Naval Base, Jubail, Kingdom of Saudi Arabia
Ras Tanura Refinery Upgrade Project ( 3,000 TONS )for Saudi Shinwa Co., Limited – ARAMCO
NHT / CCR Platformer PlantJuaymah, Ras Tanura, Kingdom of Saudi Arabia
Ras Tanura Refinery Upgrade Project ( 5,000 TONS ) for Bugshan Stone & Webster Co., Limited – ARAMCO, Juaymah, Rastanura, Kingdom of Saudi Arabia
Flat Products Facility Project ( 1,600 TONS ) for Voest – Alpine Industrieanlagenbau
Saudi Iron and Steel Co. (HADEED)Jubail Al – Sinaiyah, Kingdom of Saudi Arabia
Ar – Razi Project IV ( 1,900 TONS )for Mitsubishi Heavy Industries Ltd. Saudi Methanol Company
Jubail Al – Sinaiyah, Kingdom of Saudi Arabia
EEI Corporation Construction DivisionTechnical Services Department,12 Manggahan St., Bagumbayan, Libis, Quezon City, Philippines
May 1993 – January 1996
Projects Involved:
STAR ( Shell Tabangao Asset Renewal ) ProjectKO14 Piping Systemfor Pilipinas Shell Petroleum Corporation – Refinery Division, Batangas, Philippines
Caltex Debottlenecking Project for Caltex Refining Division,Batangas, Philippines
Coal Fired Power Plant Project for Mitsubishi Heavy IndustriesQuezon, Philippines
PROFESSIONAL AFFILIATION
Associate Welding Engineer Certificate No: PWS-JWES-08-1027-01
CSWIP 3.1 Welding Inspector – Level 2 Certificate No. 38535
Registered Welding Inspector TWICL Certificate of Registration R/40550
Philippine Welding Society member I-08-1660
EDUCATIONAL BACKGROUND AND QUALIFICATION
The degree of Bachelor of Science in Mechanical Engineering (BSME) awarded in 1991by Bicol University, Legaspi City, the Philippines following five years full-time study.
TRAININGS AND SEMINARS ATTENDED
NDT Level II on RT(Radiographic Film Interpreter), MT, PT
Japan Welding EngineeringSociety Seminar (October 2008)
CSWIP 3.1 Welding Inspector-Level 2 Course (August 2008)
Project Management Seminar (December 2004)
Seminar on Welding Procedure Specification as per ASME IX Requirements (March 2005)
Total Quality Management (TQM) Orientation Seminar (September 1994)
Computer Application Packages and Computer Aided Drafting and Design (December 1992)
SKILLS
Proficient inthe use of Microsoft Windows applications software (Word, Excel, Powerpoint etc), ability to communicate effectively orally and in writing with others,ability to read andinterpret drawings and specifications and review and comment on documents generated.
CV / HAROLD L JACOB 1 OF 3