Trust Fund / Bond Agreement Summary ReportReported On : 07/29/2008
Trust Fund/Bond Summary Report - Financial Status Summary (Head Count)
Office Totals
Financial Statuses:California:Cambria:District Mining:Greensburg:Knox:Moshannon:Pottsville:Status Total:
Not Started21511134137
Bond Requested700301112
Partially Funded22021209
Fully Funded/Bonded1320111139168
Report Totals: 243722717163126
Trust Fund/Bond Summary Report - Bond Financial Status Summary (Total Bond Amount)
Office Totals
Financial Statuses:California:Cambria:District Mining:Greensburg:Knox:Moshannon:Pottsville:Status Total:
Not Started$0.00$11,200.00$0.00$0.00$0.00$0.00$0.00$11,200.00
Bond Requested$58,988,857.28$0.00$0.00$0.00$0.00$0.00$899,507.00$59,888,364.28
Partially Funded$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Fully Funded/Bonded$84,811,774.81$9,625,209.67$192,100.00$4,885,391.95$7,383,817.46$10,355,726.00$0.00$117,254,019.89
Report Totals: $143,800,632.09$9,636,409.67$192,100.00$4,885,391.95$7,383,817.46$10,355,726.00$899,507.00$177,153,584.17
Trust Fund/Bond Summary Report - Trust Fund Financial Status Summary (Total Trust Amount)
Office Totals
Financial Statuses:California:Cambria:District Mining:Greensburg:Knox:Moshannon:Pottsville:Status Total:
Not Started$0.00$21,352,610.27$0.00$3,263,744.90$0.00$1,392,940.00$605,663.25$26,614,958.42
Bond Requested$0.00$0.00$0.00$1,081,748.97$0.00$0.00$0.00$1,081,748.97
Partially Funded$20,896,548.00$3,418,843.00$0.00$2,701,012.00$9,353,170.00$1,372,050.00$0.00$37,741,623.00
Fully Funded/Bonded$0.00$5,466,134.18$0.00$33,733,590.34$832,040.27$12,269,384.28$55,933.59$52,357,082.66
Report Totals: $20,896,548.00$30,237,587.45$0.00$40,780,096.21$10,185,210.27$15,034,374.28$661,596.84$117,795,413.05
Page 1 of 56
Trust Fund/Bond Summary Report - Agreement Status Summary (Head Count)
Office Totals
Agreement Statuses:California:Cambria:District Mining:Greensburg:Knox:Moshannon:Pottsville:Status Total:
Data Collection12010206
Initial Calcs Cmpltd210610010
Negotiations Ongoing151613118
Agreement Reached560120115
Trust/Bond Finalized15231131311177
Report Totals: 243722717163126
Trust Fund/Bond Summary Report - Agreement Status Summary (Total Bond Amount)
Office Totals
Agreement Status:California:Cambria:District Mining:Greensburg:Knox:Moshannon:Pottsville:Status Total:
Data Collection$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Initial Calcs Cmpltd$9,947,371.84$0.00$0.00$0.00$0.00$0.00$0.00$9,947,371.84
Negotiations Ongoing$5,089,911.61$0.00$0.00$0.00$0.00$0.00$0.00$5,089,911.61
Agreement Reached$43,951,573.83$11,200.00$0.00$0.00$89,002.00$0.00$899,507.00$44,951,282.83
Trust/Bond Finalized$84,811,774.81$9,625,209.67$192,100.00$4,885,391.95$7,294,815.46$10,355,726.00$0.00$117,165,017.89
Report Totals: $143,800,632.09$9,636,409.67$192,100.00$4,885,391.95$7,383,817.46$10,355,726.00$899,507.00$177,153,584.17
Trust Fund/Bond Summary Report - Agreement Status Summary (Total Trust Amount)
Office Totals
Agreement Status:California:Cambria:District Mining:Greensburg:Knox:Moshannon:Pottsville:Status Total:
Data Collection$0.00$0.00$0.00$0.00$0.00$987,834.00$0.00$987,834.00
Initial Calcs Cmpltd$0.00$49,055.79$0.00$2,035,254.58$0.00$0.00$0.00$2,084,310.37
Negotiations Ongoing$0.00$17,251,623.15$0.00$1,018,691.29$0.00$405,106.00$605,663.25$19,281,083.69
Agreement Reached$0.00$3,798,223.27$0.00$1,291,548.00$0.00$0.00$0.00$5,089,771.27
Trust/Bond Finalized$20,896,548.00$9,138,685.24$0.00$36,434,602.34$10,185,210.27$13,641,434.28$55,933.59$90,352,413.72
Report Totals: $20,896,548.00$30,237,587.45$0.00$40,780,096.21$10,185,210.27$15,034,374.28$661,596.84$117,795,413.05
Page 2 of 56
Reported On : 07/29/2008
Trust Fund / Bond Agreement Summary Report - Detailed
Lead Office: California
Agreement Status: Trust/Bond FinalizedAgreement Consol/Harmar BondFinancial Fully Funded/Bonded
Base Costs:Present Capital Present Total Use
Value OMCost To Value AmountBond Or
# Of MPs:Annual O&M Capital Costs:ReCap Costs: CostConstructReCap Trust?
Permit #:Permit Name:Permit Status:TotalRawEstimated:Final:Estimated:Final:Estimated:Final:Cost
02891701HARMAR COAL CO./HARMAR Reclaimed/Chemical Treatment21$402,398$400,600$4,000,000$4,000,000$0$788,948Trust Fund Amounts:$9,183,195$788,948$4,000,000$13,972,143
MINE & WASHERBond
Bond Amounts:$16,558,525$4,000,000$788,948$21,347,473
Total for the Consol/Harmar BondAgreement: 121$402,398$400,600$4,000,000$4,000,000$0$788,948Total AmountTrust:Bond:Amount Trust:Bond:
Indicated:$13,972,142.96$21,347,472.91Used:$0.00$21,347,472.91
Agreement Status: Trust/Bond FinalizedAgreement Consol/Helvetia #1 CRDA BondFinancial Fully Funded/Bonded
Base Costs:Present Capital Present Total Use
Value OMCost To Value AmountBond Or
# Of MPs:Annual O&M Capital Costs:ReCap Costs: CostConstructReCap Trust?
Permit #:Permit Name:Permit Status:TotalRawEstimated:Final:Estimated:Final:Estimated:Final:Cost
32743710HELVETIA COAL CO/HELVETIA Reclaimed/Chemical Treatment00$0$9,100$0$0$0$19,000Trust Fund Amounts:$208,605$19,000$0$227,605
NO 1Bond
Bond Amounts:$376,142$0$22,133$398,276
Total for the Consol/Helvetia #1 CRDA BondAgreement: 100$0$9,100$0$0$0$19,000Total AmountTrust:Bond:Amount Trust:Bond:
Indicated:$227,604.78$398,275.57Used:$0.00$398,275.57
Agreement Status: Trust/Bond FinalizedAgreement Consol/Jane Mine BondFinancial Fully Funded/Bonded
Base Costs:Present Capital Present Total Use
Value OMCost To Value AmountBond Or
# Of MPs:Annual O&M Capital Costs:ReCap Costs: CostConstructReCap Trust?
Permit #:Permit Name:Permit Status:TotalRawEstimated:Final:Estimated:Final:Estimated:Final:Cost
03831305JANE MINEStage1/Regraded11$0$285,000$0$0$0$315,000Trust Fund Amounts:$6,533,227$315,000$0$6,848,227
Bond
Bond Amounts:$11,780,279$0$366,947$12,147,226
Total for the Consol/Jane Mine BondAgreement: 111$0$285,000$0$0$0$315,000Total AmountTrust:Bond:Amount Trust:Bond:
Indicated:$6,848,226.64$12,147,226.10Used:$0.00$12,147,226.10
Agreement Status: Trust/Bond FinalizedAgreement Consol/Keystone #1-Jane CRDA BondFinancial Fully Funded/Bonded
Base Costs:Present Capital Present Total Use
Value OMCost To Value AmountBond Or
# Of MPs:Annual O&M Capital Costs:ReCap Costs: CostConstructReCap Trust?
Permit #:Permit Name:Permit Status:TotalRawEstimated:Final:Estimated:Final:Estimated:Final:Cost
03813704JANE MINE - CRDAStage 2 Eligible00$6,600$0$0$0$1,340$0Trust Fund Amounts:$151,296$1,340$0$152,636
Bond
Bond Amounts:$262,692$0$1,553$264,245
Total for the Consol/Keystone #1-Jane CRDA BondAgreement: 100$6,600$0$0$0$1,340$0Total AmountTrust:Bond:Amount Trust:Bond:
Indicated:$152,635.77$264,244.93Used:$0.00$264,244.93
Page 3 of 56
Reported On : 07/29/2008
Trust Fund / Bond Agreement Summary Report - Detailed
Lead Office: California
Agreement Status: Trust/Bond FinalizedAgreement Consol/Lewisville Recovery BondFinancial Fully Funded/Bonded
Base Costs:Present Capital Present Total Use
Value OMCost To Value AmountBond Or
# Of MPs:Annual O&M Capital Costs:ReCap Costs: CostConstructReCap Trust?
Permit #:Permit Name:Permit Status:TotalRawEstimated:Final:Estimated:Final:Estimated:Final:Cost
32803712LEWISVILLE RECReclaimed/Chemical Treatment11$0$15,900$0$0$0$56,000Trust Fund Amounts:$364,485$56,000$0$420,485
Bond
Bond Amounts:$657,216$0$65,235$722,451
Total for the Consol/Lewisville Recovery BondAgreement: 111$0$15,900$0$0$0$56,000Total AmountTrust:Bond:Amount Trust:Bond:
Indicated:$420,485.28$722,450.65Used:$0.00$722,450.65
Agreement Status: Trust/Bond FinalizedAgreement Consol/Lucerne #6 BondFinancial Fully Funded/Bonded
Base Costs:Present Capital Present Total Use
Value OMCost To Value AmountBond Or
# Of MPs:Annual O&M Capital Costs:ReCap Costs: CostConstructReCap Trust?
Permit #:Permit Name:Permit Status:TotalRawEstimated:Final:Estimated:Final:Estimated:Final:Cost
32841303LUCERNE NO 6 DEEP MINEReclaimed/Chemical Treatment11$0$197,200$0$0$0$378,000Trust Fund Amounts:$4,520,534$378,000$0$4,898,534
Bond
Bond Amounts:$8,151,126$0$440,337$8,591,463
Total for the Consol/Lucerne #6 BondAgreement: 111$0$197,200$0$0$0$378,000Total AmountTrust:Bond:Amount Trust:Bond:
Indicated:$4,898,534.36$8,591,463.08Used:$0.00$8,591,463.08
Agreement Status: Trust/Bond FinalizedAgreement Consol/Lucerne #6E BondFinancial Fully Funded/Bonded
Base Costs:Present Capital Present Total Use
Value OMCost To Value AmountBond Or
# Of MPs:Annual O&M Capital Costs:ReCap Costs: CostConstructReCap Trust?
Permit #:Permit Name:Permit Status:TotalRawEstimated:Final:Estimated:Final:Estimated:Final:Cost
32851302LUCERNE 6E DEEP MINEStage 2 Eligible00$0$37,600$0$0$0$63,000Trust Fund Amounts:$861,927$63,000$0$924,927
Bond
Bond Amounts:$1,554,170$0$73,389$1,627,560
Total for the Consol/Lucerne #6E BondAgreement: 100$0$37,600$0$0$0$63,000Total AmountTrust:Bond:Amount Trust:Bond:
Indicated:$924,927.44$1,627,559.59Used:$0.00$1,627,559.59
Agreement Status: Trust/Bond FinalizedAgreement Consol/Renton BondFinancial Fully Funded/Bonded
Base Costs:Present Capital Present Total Use
Value OMCost To Value AmountBond Or
# Of MPs:Annual O&M Capital Costs:ReCap Costs: CostConstructReCap Trust?
Permit #:Permit Name:Permit Status:TotalRawEstimated:Final:Estimated:Final:Estimated:Final:Cost
02733702RENTON CRDAReclaimed/Chemical Treatment11$0$380,000$0$0$0$846,000Trust Fund Amounts:$8,710,969$846,000$0$9,556,969
Bond
Bond Amounts:$15,707,038$0$985,516$16,692,554
Total for the Consol/Renton BondAgreement: 111$0$380,000$0$0$0$846,000Total AmountTrust:Bond:Amount Trust:Bond:
Indicated:$9,556,968.86$16,692,554.22Used:$0.00$16,692,554.22
Page 4 of 56
Reported On : 07/29/2008
Trust Fund / Bond Agreement Summary Report - Detailed
Lead Office: California
Agreement Status: Trust/Bond FinalizedAgreement Miller Springs/Bird Mine No 2& 3 BondFinancial Fully Funded/Bonded
Base Costs:Present Capital Present Total Use
Value OMCost To Value AmountBond Or
# Of MPs:Annual O&M Capital Costs:ReCap Costs: CostConstructReCap Trust?
Permit #:Permit Name:Permit Status:TotalRawEstimated:Final:Estimated:Final:Estimated:Final:Cost
56841321BIRD MINE NO 2/NO 3Reclaimed/Chemical Treatment11$0$0$0$0$0$0Trust Fund Amounts:$0$0$0$0
Bond
Bond Amounts:$19,906,181$0$114,319$20,020,500
Total for the Miller Springs/Bird Mine No 2& 3 BondAgreement: 111$0$0$0$0$0$0Total AmountTrust:Bond:Amount Trust:Bond:
Indicated:$0.00$20,020,500.00Used:$0.00$20,020,500.00
Agreement Status: Trust/Bond FinalizedAgreement Penn Allegh BondFinancial Fully Funded/Bonded
Base Costs:Present Capital Present Total Use
Value OMCost To Value AmountBond Or
# Of MPs:Annual O&M Capital Costs:ReCap Costs: CostConstructReCap Trust?
Permit #:Permit Name:Permit Status:TotalRawEstimated:Final:Estimated:Final:Estimated:Final:Cost
02841304PENN ALLEGH 2 MINEReclaimed/Chemical Treatment11$25,323$0$0$0$12,859$0Trust Fund Amounts:$0$0$0$0
Bond
Bond Amounts:$1,007,899$0$14,907$1,022,806
Total for the Penn Allegh BondAgreement: 111$25,323$0$0$0$12,859$0Total AmountTrust:Bond:Amount Trust:Bond:
Indicated:$0.00$1,022,806.00Used:$0.00$1,022,806.00
Agreement Status: Trust/Bond FinalizedAgreement Rosebud/Mine #78 CRDA BondFinancial Fully Funded/Bonded
Base Costs:Present Capital Present Total Use
Value OMCost To Value AmountBond Or
# Of MPs:Annual O&M Capital Costs:ReCap Costs: CostConstructReCap Trust?
Permit #:Permit Name:Permit Status:TotalRawEstimated:Final:Estimated:Final:Estimated:Final:Cost
56743705ROSEBUD MINING CO/WINDBER Reclaimed/Chemical Treatment11$19,377$19,377$200,000$200,000$93,328$93,328Trust Fund Amounts:$444,191$33,911$0$478,102
78 CRDBond
Bond Amounts:$800,935$0$108,719$909,654
56841328ROSEBUD MINING CO/WINDBER Active10$0$0$0$0$0$0Trust Fund Amounts:$0$0$0$0
78 DEEP MINEBond
Bond Amounts:$0$0$0$0
Total for the Rosebud/Mine #78 CRDA BondAgreement: 221$19,377$19,377$200,000$200,000$93,328$93,328Total AmountTrust:Bond:Amount Trust:Bond:
Indicated:$478,101.64$909,653.91Used:$0.00$909,653.91
Page 5 of 56
Reported On : 07/29/2008
Trust Fund / Bond Agreement Summary Report - Detailed
Lead Office: California
Agreement Status: Trust/Bond FinalizedAgreement Tanoma CRDA BondFinancial Fully Funded/Bonded
Base Costs:Present Capital Present Total Use
Value OMCost To Value AmountBond Or
# Of MPs:Annual O&M Capital Costs:ReCap Costs: CostConstructReCap Trust?
Permit #:Permit Name:Permit Status:TotalRawEstimated:Final:Estimated:Final:Estimated:Final:Cost
32840701TANOMA REFUSE AREA 2Reclaimed/Passive Treatment22$0$0$0$0$0$0Trust Fund Amounts:$0$0$0$0
Bond
Bond Amounts:$626,479$0$306,073$932,552
Total for the Tanoma CRDA BondAgreement: 122$0$0$0$0$0$0Total AmountTrust:Bond:Amount Trust:Bond:
Indicated:$0.00$932,552.44Used:$0.00$932,552.44
Agreement Status: Trust/Bond FinalizedAgreement TJS Mining/CRDA #2 BondFinancial Fully Funded/Bonded
Base Costs:Present Capital Present Total Use
Value OMCost To Value AmountBond Or
# Of MPs:Annual O&M Capital Costs:ReCap Costs: CostConstructReCap Trust?
Permit #:Permit Name:Permit Status:TotalRawEstimated:Final:Estimated:Final:Estimated:Final:Cost
03870701DARMAC CRD 2Active00$0$1,512$0$10,647$0$12,657Trust Fund Amounts:$0$0$0$0
Bond
Bond Amounts:$60,180$0$74,835$135,015
Total for the TJS Mining/CRDA #2 BondAgreement: 100$0$1,512$0$10,647$0$12,657Total AmountTrust:Bond:Amount Trust:Bond:
Indicated:$0.00$135,015.41Used:$0.00$135,015.41
Agreement Status: Trust/Bond FinalizedAgreement Champion Processing Trust FundFinancial Partially Funded
Base Costs:Present Capital Present Total Use
Value OMCost To Value AmountBond Or
# Of MPs:Annual O&M Capital Costs:ReCap Costs: CostConstructReCap Trust?
Permit #:Permit Name:Permit Status:TotalRawEstimated:Final:Estimated:Final:Estimated:Final:Cost
63733701CHAMPION CRD/PREP SITEActive66$1,418,306$0$1,500,000$0$34,037$0Trust Fund Amounts:$1,500,000$0$0$1,500,000
Trust
Bond Amounts:$0$0$0$0
Total for the Champion Processing Trust FundAgreement: 166$1,418,306$0$1,500,000$0$34,037$0Total AmountTrust:Bond:Amount Trust:Bond:
Indicated:$1,500,000.00$0.00Used:$1,500,000.00$0.00
Page 6 of 56
Reported On : 07/29/2008
Trust Fund / Bond Agreement Summary Report - Detailed
Lead Office: California
Agreement Status: Trust/Bond FinalizedAgreement Pristine Resources Treatment TrustFinancial Partially Funded
Base Costs:Present Capital Present Total Use
Value OMCost To Value AmountBond Or
# Of MPs:Annual O&M Capital Costs:ReCap Costs: CostConstructReCap Trust?
Permit #:Permit Name:Permit Status:TotalRawEstimated:Final:Estimated:Final:Estimated:Final:Cost
10841302FAWN 91 MINEReclaimed/Chemical Treatment00$13,817$57,217$0$0$9,165$9,165Trust Fund Amounts:$1,311,620$9,165$0$1,320,785
Trust
Bond Amounts:$0$0$0$0
1170301BETHLEHEM NO 31Replaced11$937,052$460,488$0$300,000$71,276$71,276Trust Fund Amounts:$9,566,806$71,276$0$9,638,082
Trust
Bond Amounts:$0$0$0$0
1171301EHRENFELD MINE 38DReplaced11$0$33,340$0$0$0$0Trust Fund Amounts:$764,273$0$0$764,273
Trust
Bond Amounts:$0$0$0$0
1183201BROOKDALE MINE 77Replaced11$99,778$18,935$0$0$58,799$58,799Trust Fund Amounts:$4,335,674$58,799$0$4,394,473
Trust
Bond Amounts:$0$0$0$0
11841301CAMBRIA NO 33 DEEP MINEReclaimed/Chemical Treatment10$794,422$824,918$0$3,589,500$284,387$284,387Trust Fund Amounts:$2,994,548$284,387$0$3,278,935
Trust
Bond Amounts:$0$0$0$0
500129BROOKDALE MINE 77Replaced10$0$0$0$0$0$0Trust Fund Amounts:$0$0$0$0
Trust
Bond Amounts:$0$0$0$0
Total for the Pristine Resources Treatment TrustAgreement: 653$1,845,069$1,394,898$0$3,889,500$423,627$423,627Total AmountTrust:Bond:Amount Trust:Bond:
Indicated:$19,396,548.00$0.00Used:$19,396,548.00$0.00
Total for the Agreement status of Trust/Bond Finalized for the California office: 212319$3,717,073$2,741,187$5,700,000$8,100,147$565,191$2,995,560Total AmountTrust:Bond:Amount Trust:Bond:
Indicated:$58,376,175.73$84,811,774.81Used:$20,896,548.00$84,811,774.81
Page 7 of 56
Reported On : 07/29/2008
Trust Fund / Bond Agreement Summary Report - Detailed
Lead Office: California
Agreement Status: Agreement Agreement Duquesne Light/Warwick No. 2Financial Bond Requested
Base Costs:Present Capital Present Total Use
Value OMCost To Value AmountBond Or
# Of MPs:Annual O&M Capital Costs:ReCap Costs: CostConstructReCap Trust?
Permit #:Permit Name:Permit Status:TotalRawEstimated:Final:Estimated:Final:Estimated:Final:Cost
30841602WARWICK MINE 2 PREP PLTReclaimed/Chemical Treatment11$0$0$0$0$0$0Trust Fund Amounts:$0$0$0$0
Bond
Bond Amounts:$600,720$0$226,417$827,137
Total for the Duquesne Light/Warwick No. 2Agreement: 111$0$0$0$0$0$0Total AmountTrust:Bond:Amount Trust:Bond:
Indicated:$0.00$827,137.06Used:$0.00$827,137.06
Agreement Status: Agreement Agreement Eastern Associates/Colver MineFinancial Bond Requested
Base Costs:Present Capital Present Total Use
Value OMCost To Value AmountBond Or
# Of MPs:Annual O&M Capital Costs:ReCap Costs: CostConstructReCap Trust?
Permit #:Permit Name:Permit Status:TotalRawEstimated:Final:Estimated:Final:Estimated:Final:Cost
11981701EASTERN ASSOC COAL CORP Reclaimed/Chemical Treatment11$245,094$0$0$0$0$0Trust Fund Amounts:$0$0$0$0
COLVER IND WASTETrust
Bond Amounts:$0$0$0$0
Total for the Eastern Associates/Colver MineAgreement: 111$245,094$0$0$0$0$0Total AmountTrust:Bond:Amount Trust:Bond:
Indicated:$0.00$0.00Used:$0.00$0.00
Agreement Status: Agreement Agreement Eastern Associates/Delmont CRDAFinancial Bond Requested
Base Costs:Present Capital Present Total Use
Value OMCost To Value AmountBond Or
# Of MPs:Annual O&M Capital Costs:ReCap Costs: CostConstructReCap Trust?
Permit #:Permit Name:Permit Status:TotalRawEstimated:Final:Estimated:Final:Estimated:Final:Cost
65831701EASTERN ASSOC COAL Reclaimed/Chemical Treatment11$0$0$0$0$0$0Trust Fund Amounts:$0$0$0$0
CORP/DELMONT FACBond
Bond Amounts:$5,651,511$0$0$5,651,511
Total for the Eastern Associates/Delmont CRDAAgreement: 111$0$0$0$0$0$0Total AmountTrust:Bond:Amount Trust:Bond:
Indicated:$0.00$5,651,510.57Used:$0.00$5,651,510.57
Agreement Status: Agreement Agreement Indiana Investments/Urling 1/3Financial Bond Requested
Base Costs:Present Capital Present Total Use
Value OMCost To Value AmountBond Or
# Of MPs:Annual O&M Capital Costs:ReCap Costs: CostConstructReCap Trust?
Permit #:Permit Name:Permit Status:TotalRawEstimated:Final:Estimated:Final:Estimated:Final:Cost
32841312URLING 1/3 DEEP MINEReclaimed/Chemical Treatment00$57,834$0$0$0$115,821$0Trust Fund Amounts:$1,734,267$115,821$0$1,850,088
Bond
Bond Amounts:$2,672,466$0$115,821$2,788,287
Total for the Indiana Investments/Urling 1/3Agreement: 100$57,834$0$0$0$115,821$0Total AmountTrust:Bond:Amount Trust:Bond:
Indicated:$1,850,088.12$2,788,286.71Used:$0.00$2,788,286.71
Page 8 of 56
Reported On : 07/29/2008
Trust Fund / Bond Agreement Summary Report - Detailed
Lead Office: California
Agreement Status: Agreement Agreement PA Mines Global TrustFinancial Bond Requested
Base Costs:Present Capital Present Total Use
Value OMCost To Value AmountBond Or
# Of MPs:Annual O&M Capital Costs:ReCap Costs: CostConstructReCap Trust?
Permit #:Permit Name:Permit Status:TotalRawEstimated:Final:Estimated:Final:Estimated:Final:Cost
14743701RUSHTON MINING/PAULINE Stage 2 Approved00$0$0$0$0$0$0Trust Fund Amounts:$0$0$0$0
HOLLOW REFUSEBond
Bond Amounts:$0$0$0$0
14831301RUSHTON MINING/RUSHTON Reclaimed/Chemical Treatment11$727,393$720,690$1,464,971$1,458,412$538,220$1,161,887Trust Fund Amounts:$16,520,811$1,161,887$0$17,682,698
DEEP MINEBond
Bond Amounts:$29,789,225$0$1,161,887$30,951,112
17031701LADY JANE COLLIERIES, Reclaimed/Passive Treatment00$0$0$0$0$0$0Trust Fund Amounts:$0$0$0$0
INC/HORNING RUN PASSIVE Bond
TRTMNTBond Amounts:$928,832$0$488,780$1,417,612
266M023STOTT #1 DEEP MINEReclamation Complete11$0$0$0$0$0$0Trust Fund Amounts:$0$0$0$0
Bond
Bond Amounts:$0$0$0$0
32733708PENNSYLVANIA MINES Reclaimed/Chemical Treatment11$23,998$0$11,437$0$0$0Trust Fund Amounts:$0$0$0$0
CORP/GREENWICH #1Bond
Bond Amounts:$0$0$0$0
32841302GREENWICH N1 & S2 DEEPReclaimed/Chemical Treatment00$0$0$0$0$0$0Trust Fund Amounts:$0$0$0$0
Bond
Bond Amounts:$1,962,919$0$352,996$2,315,916
Total for the PA Mines Global TrustAgreement: 633$751,391$720,690$1,476,408$1,458,412$538,220$1,161,887Total AmountTrust:Bond:Amount Trust:Bond:
Indicated:$17,682,697.91$34,684,639.49Used:$0.00$34,684,639.49
Total for the Agreement status of Agreement Reached for the California office: 1066$1,054,319$720,690$1,476,408$1,458,412$654,041$1,161,887Total AmountTrust:Bond:Amount Trust:Bond:
Indicated:$19,532,786.03$43,951,573.83Used:$0.00$43,951,573.83
Agreement Status: Negotiations Agreement Maple Creek MiningFinancial Bond Requested
Base Costs:Present Capital Present Total Use
Value OMCost To Value AmountBond Or
# Of MPs:Annual O&M Capital Costs:ReCap Costs: CostConstructReCap Trust?
Permit #:Permit Name:Permit Status:TotalRawEstimated:Final:Estimated:Final:Estimated:Final:Cost
63841302MAPLE CREEK MINEActive11$120,288$0$0$0$117,890$0Trust Fund Amounts:$2,757,434$65,162$0$2,822,596
Bond
Bond Amounts:$4,972,022$0$117,890$5,089,912
Total for the Maple Creek MiningAgreement: 111$120,288$0$0$0$117,890$0Total AmountTrust:Bond:Amount Trust:Bond:
Indicated:$2,822,596.27$5,089,911.61Used:$0.00$5,089,911.61
Total for the Agreement status of Negotiations Ongoing for the California office: 111$120,288$0$0$0$117,890$0Total AmountTrust:Bond:Amount Trust:Bond:
Indicated:$2,822,596.27$5,089,911.61Used:$0.00$5,089,911.61
Page 9 of 56
Reported On : 07/29/2008
Trust Fund / Bond Agreement Summary Report - Detailed
Lead Office: California
Agreement Status: Initial Calcs CmpltdAgreement Canterbury David/Dianne BondFinancial Bond Requested
Base Costs:Present Capital Present Total Use
Value OMCost To Value AmountBond Or
# Of MPs:Annual O&M Capital Costs:ReCap Costs: CostConstructReCap Trust?
Permit #:Permit Name:Permit Status:TotalRawEstimated:Final:Estimated:Final:Estimated:Final:Cost
03841302DAVID DIANNE MINEReclaimed/Chemical Treatment11$201,049$0$0$0$1,678,000$0Trust Fund Amounts:$0$0$0$0
Bond
Bond Amounts:$8,002,100$0$1,945,272$9,947,372
Total for the Canterbury David/Dianne BondAgreement: 111$201,049$0$0$0$1,678,000$0Total AmountTrust:Bond:Amount Trust:Bond:
Indicated:$0.00$9,947,371.84Used:$0.00$9,947,371.84
Agreement Status: Initial Calcs CmpltdAgreement Solar #7Financial Not Started
Base Costs:Present Capital Present Total Use
Value OMCost To Value AmountBond Or
# Of MPs:Annual O&M Capital Costs:ReCap Costs: CostConstructReCap Trust?
Permit #:Permit Name:Permit Status:TotalRawEstimated:Final:Estimated:Final:Estimated:Final:Cost
56841310SOLAR NO 7 DEEP MINEReclaimed/Chemical Treatment00$0$0$0$0$0$0Trust Fund Amounts:$0$0$0$0
Trust
Bond Amounts:$0$0$0$0
Total for the Solar #7Agreement: 100$0$0$0$0$0$0Total AmountTrust:Bond:Amount Trust:Bond:
Indicated:$0.00$0.00Used:$0.00$0.00
Total for the Agreement status of Initial Calcs Cmpltd for the California office: 211$201,049$0$0$0$1,678,000$0Total AmountTrust:Bond:Amount Trust:Bond:
Indicated:$0.00$9,947,371.84Used:$0.00$9,947,371.84
Agreement Status: Data CollectionAgreement Sonman RefuseFinancial Not Started
Base Costs:Present Capital Present Total Use
Value OMCost To Value AmountBond Or
# Of MPs:Annual O&M Capital Costs:ReCap Costs: CostConstructReCap Trust?
Permit #:Permit Name:Permit Status:TotalRawEstimated:Final:Estimated:Final:Estimated:Final:Cost
11860701SONMAN REFUSEActive00$0$0$0$0$0$0Trust Fund Amounts:$0$0$0$0
Trust
Bond Amounts:$0$0$0$0
Total for the Sonman RefuseAgreement: 100$0$0$0$0$0$0Total AmountTrust:Bond:Amount Trust:Bond:
Indicated:$0.00$0.00Used:$0.00$0.00
Total for the Agreement status of Data Collection for the California office: 100$0$0$0$0$0$0Total AmountTrust:Bond:Amount Trust:Bond:
Indicated:$0.00$0.00Used:$0.00$0.00
Total for the California office: 353127$5,092,729$3,461,877$7,176,408$9,558,559$3,015,122$4,157,447Total AmountTrust:Bond:Amount Trust:Bond:
Indicated:$80,731,558.03$143,800,632.0Used:$20,896,548.00$143,800,632.0
Page 10 of 56
Reported On : 07/29/2008
Trust Fund / Bond Agreement Summary Report - Detailed
Lead Office: Cambria
Agreement Status: Trust/Bond FinalizedAgreement A & T BondFinancial Fully Funded/Bonded
Base Costs:Present Capital Present Total Use
Value OMCost To Value AmountBond Or
# Of MPs:Annual O&M Capital Costs:ReCap Costs: CostConstructReCap Trust?
Permit #:Permit Name:Permit Status:TotalRawEstimated:Final:Estimated:Final:Estimated:Final:Cost
32803053FISHER STRIPReclaimed/Passive Treatment11$1,180$0$0$8,016Trust Fund Amounts:$27,050$8,016$0$35,066
Bond
Bond Amounts:$48,774$0$18,672$67,447
Total for the A & T BondAgreement: 111$0$1,180$0$0$8,016Total AmountTrust:Bond:Amount Trust:Bond:
Indicated:$35,065.85$67,446.87Used:$0.00$67,446.87
Agreement Status: Trust/Bond FinalizedAgreement Ace Drilling/Cresson Mt TrustFinancial Fully Funded/Bonded
Base Costs:Present Capital Present Total Use
Value OMCost To Value AmountBond Or
# Of MPs:Annual O&M Capital Costs:ReCap Costs: CostConstructReCap Trust?
Permit #:Permit Name:Permit Status:TotalRawEstimated:Final:Estimated:Final:Estimated:Final:Cost
6576SM4CRESSON MT STRIP NO 1Bond Forfeited20$0$4,744$0$0$0$0Trust Fund Amounts:$108,740$0$0$108,740
Trust
Bond Amounts:$0$0$0$0
Total for the Ace Drilling/Cresson Mt TrustAgreement: 120$0$4,744$0$0$0$0Total AmountTrust:Bond:Amount Trust:Bond:
Indicated:$108,740.00$0.00Used:$108,740.00$0.00
Agreement Status: Trust/Bond FinalizedAgreement Action - Pletcher Farms TrustFinancial Fully Funded/Bonded
Base Costs:Present Capital Present Total Use
Value OMCost To Value AmountBond Or
# Of MPs:Annual O&M Capital Costs:ReCap Costs: CostConstructReCap Trust?
Permit #:Permit Name:Permit Status:TotalRawEstimated:Final:Estimated:Final:Estimated:Final:Cost
56663069SUMMIT NO 2 MINEActive44$0$0$0$0$0$0Trust Fund Amounts:$100,000$0$0$100,000