Job Title: Adoptions Engineer.
Reports to: Senior Engineer.
Job Description: To be responsible for the adoption of roads, sewers, pumping stations, and public open spaces within the North East Area.
Budgets:Work within budgets set by others and report any potential overspend.
Key Responsibilities:
- Remedial Management and supervision of road & sewer’s, footpath construction and final surfacing works. Ensuring that the works are carried out within an agreed budget and timescale.
- To arrange for CCTV, As Constructed surveys; Street Lighting completion certificates and remedial works with Contractors and Consultants.
- The adoption of roads, sewers, pumping stations and open spaces covered under Section 38 and S278 of the Highways act 1980; and Section 102 and 104 of the Water Industry Act 1991.
- Liaison with Local Authority, Water Company and Environment Agency personnel in respect of site inspections, reporting etc.
- Work to an agreed programme of scheduled adoptions; such programme to be discussed and reviewed with the Senior Engineer on a fortnightly basis.
- Update the Companies Bonds Management Schedule on a regular basis; ensuring that a monthly report is available to the Technical Manager at the end of each month.
- Maintain development correspondence files.
- Have a sound knowledge and experience of civil engineering construction activities; ie. roads, sewers, pumping stations and section agreements
- Comply with responsibilities as laid down in the Group’s Health, Safety and Environment Policy.
- At all times comply with company policies, procedures and instructions.
Working Relationships:
Effective working relationships are an essential part of daily working life.
The focus in this role is both:-
Internal: Colleagues within Operating Company; and
External: Managers in both Local Authority, statutory bodies, appointed consultants and sub contractors.
Decision Making
- Agree issue’s with external bodies and remedial works (within remit of cost and programme)
- Instructing Consultants to vary or amend designs (within remit of cost and programme).
- Instructing Contractors to carry out agreed remedial work (within remit of cost and programme).