BID FOR UNIT PRICE CONTRACTS

Project Site: Apple Valley South

Project Name: Creek Rehabilitation Design-Build Construction for Apple Valley South______

Project No: _CDBG-DR WI 17-108/EWP - Apple Valley South ______

Proposal of ______(hereinafter called Bidder), a corporation organized underthe laws of the State of __Colorado___ /a partnership/an individual doing business as

______(strike out inapplicable references).

To the ______Saint Vrain Creek Coalition ______(hereinafter called Owner).

The Bidder, in compliance with your invitation for bids for the construction of a

Design-build river restoration project

having examined the plans and specifications with related documents and the site of the proposed work, and being familiar with all of the conditions surrounding the construction of the proposed project including the availability of materials and labor, hereby proposes to furnish all labor, materials, and supplies; and to construct the project in accordance with the Contract Documents, within the time set forth therein, and at the prices stated below. These prices are to cover all expenses incurred in performing the work required under the Contract Documents, of which this proposal is a part.

Bidder hereby agrees to commence work under this contract on or before a date to be specified in a written "Notice to Proceed" of the Owner and to fully complete the project within consecutive calendar days thereafter is stipulated in the specifications. Bidder further agrees to pay as liquidated damages, the sum of $ for each consecutive calendar day thereafter as hereinafter provided in the GENERAL CONDITIONS.

Bidder acknowledges receipt of the following addenda:

Bidder agrees to perform all the Creek Rehabilitation Design-Build Construction for Apple Valley South_work described in the 30% plans, for the following unit prices. IMPORTANT: If the bid is selected, the unit prices provided with this bid will be binding at the time of contracting; changes to the unit price may be allowed with the written approval of the Saint Vrain Creek Coalition. However, these quantities which are based on the 30% plan will be adjusted according to the final construction-ready design.

Item # / Estimated Quantity / Description / Unit Price (Each)
Dollars & Cents / Total Price
Dollars & Cents
Design Tasks
  1. Design 30% to Construction-Ready
/ 1 Lump Sum / Consulting services to finalize design for permitting
  1. Permitting
/ 1 Lump Sum / Consulting services to obtain required permits, but not limited to (Boulder County Floodplain Development, Grading, CDOT Roadway, Boulder County Roadway, ACOE, CDPHE Stormwater)
Construction Tasks
Item # / Estimated Quantity & Unit / Task Description / Unit Price (Each)
Dollars & Cents / Total Price
Dollars & Cents
1.0 General Construction
  1. Mobilization
/ 1 Lump Sum / Mobilize for construction
  1. Water Control
/ 1 Lump Sum / Water control, such as dewatering, temporary crossing
  1. Erosion Control
/ 1 Lump Sum / Storm water, sediment and pollution management due construction activities
  1. Construction Oversight
/ 1 Lump Sum / Engineering oversite of construction activities and field-fitting
2.0 Earthwork
  1. Earthwork, Excavation, and Fill
/ 4304 CY / Grading, excavation, and fill (May include tree removal)
  1. Earthwork, Excavation, and Haul Off-site
/ 398 CY / Excavation, grading, and hauling excess sediment for disposal
Item # / Estimated Quantity & Unit / Task Description / Unit Price (Each)
Dollars & Cents / Total Price
Dollars & Cents
3.0 Stream Restoration
  1. Boulder Bank Protection
/ 761 LF / Bank protection using boulders
  1. Toe Wood/ Rootwad Bank Protection
/ 174LF / Install toe wood or rootwads bank protection in Reaches 3B and 3C
  1. Reinforced Boulder Riffle Structures
/ 2 Structures / Install 2 reinforced boulder riffle structures in Reach 3B
  1. Habitat Boulders
/ 80 Boulders / Install boulders for channel complexity, grade control, and aquatic habitat
  1. Wood Catcher Structures
/ 1 Structure / Install a wood catcher in Reach 3A
4.0 Revegetation
  1. Riparian Seed
/ 3.1 Acres / Install upland seed in the transition zone
  1. Wood Straw
/ 3.1 Acres / Spread wood straw in the upland and riparian areas
  1. Biosol
/ 3.1 Acres / Install at 400 lbs/acre onto revegetation sites
  1. Humate
/ 3.1 Acres / Install at 400 lbs/acre onto revegetation sites
  1. Container Stock D60
/ 1195 Containers / Install D60 container stock
  1. Container Stock 10ci
/ 12,884 Containers / Install 10ci container stock
  1. Willow and Cottonwood Whips
/ 1200 Whips / Install willow and cottonwood whips
  1. Willow and Cottonwood Poles
/ 40 Poles / Install willow and cottonwood poles
5.0 Other

TOTAL OF BID$

The above unit prices shall include all labor, materials, bailing, shoring, removal, overhead, profit, insurance, etc., to cover the finished work of the several kinds called for.

Bidder understands that the Owner reserves the right to reject any or all bids and to waive any informality in the bidding.

The Bidder agrees that this bid shall be good and may not be withdrawn for a period of thirty (30) calendar days after the scheduled closing time for receiving bids.

Upon receipt of Owner's written acceptance of this bid, Bidder will execute the formal contract attached within ten (10) days and deliver a Surety Bond or Bonds as required by the GENERAL CONDITIONS.

The bid security attached in the sum of ______($______) is to become the property of the Owner in the event the contract and bond are not executed within the time above set forth, as liquidated damages for the delay and additional expense to the Owner caused thereby.

Respectively submitted,

By:

(SEAL If bid is by a corporation)

Title

Address

______

Date

BID FOR UNIT PRICE CONTRACTSPage 1 of 4