BID FOR UNIT PRICE CONTRACTS
Project Site: Apple Valley South
Project Name: Creek Rehabilitation Design-Build Construction for Apple Valley South______
Project No: _CDBG-DR WI 17-108/EWP - Apple Valley South ______
Proposal of ______(hereinafter called Bidder), a corporation organized underthe laws of the State of __Colorado___ /a partnership/an individual doing business as
______(strike out inapplicable references).
To the ______Saint Vrain Creek Coalition ______(hereinafter called Owner).
The Bidder, in compliance with your invitation for bids for the construction of a
Design-build river restoration project
having examined the plans and specifications with related documents and the site of the proposed work, and being familiar with all of the conditions surrounding the construction of the proposed project including the availability of materials and labor, hereby proposes to furnish all labor, materials, and supplies; and to construct the project in accordance with the Contract Documents, within the time set forth therein, and at the prices stated below. These prices are to cover all expenses incurred in performing the work required under the Contract Documents, of which this proposal is a part.
Bidder hereby agrees to commence work under this contract on or before a date to be specified in a written "Notice to Proceed" of the Owner and to fully complete the project within consecutive calendar days thereafter is stipulated in the specifications. Bidder further agrees to pay as liquidated damages, the sum of $ for each consecutive calendar day thereafter as hereinafter provided in the GENERAL CONDITIONS.
Bidder acknowledges receipt of the following addenda:
Bidder agrees to perform all the Creek Rehabilitation Design-Build Construction for Apple Valley South_work described in the 30% plans, for the following unit prices. IMPORTANT: If the bid is selected, the unit prices provided with this bid will be binding at the time of contracting; changes to the unit price may be allowed with the written approval of the Saint Vrain Creek Coalition. However, these quantities which are based on the 30% plan will be adjusted according to the final construction-ready design.
Item # / Estimated Quantity / Description / Unit Price (Each)Dollars & Cents / Total Price
Dollars & Cents
Design Tasks
- Design 30% to Construction-Ready
- Permitting
Construction Tasks
Item # / Estimated Quantity & Unit / Task Description / Unit Price (Each)
Dollars & Cents / Total Price
Dollars & Cents
1.0 General Construction
- Mobilization
- Water Control
- Erosion Control
- Construction Oversight
2.0 Earthwork
- Earthwork, Excavation, and Fill
- Earthwork, Excavation, and Haul Off-site
Item # / Estimated Quantity & Unit / Task Description / Unit Price (Each)
Dollars & Cents / Total Price
Dollars & Cents
3.0 Stream Restoration
- Boulder Bank Protection
- Toe Wood/ Rootwad Bank Protection
- Reinforced Boulder Riffle Structures
- Habitat Boulders
- Wood Catcher Structures
4.0 Revegetation
- Riparian Seed
- Wood Straw
- Biosol
- Humate
- Container Stock D60
- Container Stock 10ci
- Willow and Cottonwood Whips
- Willow and Cottonwood Poles
5.0 Other
TOTAL OF BID$
The above unit prices shall include all labor, materials, bailing, shoring, removal, overhead, profit, insurance, etc., to cover the finished work of the several kinds called for.
Bidder understands that the Owner reserves the right to reject any or all bids and to waive any informality in the bidding.
The Bidder agrees that this bid shall be good and may not be withdrawn for a period of thirty (30) calendar days after the scheduled closing time for receiving bids.
Upon receipt of Owner's written acceptance of this bid, Bidder will execute the formal contract attached within ten (10) days and deliver a Surety Bond or Bonds as required by the GENERAL CONDITIONS.
The bid security attached in the sum of ______($______) is to become the property of the Owner in the event the contract and bond are not executed within the time above set forth, as liquidated damages for the delay and additional expense to the Owner caused thereby.
Respectively submitted,
By:
(SEAL If bid is by a corporation)
Title
Address
______
Date
BID FOR UNIT PRICE CONTRACTSPage 1 of 4