Appendix No. (2) - Contractors Classification Requirements

Field / Specialization / Category / Paid Up
Capital *
JD / Value of
Equipments
JD / Maximum Project Value
JD / "Ceiling" Maxi.
Projects Value
JD / Admin. Staff / Full Time
Technical Staff / Experience - Completion of
Projects In fulfillment of the
Obligation In the Amount of / Office Area / Types of Equipments
Buildings / Building construction / First / 500,000 / 250,000 / ------ / ------ / General Mgr.
Admin. Fin .Mgr.
Accountant / Technical Manager
(2) Engineers
Quantity Surveyor / Integrated Building Projects
in the amount of 20 Million Dinars. / 150 Sq. M. / Scoopers, Dumpers, Tower Crane, Central Concrete Mixer, Ordinary Concrete Mixer, Water Tankers, Metal Beams, Vibrating Roller,
Block Plant , Air Compressors, Water Pumps , Electrical
Generators , Concrete Pumps , Truck Mounted Concrete
Mixer, Materials Laboratory, Surveying Tools , Stone Saw,
Carpenter Shop , Smithy,
Aluminum Workshop and Others.
Second / 300,000 / 150,000 / 5 Millions / 10 Millions / General Mgr.
Admin.
Accountant / Technical Manager
Engineer
Quantity Surveyor / Integrated Building Projects
in the amount of 10 Million Dinars. / 120 Sq. M.
Third / 150,000 / 50,000 / 2 Million / 4 Millions / Gen. Mgr.
Accountant / Technical Manager
Engineer / Integrated Building Projects
in the amount of 3.5 Million Dinars. / 80 Sq. M.
Buildings / Building construction / Fourth / 50,000 / 30,000 / 750,000 / 1.5 Million / Clerk
Accountant / Technical Manager / Integrated Building Projects
in the amount of 1000.000 One Million Dinars . / 50 Sq. M. / Concrete Mixers , Dumper, Vibrators, Shuttering Supports, Water Tanker & Air Compressors.
Fifth / 20.000 / 10.000 / 250.000 / 500.000 / Clerk / Civil or Archit. Engineer / Building Projects in the
amount of 250.000 Dinars . / 30 Sq. M.
  • For new companies or companies desire to amend the classification category, the schedule of Capital shall be applied. /Paid-up capital means the rights of shareholders (owners).
  • Programming and Planning Engineer is a prerequisite for those who are classified in first category for all main fields.
  • A licensed Puck-up truck is a prerequisite for all fields and specializations of the categories (First, second, third and fourth).
  • Ceilings and experiences contained in these tables shall be reviewed every year in line with the inflation in prices.
  • Technical Manager / Civil Engineer.

Field / Specialization / Category / Paid Up
Capital *
JD / Value of
Equipments
JD / Maximum Project Value
JD / "Ceiling" Maxi.
Projects Value
JD / Admin. Staff / Full Time
Technical Staff / Experience - Completion of
Projects In fulfillment of the
Obligation In the Amount of / Office Area / Types of Equipments
Building construction / Renovation & maintenance of buildings and Archaeological sites and heritage / First / 200,000 / 50,000 / ------ / ------ / General Mgr ***
Admin. Mgr
Fin.Mgr
Accountant / Architect with 12 years experience in field of maintenance and renovation works of Antiquities,
draftsman, Archeologist, quantity surveyor, renovation specialist of Antiquities. / Similar Projects in the amount of 2 Million Dinars or an experience acceptable by the Committee. / 150 Sq. M. / Scaffolds /propitiate Air compressors / Hand tools / Concrete Mixers / Computers / movable Stone Saw and Crane.
Buildings / Second / 100,000 / 30,000 / 1 Million / 3 Millions / General Mgr.
Admin..
Accountant / Architect with 10 years of experience in field of maintenance and renovation works of Antiquities,
l draftsman, Archeologist, renovation specialist of Antiquities. / Similar Projects in the amount of 1 Million Dinars or an experience acceptable by the Committee. / 120 Sq. M.
Third / 75,000 / 20,000 / 500,000 / 2 Millions / Gen. Mgr.
Accountant / Architect with 8 years experience in field of maintenance and renovation works of Antiquities,
draftsman, Archeologist, quantity surveyor, renovation of Antiquities. / Similar Projects in the amount of (500,000) Dinars or an experience acceptable by the Committee. / 80 Sq. M.
Buildings / Fourth / 50,000 / 5,000 / 300,000 / 1 Million / Clerk ,
Accountant / Architect with 5 years experience in field of maintenance and renovation works of Antiquities,
draftsman, Archeologist, renovation of Antiquities.** / Similar Projects in the amount of (250,000) Dinars or an experience acceptable by the Committee. / 50 Sq. M. / .

* The Archaeologist is a specialist in archaeology science with experience of 10 years minimum in the field of Restoration and explorationof archaeological sites

** Technicians are specialists in the field of Restoration and exploration of archaeological sites graduated from specialized schools and institutes.

*** The administrative Manager: Those who have to management expertise in the field of restoration work or graduate from schools of mosaics are preferred.

-Those who wish to add to this classification in this field are required to be classified in the specialization of building constructions in the third category and above or in field of maintenance of the buildings in the second category and above. If the classification is completed for the first time, it is based on personal experience of the architect of 12 years.

Field of work / Specialization / Category / Paid Up
Capital * / Value of
Equipments
Dinar / Maximum Project Value
Dinar / "Ceiling" Maxi.
Projects Value
Dinar / Admin. Staff / Full Time
Technical Staff / Experience - Completion of
Projects In fulfillment of the
Obligation In the Amount of / Office Area / Types of Equipments
B
U
I
L
D
I
N
G
S / Pre-cast concrete / FIRST / 500.000 / 600.000 / ----- / ----- / General Manager, Admin. Manager and accountant / Technical Manager, Civil Engineer, quantity surveyor / Pre-cast concrete Projects in the amount of 4.5 Million Dinars. / 150 Sq. M. / Scoopers, Dumpers, Tower Crane, Forklift, Concrete Mixer, Water Pumps , Air Compressors, Trucks, Materials Laboratory, Surveying Tools and Vibrating Roller.
* Contractor should be owner of the factory.
SECOND / 300.000 / 200.000 / 2 Millions / 4 Millions / General Manager, Admin. Manager and accountant / Technical Manager, Civil Engineer / Pre-cast concrete Projects in the amount of 2 Million Dinars. / 120 Sq. M. / .
B
U
I
L
D
I
N
G
S / Steel structures / FIRST / 500.000 / 200.000 / ------ / ------ / General Manager, Admin. Manager and accountant / Technical Manager
Civil Engineer
Mechanical Engineer / Steel structure Projects in the amount of 6 Million Dinars. / 150 Sq. M. / Concrete mixer, Dumper, Forklift and water pumps
SECOND / 200.000 / 90.000 / 1 Million / 4 Millions / General Mgr.
Accountant / Technical Manager
Engineer / Steel structure Projects in the amount of 2 Million Dinars. / 120 Sq. M. / Air compressors, Trucks, Vibrator Roller and Surveying Tools
THIRD / 100.000 / 40.000 / 250.000 / 1 Million / Gen. Mgr.
Accountant / Civil Engineer / Steel structure Projects in the amount of one million Dinars. / 80 Sq. M. / Cutter, Bending Machine, Metal sheets machine, Forklift. For the first and second categories , the contractor should be the owner of the factory and a workshop for the third category
Prefab. Buildings / FIRST / 250.000 / 150.000 / ------ / ------ / General Manager, Admin. Manager and accountant / Technical Manager
Civil Engineer / Prefab. Buildings Projects in the amount of one Million Dinars / 150 Sq. M / Concrete Mixers, Dumpers, Forklifts, Trucks, Vibrating Roller, Water Tanker & surveying Tools
SECOND / 50.000 / 70.000 / 300.000 / 600.000 / General Mgr.
Accountant / Civil Engineer / Prefab. Building Projects in the amount of 250.000 Dinars. / 120 Sq. M.
Field of work / Specialization / Category / Paid Up
Capital * / Value of
Equipments
Dinar / Maximum Project Value
Dinar / "Ceiling" Maxi.
Projects Value
Dinar / Admin. Staff / Full Time
Technical Staff / Experience - Completion of
Projects In fulfillment of the
Obligation In the Amount of / Office Area / Types of Equipments
BUILDINGS / Building maintenance / FIRST / 300.000 / 75.000 / ------ / ------ / Admin. Manager, Accountant / Civil Engineer, Electrical or Mechanical Engineer
Quantity surveyor / Maintenance projects for a value of 2 Million Dinars / 150 m2
SEOND / 150.000 / 30.000 / 400.000 / One Million / Admin. Manager, Accountant / Civil Engineer, Electrical or Mechanical Engineer / Maintenance projects for a value of one Million Dinars / 120 m2
THIRD / 100.000 / 20.000 / 250.000 / 650.000 / Admin. Manager, Accountant / Civil Engineer, Electricity Mechanic Engineer / Maintenance projects for a value of 500.000 Dinars / 80 m2 / Concrete Mixers, Air Pressures, Trucks, Hand Tools, Forklift, Workshop form maintenance, Ceiling insulation.
FOURTH / 50.000 / 15.000 / 150.000 / 400.000 / Accountant / Civil Engineer or Electric city Forman / Maintenance projects for a value of 300.000 Dinars / 50 m2
FIFTH / 20.000 / 5.000 / 40.000 / 100.000 / CLERK / Forman / Maintenance projects for a value of (100,000) Dinars / 30 m2
DÉCOR
WORKS
AND / FIRST / 200.000 / 100.000 / ------ / ------ / General manager Admin. Manager
Fin. Manager, Accountant / 2Architects any of them with a minimum of (10) yrs. Of experience in field of décor design. / Decor projects for a value of 4 four Million Dinars / 150 m2 / Gypsum plant, aluminum workshop, Smithy, Computers, Carpentry, draw shop, Trucks, aluminum workshop or Carpentry owned by the company.
FURNISHING / SECOND / 50.000 / 20.000 / 500.000 / One Million / General manager Accountant / Architect, Forman of décor works with experience of (5al) years alminimum. / Decor projects for a value of one Million Dinars or personal experience acceptable by the committee / 70 m2
Field of work / Specialization / Category / Paid Up
Capital * / Value of
Equipments
Dinar / Maximum Project Value
Dinar / "Ceiling" Maxi.
Projects Value
Dinar / Admin. Staff / Full Time
Technical Staff / Experience - Completion of
Projects In fulfillment of the
Obligation In the Amount of / Office Area / Types of Equipments
R
O
A
D
S / R
O
A
D
S
construction / FIRST / 750.000 / 1 million / ------ / ------ / General manager
Admin. Manager
Fin. Manager
Accountant / Tech. Manager.
(2) Engineers
Quant. Surveyor
Mech. Engineer with
7 Years of experience / Main or Municipal Road
Projects , asphalt pavement or
Intersections in the amount
of 20 Million Dinars / 150 M2 / Bulldozers Scoopers ,Leveling Machine , Grader, Scraper , Asphalt Mixer, paver, Rollers, Motor Vehicles ,Water Tankers,
Bitumen Boiler, Asphalt
Sprayer, Dumpers , Trucks , Air Compressors , Concrete Mixers ,
Sieves, Crusher, Integrated Materials Laboratory and Surveying Tools.
SECOND / 500.000 / 500.000 / 5 Million Dinars / 10 million Dinars / General manager
Admin. Manager
Accountant / Tech. Manager.
Civil Engineer
Mech. Engineer with
3 Years of experience / Main or Municipal Road
Projects , asphalt pavement or
Bridges & culverts in the amount of 10 Million Dinars / 120 M2
THIRD / 250.000 / 250.000 / 2 Million Dinars / 4 Million Dinars / General manager
Accountant / Tech. Manager
Office Engineer / Main or Municipal Road
Projects in the amount of 4 Million Dinars / 80 M2
  • For the fifth category / Roads, there should be among the equipment a licensed Roller not less than 25 tons of weight, Loader or Grader. These equipments are pre-requisite.
  • For the fourth category/ Roads, there should be among the equipment a licensed Roller not less than 25 tons of weight AND Loader. These equipments are pre-requisite.
  • The Technical Engineer/ Civil Eng.

Field of work / Specialization / Category / Paid Up
Capital / Value of
Equipments
Dinar / Maximum Project Value
Dinar / "Ceiling" Maxi.
Projects Value
Dinar / Admin. Staff / Full Time
Technical Staff / Experience - Completion of
Projects In fulfillment of the
Obligation In the Amount of / Office Area / Types of Equipments
R
O
A
D
S / R
O
A
D
S
construction / FOUTH / 125.000 / 150.000 / 750.000 / 1.5 Million / Accountant
Clerk / Civil Engineer / Road Projects in the amount of one Million Dinars / 50 M2 / Scooper, Roller, Concrete Mixer, bitumen boiler Dumper, Water Tanker, Air compressor, and Surveying Tools.
FIFTH / 50.000 / 50.000 / 250.000 / 500.000 / Clerk / Civil Engineer / Road Projects in the amount of 250.000 Dinars / 30 M2
/ ASPHALT
Pavement s / FIRST / 400.000 / 500.000 / ----- / ------ / General manager
Admin. Manager
Accountant / Tech. Manager.
Material Engineer
Material Analyst / asphlat pavement projects in the amount of 7 Million Dinars / 150 M2 / 90 Ton / Hour Asphalt Mixer, Dumper truck, Asphalt paver , Rollers, Asphalt payer, Asphalt Tanker, Materials Laboratory, Surveying Tools & Dumpers.
SECOND / 200.000 / 250.000 / 2 Million Dinars / 3 Million Dinars / General manager
Accountant / Tech. Manager
Material Analyst / asphlat pavement projects in the amount of 3 Million Dinars / 120 M2 / 60 Ton / Hour Asphalt Mixer, truck, Asphalt paver, Rollers, Asphalt Sprayer, Asphalt Tanker, Materials Laboratory & Dumpers.
THIRD / 100.000 / 100.000 / 500.000 / One million Dinars / General manager
Accountant / Civil Engineer
Material Analyst / asphlat pavement projects and Asphalt works in the amount of
one Million Dinars / 80 M2 / Asphalt paver, Gravel Spreader, Rollers, Asphalt sprayer, Truck and Dumper.
Field of work / Specialization / Category / Paid Up
Capital / Value of
Equipments
Dinar / Maximum Project Value
Dinar / "Ceiling" Maxi.
Projects Value
Dinar / Admin. Staff / Full Time
Technical Staff / Experience - Completion of
Projects In fulfillment of the
Obligation In the Amount of / Office Area / Types of Equipments
R
O
A
D
S / Concrete works/ Bridges, intersections, Tunnels / FIRST / 400,000 / 350,00o / -- / ------ / General Manager
Admin. Manager
accountant / Technical Manager
Civil Engineer / Intersection Bridges and Culverts Projects, in the amount of 9 Million Dinars / 150 M2 / Scoopers , Bulldozers, Central Concrete Mixers, ordinary Concrete Mixers, Tower Crane, Concrete Vibrator, Air Compressors, dumper Truck, , Roller, Water Tanker, Cement Mixer on a Truck, Concrete pumper, Materials Laboratory, Surveying Tools & cement Trucker.
SECOND / 200,000 / 200.000 / 2 milllions dinar / 4 Million Dinars / General manager
Accountant / Technical Manager
Civil Engineer / Bridges & Culverts Projects in the amount of 4 million Dinars / 120 M2
/ Culverts, retaining walls and Draining culverts. / THIRD / 75,000 / 75.000 / 500,000 diners / One Million Dinars. / Accountant, Clerk / Civil Engineer / Walls and Culverts projects in the amount of one Million Dinars / 80 M2 / Concrete Mixer, Vibrators, Steel Beams, Dumpers, Tanker, Air compressors, Scooper, Roller, Surveying Tools.
Field of work / Specialization / Category / Paid Up
Capital / Value of
Equipments
Dinar / Maximum Project Value
Dinar / "Ceiling" Maxi.
Projects Value
Dinar / Admin. Staff / Full Time
Technical Staff / Experience - Completion of
Projects In fulfillment of the
Obligation In the Amount of / Office Area / Types of Equipments
R
O
A
D
S / Earth works/ excavations and Mining. / FIRST / 400.000 / 75.000 / ------ / ------ / General Manager
Admin. Manager
accountant / Technical Manager
Civil Engineer
Survey Engineer / Earth works for Roads and earth Dams in the amount of 4 Million Dinars / 150 M2 / Scooper, Bulldozer, Water Tanker Scrapper, Roller, Air compressors
* Leveling Machine is a pre-requisite for the first, second and the third categories / Excavations
SECOND / 200.000 / 500.000 / 1.5 Million Dinars / 3 Million Dinars / General manager
Accountant / Technical Manager
Civil Engineer
Surveyor / Earth works for Roads in the amount of 2 million Dinars / 120 M2
Excavations / THIRD / 50.000 / 50.000 / 500.000 / One Million Dinars / Clerk / Civil Engineer
Surveyor / Excavations in the amount of one Million Dinars / 80 M2
Field / Specialization / Category / Paid Up
Capital / Value of
Equipments
Dinar / Maximum Project Value
Dinar / "Ceiling" Maxi.
Projects Value
Dinar / Admin. Staff / Full Time
Technical Staff / Experience - Completion of
Projects In fulfillment of the
Obligation In the Amount of / Office Area / Types of Equipments
WATER AND SEWER- AGE / WATER & SEWERAGE / FIRST / 400.000 / 400.000 / ------ / ------ / General manager
Admin. Manager
Fin. Manager
Accountant / Tech. Manager
Mich. (2) Engineers with (3) years of experience / Projects in the amount of 18 Million Dinars / 150 M2 / scoopers, Excavator, pipes' Installation Equipments, Side Boom ,pipe cutters, Air compressors, Trench Vibrators, Roller, Concrete Mixer, Water Tanker, Dumper, maintenance workshop, trucks , Miscellaneous Welding Machines, Surveying Tools, Networks Maintenance equipments.
SECOND / 300.000 / 200.000 / 5 Millions / 10 Millions / General manager
Admin. Manager
Accountant / Tech. Manager
(2) Engineers
Surveyor / Projects in the amount of 10 Million Dinars / 120 M2 / Excavators are very necessary for the First, Second and Third categories.
THIRD / 150.000 / 100.000 / 2 Millions / 4 Millions / General manager
Accountant / (2) Engineers / projects in the amount of 4 Million Dinars / 80 M2 / Number of Excavators required for categories are:
  1. First Category : 2 excavators
  2. Second excavators Category : 2
  3. Third Category : 1 excavator

FOURTH / 75.000 / 40.000 / 750.000 / 1.5 Million Dinars / Clerk, Accountant / Civil Engineer or Mich. Engineer,
Surveyor / projects in the amount of one Million Dinars / 50 M2 / Air Compressors, Trench Vibrator , Dumper, Water Tanker, Pipe
Cutter & Installation Equipment.
FIFTH / 20.000 / 20.000 / 250.000 / 500.000 / Clerk / Civil Engineer or Mich. Engineer,
Surveyor / projects in the amount of
25.000 Dinars / 30 M2

The Technical Manager: Civil Engineer.

Field of work / Specialization / Category / Paid Up
Capital / Value of
Equipments
Dinar / Maximum Project Value
Dinar / "Ceiling" Maxi.
Projects Value
Dinar / Admin. Staff / Full Time
Technical Staff / Experience - Completion of
Projects In fulfillment of the
Obligation In the Amount of / Office Area / Types of Equipments
WATER AND SEWER- AGE / Sewerage treatment plant / ------ / 400.000 / 150.000 / ------ / ------ / General manager
Admin. Manager
Fin. Manager
Accountant / Tech. Manager
Civil Engineer
Elec. Engineer or
Mich. Engineer / Sewerage treatment plant Projects in the amount of 6 Million Dinars / 150 M2 / Scooper, Excavators, Installation Equipments, Air compressors, pipe cutters, Roller, Vibrators, Concrete Mixers, Water Tankers, Dumpers, maintenance workshop, Welding Machines, Networks Maintenance equipments.
Drinking Water. Treatment and desalination plant / ------ / 300.000 / 150.000 / ------ / ------ / General manager
Admin. Manager
Fin. Manager
Accountant / Tech. Manager
(2) Engineers one of them would be Chemical Engineer / Drinking Water desalination projects. Number of projects not less than two the value of each of them not less than 400,000 Dinars / 150 M2 / Pumps, Air Compressors, Truck, Forklift, Pipe service Equipments, Testing Sets, Measurement Sets, Hand Tools sets.
Field of work / Specialization / Category / Paid Up
Capital / Value of
Equipments
Dinar / Maximum Project Value
Dinar / "Ceiling" Maxi.
Projects Value
Dinar / Admin. Staff / Full Time
Technical Staff / Experience - Completion of
Projects In fulfillment of the
Obligation In the Amount of / Office Area / Types of Equipments
Electro-
Mechanics / Electro-
Mechanics / FIRST / 300.000 / 50.000 / ------ / ------ / General manager
Admin. Manager
Fin. Manager
Accountant / Tech. Manager
(3) Engineers
Draftman / Completed Electro-Mechanical projects in amount of 8 Million Dinars of which completed Electrical projects in amount of 4 Million Dinars and completed Mechanical projects in amount of 4 Million Dinars. / 180 M2 / Planning & programming Systems (PRIMVIERA) or what equivalent & AUTO CAD PROGAMMES or what equivalent. Testing calibration , Measurement Sets for all Electro-Mechanical Systems, Electric and Diesel Welding Machines, Ducts Workshop, Threading Machine, Cable Pressors, Air Compressors, Scaffolds, Lifting Platforms, Bending Machines, Hand Tools including defferant types of drills , trucks and Generators.
SECOND / 200.000 / 30.000 / 2 Million Dinars / 3 Million Dinars / General manager
Admin. Manager
Accountant / Tech. Manager (2)
Engineers / Completed Electro-Mechanical projects in amount of 3 Million Dinars of which completed Electrical projects in amount of 1.5 Million Dinars and completed Mechanical projects in amount of1.5 Million Dinars. / 120 M2 / Testing and Measurement sets for all kind of the Electro-Mechanic systems, AUTOCAD, Electric and Diesel Welding Machines, Threading Machines, Cable Pressors ,Air Compressors, Scaffolds, Lifting Platforms, Bending Machines, Hand Tools.
.
THIRD / 100.000 / 15.000 / 500.000 / One Million Dinars / General manager
Accountant / Tech. Manager
One Engineer / Completed electronic-mechanical projects in amount of one Million Dinars. / 80 M2
  • The Technical Cadre should include Technical and Electrical Engineers.
  • Threading machines are necessary for the first, second and third categories electronic mechanism.