DEEP CLEANING CALENDAR

Monday

/ Tuesday / Wednesday / Thursday / Friday / Saturday / Sunday

DAY 1

/
DAY 2
/ DAY 3 / DAY 4 / DAY 5 / DAY 6 /

DAY 7

  • Airdyne Cooling Tower detailed
  • Hand Sinks
  • Prep Sink detailed
  • 3-Compartment Sink area
  • Condenser Coils on all Refrigeration
  • Change out Scraper Blades Machines 1-4
/
  • All Air Vents detailed
  • Window Sills
  • Floor Drains Detailed
  • Fruit Graphics panels Detailed
/
  • Detail Tables and table bases.
  • Detail inside bottom of refrigerators shelf
  • Walk-in Refrigerator
  • Scrub BOH Walls
  • Floor Drains
  • Refrigeration Gaskets detailed.
/
  • Ice machine(if applicable)
  • Mop Sink & Walls
  • Detail Lobby Chairs
  • Detail Mosaic Tile Wall
  • Dust Wall Graphics
  • Dust Flavor Cardholders
  • Detail baseboards
/
  • Scrub Front Door threshold
  • Floor Drain details
  • Trash cans & lids
  • Detail Floors with Baking Soda
  • Change mop head
/
  • High Dusting
  • 3-Compartment Sink/Walls
  • Replace burned out lights
  • Detail Pos and Scales
  • Detail Railings, Banisters
/
  • Detail Refrigerator Doors
  • Dry Storage: wall/shelves/floor
  • Detail inner wall of Yogurt Machines
  • Detail Lobby Walls

DAY 8

/ DAY 9 / DAY 10 / DAY 11 / DAY 12 / DAY 13 / DAY 14
  • Hand Sinks
  • Prep Sink detailed
  • 3-Compartment Sink area
  • Change out Scraper Blades Machines 5-8
/
  • All Air Vents detailed
  • Window Sills
  • Floor Drains Detailed
  • Fruit Graphics panels Detailed
/
  • Detail Tables and table bases.
  • Detail inside bottom of refrigerators shelf
  • Walk-in Refrigerator
  • Scrub BOH Walls
  • Kitchen Drains
  • Refrigeration Gaskets detailed.
/
  • Ice machine
  • Mop Sink & Walls
  • Detail Lobby Chairs
  • Detail Mosaic Tile Wall
  • Dust Wall Graphics
  • Dust Flavor Cardholders
  • Detail baseboards
/
  • Scrub Front Door threshold
  • Floor Drain details
  • Trash cans & lids
  • Detail Floors with Baking Soda
  • Change mop head
/
  • High Dusting
  • 3-Compartment Sink/Walls
  • Replace burned out lights
  • Detail Pos and Scales
  • Detail Railings, Banisters
/
  • Detail Refrigerator Doors
  • Dry Storage: wall/shelves/floor
  • Detail inner wall of Yogurt Machines
  • Detail Lobby Walls

DAY 15

/ DAY 16 / DAY 17 / DAY 18 / DAY 19 / DAY 20 / DAY 21
  • Hand Sinks
  • Prep Sink detailed
  • 3-Compartment Sink area
  • Change out Scraper Blades Machines 1-4
/
  • All Air Vents detailed
  • Window Sills
  • Floor Drains Detailed
  • Fruit Graphics panels Detailed
/
  • Detail Tables and table bases.
  • Detail inside bottom of refrigerators shelf
  • Scrub BOH Walls
  • Kitchen Drains
  • Refrigeration Gaskets detailed.
/
  • Ice machine
  • Mop Sink & Walls
  • Detail Lobby Chairs
  • Detail Mosaic Tile Wall
  • Dust Wall Graphics
  • Dust Flavor Cardholders
  • Detail baseboards
/
  • Scrub Front Door threshold
  • Floor Drain details
  • Trash cans & lids
  • Detail Floors with Baking Soda
  • Change mop head
/
  • High Dusting
  • 3-Compartment Sink/Walls
  • Replace burned out lights
  • Detail Pos and Scales
  • Detail Railings, Banisters
/
  • Detail Refrigerator Doors
  • Dry Storage: wall/shelves/floor
  • Detail inner wall of Yogurt Machines
  • Detail Lobby Walls

DAY 22

/ DAY 23 / DAY 24 / DAY 25 / DAY 26 / DAY 27 / DAY 28
  • Hand Sinks
  • Prep Sink detailed
  • 3-Compartment Sink area
  • Change out Scraper Blades Machines 5-8
/
  • All Air Vents detailed
  • Window Sills
  • Floor Drains Detailed
  • Fruit Graphics panels Detailed
/
  • Detail Tables and table bases.
  • Detail inside bottom of refrigerators shelf
  • Scrub BOH Walls
  • Kitchen Drains
  • Refrigeration Gaskets detailed.
/
  • Ice machine
  • Mop Sink & Walls
  • Detail Lobby Chairs
  • Detail Mosaic Tile Wall
  • Dust Wall Graphics
  • Dust Flavor Cardholders
  • Detail baseboards
/
  • Scrub Front Door threshold
  • Floor Drain details
  • Trash cans & lids
  • Detail Floors with Baking Soda
  • Change mop head
/
  • High Dusting
  • 3-Compartment Sink/Walls
  • Replace burned out lights
  • Detail Pos and Scales
  • Detail Railings, Banisters
/
  • Detail Refrigerator Doors
  • Dry Storage: wall/shelves/floor
  • Detail inner wall of Yogurt Machines
  • Detail Lobby Walls

Use as a guideline. Adjust as necessary to fit your location.

Confidential and Proprietary –Yogurtland

Deep Cleaning Calendar – SAFE Program

Revised September 2009