DEEP CLEANING CALENDAR
Monday
/ Tuesday / Wednesday / Thursday / Friday / Saturday / SundayDAY 1
/DAY 2
/ DAY 3 / DAY 4 / DAY 5 / DAY 6 /DAY 7
- Airdyne Cooling Tower detailed
- Hand Sinks
- Prep Sink detailed
- 3-Compartment Sink area
- Condenser Coils on all Refrigeration
- Change out Scraper Blades Machines 1-4
- All Air Vents detailed
- Window Sills
- Floor Drains Detailed
- Fruit Graphics panels Detailed
- Detail Tables and table bases.
- Detail inside bottom of refrigerators shelf
- Walk-in Refrigerator
- Scrub BOH Walls
- Floor Drains
- Refrigeration Gaskets detailed.
- Ice machine(if applicable)
- Mop Sink & Walls
- Detail Lobby Chairs
- Detail Mosaic Tile Wall
- Dust Wall Graphics
- Dust Flavor Cardholders
- Detail baseboards
- Scrub Front Door threshold
- Floor Drain details
- Trash cans & lids
- Detail Floors with Baking Soda
- Change mop head
- High Dusting
- 3-Compartment Sink/Walls
- Replace burned out lights
- Detail Pos and Scales
- Detail Railings, Banisters
- Detail Refrigerator Doors
- Dry Storage: wall/shelves/floor
- Detail inner wall of Yogurt Machines
- Detail Lobby Walls
DAY 8
/ DAY 9 / DAY 10 / DAY 11 / DAY 12 / DAY 13 / DAY 14- Hand Sinks
- Prep Sink detailed
- 3-Compartment Sink area
- Change out Scraper Blades Machines 5-8
- All Air Vents detailed
- Window Sills
- Floor Drains Detailed
- Fruit Graphics panels Detailed
- Detail Tables and table bases.
- Detail inside bottom of refrigerators shelf
- Walk-in Refrigerator
- Scrub BOH Walls
- Kitchen Drains
- Refrigeration Gaskets detailed.
- Ice machine
- Mop Sink & Walls
- Detail Lobby Chairs
- Detail Mosaic Tile Wall
- Dust Wall Graphics
- Dust Flavor Cardholders
- Detail baseboards
- Scrub Front Door threshold
- Floor Drain details
- Trash cans & lids
- Detail Floors with Baking Soda
- Change mop head
- High Dusting
- 3-Compartment Sink/Walls
- Replace burned out lights
- Detail Pos and Scales
- Detail Railings, Banisters
- Detail Refrigerator Doors
- Dry Storage: wall/shelves/floor
- Detail inner wall of Yogurt Machines
- Detail Lobby Walls
DAY 15
/ DAY 16 / DAY 17 / DAY 18 / DAY 19 / DAY 20 / DAY 21- Hand Sinks
- Prep Sink detailed
- 3-Compartment Sink area
- Change out Scraper Blades Machines 1-4
- All Air Vents detailed
- Window Sills
- Floor Drains Detailed
- Fruit Graphics panels Detailed
- Detail Tables and table bases.
- Detail inside bottom of refrigerators shelf
- Scrub BOH Walls
- Kitchen Drains
- Refrigeration Gaskets detailed.
- Ice machine
- Mop Sink & Walls
- Detail Lobby Chairs
- Detail Mosaic Tile Wall
- Dust Wall Graphics
- Dust Flavor Cardholders
- Detail baseboards
- Scrub Front Door threshold
- Floor Drain details
- Trash cans & lids
- Detail Floors with Baking Soda
- Change mop head
- High Dusting
- 3-Compartment Sink/Walls
- Replace burned out lights
- Detail Pos and Scales
- Detail Railings, Banisters
- Detail Refrigerator Doors
- Dry Storage: wall/shelves/floor
- Detail inner wall of Yogurt Machines
- Detail Lobby Walls
DAY 22
/ DAY 23 / DAY 24 / DAY 25 / DAY 26 / DAY 27 / DAY 28- Hand Sinks
- Prep Sink detailed
- 3-Compartment Sink area
- Change out Scraper Blades Machines 5-8
- All Air Vents detailed
- Window Sills
- Floor Drains Detailed
- Fruit Graphics panels Detailed
- Detail Tables and table bases.
- Detail inside bottom of refrigerators shelf
- Scrub BOH Walls
- Kitchen Drains
- Refrigeration Gaskets detailed.
- Ice machine
- Mop Sink & Walls
- Detail Lobby Chairs
- Detail Mosaic Tile Wall
- Dust Wall Graphics
- Dust Flavor Cardholders
- Detail baseboards
- Scrub Front Door threshold
- Floor Drain details
- Trash cans & lids
- Detail Floors with Baking Soda
- Change mop head
- High Dusting
- 3-Compartment Sink/Walls
- Replace burned out lights
- Detail Pos and Scales
- Detail Railings, Banisters
- Detail Refrigerator Doors
- Dry Storage: wall/shelves/floor
- Detail inner wall of Yogurt Machines
- Detail Lobby Walls
Use as a guideline. Adjust as necessary to fit your location.
Confidential and Proprietary –Yogurtland
Deep Cleaning Calendar – SAFE Program
Revised September 2009