FINALDRB DECISION PACKET
Harnett County, North Carolina
Planning Department
108 E. Front Street, Lillington, NC27546
Phone:(910)893-7525 Fax:(910) 893-2793
Development Name: 1st REGIONAL
Development Type: COMMERCAIL SITE PLAN REVIEW
Date:FEBRUARY 24, 2016
The above referenced application
SHORT TERM CONDITIONS, COMMENTS, OR JUSTIFICATIONS
The following conditions are to be rectified prior to obtaining DRB signature and are subject to change during the course of the meeting.
Engineering (910)893-7555 Amanda Bader,ApproveConditionally ApproveHoldDeny:
E911/Addressing (910)814-2038Environmental Health (910)893-7547Fire Marshal (910)893-7580Planning Department (910)893-7525Public Utilities (910)893-7575: Bill Lamm
ApproveHoldConditionally ApproveDeny:
GIS/E-911 Addressing (910)893-7523Environmental Health (910)893-7547Fire Marshal (910)893-7580Planning Department (910)893-7525Public Utilities (910)893-7575:
HoldConditionally ApproveApproveDeny: /
- Add SR 2411 to Plantation Dr on map and Vicinity Map
- NC 24/87 should be NC 24-87
- The correct site address is 1477 NC 24-87
E911/Addressing (910)814-2038Environmental Health (910)893-7547Fire Marshal (910)893-7580Planning Department (910)893-7525Public Utilities (910)893-7575: Jay Sikes, Landon Chandler ,
HoldConditionally ApproveApproveDeny: /
- Show 50’ front setback, & 25’ rear setback.
- Show 10’ Type C front landscaping buffer area.
- Provide bldg. elevations to ensure compliance with Hwy 87 architectural standards
- Note Land Use Classification = Employment Mixed Use
- Note hours & days of operation
- Add note that states “NC 87 Rd is on the Harnett County Comprehensive Transportation Plan”
- Add note that states “This development is within the five mile Military Corridor Overlay Zone, and may be subject to military training activities.”
- Add a note stating“All mechanical areas & trash containment areas located on, beside, or adjacent to any building shall be screened from the views of streets and adjacent property.”
- If applicable, sign should be setback at least 10’ from NCDOT right-of-way, and will require an additional review.
- Note who will be responsible for maintenance of the parking areas, drive aisles, and all landscape buffering.
- Note material of parking lot…concrete, asphalt,
- Parking areas with 30 or more spaces shall be separated from the building by a landscaped strip.
- Show required wheel stops in front of perimeter parking spaces, unless facing a raised sidewalk or curb of at least 18”.
- Show any site/ parking lot lighting. If building will have exterior mounted wall lighting packs, they shall be installed such that the fixture shall
- Site plan has been sent to Duke Energy for review.
- Provide a copy of the approved NCDOT driveway permit.
- Add an owner’s consent form. Example…
this site plan and all regulations and requirements of the Harnett County ordinances.
______
Date Owner Signature
E911/Addressing (910)814-2038Environmental Health (910)893-7547Fire Marshal (910)893-7580Planning Department (910)893-7525Public Utilities (910)893-7575: Shane Cummings
Conditionally ApproveHoldApproveDeny: /
- The Preliminary Plan Fee payment of $250 should be submitted to HCDPU.
- The calculated water and sewer usage should be noted on the site plan. These figures will assist with existing system impact analysis.
- The backflow preventer’s makes and models should be included on the site plans.
- The proposed water main extension must meet NCDOT requirements.
- The profile drawings do not show adequate separations between the new water main and existing infrastructure.
- HCDPU Utility notes must be included on the site plan construction packet.
- The existing sewer main along Hwy 24/87 should be labeled as 21inch.
- A NCDOT Encroachment Agreement must be obtained for the proposed utility extensions.
- The proposed 8" water main for this development must be permitted with the North Carolina Department of Environment & Natural Resources (NCDENR) - Division of Environmental Health, Public Water Supply Section (DEH, PWSS). The water line must be installed in accordance with the state approved plans.
- The water and sewer extension must be approved by HCDPU and all required permits from NCDENR must be received prior to installing infrastructure.
- Final Construction drawings must be submitted to HCDPU for review and approval prior to permitting with NCDENR. A construction fee payment of $40 per Residential Equivalent Unit must accompany the Plan Review Packet.
- All landscaping must be installed off of HCDPU easements and utility mains.
E911/Addressing (910)814-2038Environmental Health (910)893-7547Fire Marshal (910)893-7580Planning Department (910)893-7525Public Utilities (910)893-7575: Bryan McSwain, Oliver Tolksdorf,,
ApproveHoldConditionally ApproveDeny:
LONG RANGE CONDITIONS
The following conditions must be satisfied
- Must meet all requirements set forth by NC DENR. Contact at (910)433-3300.
Public Utilities (910)893-7575E911/Addressing (910)814-2038Environmental Health (910)893-7547Fire Marshal (910)893-7580Planning Department (910)893-7525: /
- Please visit for more information on the approval process.
- Capacity fees for the water and sewer must be paid prior to permits being processed for water and sewer extensions.
- Utility Improvements must be designed and installed in accordance with the latest Harnett County and State requirements.
- The proposed water main and the sanitary sewer collection lines for the proposed
- development must be installed by a licensed utility contractor and certified by the P.E. of record before the lots can be served by water and sanitary sewer.
- The Engineer of record must submit a material list to HCDPU with the Engineers approval that the materials meet HCDPU specifications.
- The EOR must submit all Engineering Final Documents prior to HCDPU approval of the water and sewer extensions.
- All existing Harnett County easements and proposed easements must be conveyed and recorded and noted on the proposed plat prior to activation of the utility system.
- Professional Engineer (P.E.) must provide HCDPU with a set of As-Built Record Drawings (in mylar, bond, and digital formats), the P.E. certification that the taps and associated utilities were installed in accordance with approved plans marked as "Released for Construction" by HCDPU.
- The Developer must provide HCDPU a Cost Statement indicating the cost to install the water lines (materials and labor) that will serve this site.
- The Utility Contractor must provide HCDPU with a one (1) year warranty on the water and sanitary sewer utilities to cover any and all repairs due to poor workmanship, defective materials or anything that does not meet HCDPU Standards and Specifications at the time the work was performed to install the water and sanitary sewer utilities.
- No services will be activated until all utilites are approved in accordance with State regulation and the latest HCDPU rules a regulations.
E911/Addressing (910)814-2038Environmental Health (910)893-7547Fire Marshal (910)893-7580Planning Department (910)893-7525Public Utilities (910)893-7575:
E911/Addressing (910)814-2038Environmental Health (910)893-7547Fire Marshal (910)893-7580Planning Department (910)893-7525Public Utilities (910)893-7575:
E911/Addressing (910)814-2038Environmental Health (910)893-7547Fire Marshal (910)893-7580Planning Department (910)893-7525Public Utilities (910)893-7575:
E911/Addressing (910)814-2038Environmental Health (910)893-7547Fire Marshal (910)893-7580Planning Department (910)893-7525Public Utilities (910)893-7575:
Development Review Board
Chairman
A FINAL copy, consisting of any corrections, etc., will be sent after the meeting.
Upon resubmittal, additional comments/ corrections may be required.
**Please remember all applicable fee’s**
- IfAPPROVED, your signed plat/plan may be picked up at the Planning Department or will be mailed to you within two (2) business days.
- IfAPPROVED WITH CONDITIONS, you must submit 5 copies of the plat/plan to the Planning Department showing that all items listed under Short Term Conditions have been rectified. Please be aware that review will not be done while you wait, as all DRB members will have to review the plat/plan for compliance.
- If HELD, you must submit 5 copies of the plat/plan showing that all items listed under Short Term Conditions have been rectified. To attend the next DRB meeting, revised plat/plans must be submitted by noon on Wednesday following the meeting the application was put on hold.
- IfDENIED, you may appeal the Board’s Decision to the Harnett County Planning Board within 30 days or meet with Planning Staff to discuss other potential options.
First Regional Decison Packet
11/4/2018
1