Wisconsin Center for Applied Microelectronics
1550 Engineering DrivePhone: 608/262-6877
Madison, WI 53706Fax: 608/265-2614
Tencor FLX-2320
Thin Film Stress Measurement
Rev. 8/27/2010
+
Material Restrictions:
All materials allowed for use in this equipment are listed in PDF form on the WCAM My Web Space. To view the listing following these steps:
- Open the UW website for My WebSpace.
 - Log on using your UW NetID and password.
 - Click on the star in the upper left corner.
 - Under Bookmarks click on Group Directories.
 - Scroll down the list of organizations to WCAM.
 - Click on WCAM.
 - Double click on the first file folder to open “Approved Materials.”
 - Double click on the WebsiteRpt to view the approved materials for equipment.
 - Within the PDF you can perform a search.
 
QUICK START to Tencor FLX-2320
Thin Film Stress Measurement
NOTES:
User needs 3.5” diskette for saving data files.
- The complete manual is available.
 
Pre-Check
- Turn ONMAIN switch of instrument located right on top panel.
 - Power ON to separate computer.
 - Turn ONNitrogen by turning valve in-line.
 
1st Measurement – Before Thin Film
- Open instrument and place appropriate sized wafer ring on stage with the notch towards user.
 - Center wafer on ring with flat at the ring notch.
 - At the computer, enter the FLEXUS software. Click on USER 1.
 - To check laser intensities:
Under UTILITIES in main menu choose PC PORTS DIAGNOSTICS.
670m Laser should read approximately SUM = 2.6 DIFF = 0.0 _ _
750m Laser should read approximately SUM = 3.0 DIFF = 0.0 _ _
If values are within range, exit DIAGNOSTIC screen. If not, SEE STAFF. - At main menu, choose MEASURE and in the submenu choose First (No Film).
 - On the First Measurement screen:
A. Check Process Program. To alter, from EDIT main menu choose PROCESS
PROGRAMS.
B. Name the FILE indicating A:\ as designated directory.
Or you can click on the FILES button.
C. Type an ID.
D. Add ORIENATION and COMMENTS if needed.
E. Click on the MEASURE button to execute. - For additional orientations, reposition wafer ring, edit First Measurement screen, and click MEASURE button.
 - When first measurements are complete, exit software and turn off nitrogen.
 
Measurement – After Thin Film Deposition
- Perform Pre-check and enter software.
 - Position sample on wafer ring.
 - From the MEASURE Main Menu choose from the following:
Single Stress  measurement after deposition[Section 4.1.3]
Stress – Time  measurement after deposition by time[Section 4.1.4]
Stress – Temp  measurement after deposition by temperature[Section 4.1.5] - When first measurements are complete, exit software and turn off nitrogen.
 
1
StressMeasurement.doc
