Power Delivery Projects
Occupational Health and Safety
Tender Evaluation Report
/Unique Id.
/PDPMAN-FM-121
Doc. Rev.
/2
Page 1 of 4ENQUIRY NO
NAME OF BUYER
PROJECT
SCOPE
CONTRACTOR/SUPPLIERName and Details
PURPOSE / To assess whether the above-mentioned supplier/s submitted the required occupational health and safety documentation as specified in the Enquiry referenced above, and that such occupational health and safety documentation complies with the specified requirements.
REFERENCE DOCUMENTATION
/SHE Specification, Form 74
Technical Evaluation Guideline GBEG 474-011
2.3 EVALUATION CRITERIAQUALITATIVE EVALUATION CRITERIA
DOCUMENT REQUIREMENTS FORM 74 (SHE Specification)REQUIREMENTS
/ WEIGHT AND SCORE 100 %Weighted 100
Actual / Applicable / Comment
SECTION A: ( HEALTH AND SAFETY LEGAL COMPLIANCE)
1. Signed and authorized OH& S Policy. / 1
2. Planning (Hazard Identification, Risk Assessment and controls) / 1
3. Objectives and targets / 1
4. Resources, Roles , Responsibility and Authority / 1
5. Competency, training and awareness / 1
6. Communication, participation and consultation / 1
7. Control of documents and records / 1
8. Emergency preparedness and response / 1
9. Performance measurement and monitoring / 1
10. Evaluation of compliance / 1
11. Non- conformity, corrective and preventative action / 1
12. Internal Audits / 1
13.Management review / 1
Weight = 40% / 13
SECTION B: SHE PLAN (As per SHE Specification Requirements)
1. SHE Plan (To demonstrate the following as minimum)
- Indication of SHE competencies and appointments, including duties and SHE responsibilities of appointed persons on site
- Training procedures and plan, including SHE induction
- Occupational hygiene.
- SHE communications and meetings, including daily safe task instructions and project safety meetings
- Management of sub-contractors and suppliers.
- Health and Safety inspections and audits
- Visible Felt Leadership Inspections by Contractor’s Managing Director and senior managers.
- Policy and programme of HIV & Aids shall be submitted to the client
- SHE surveillance, measurements and monitoring
- Operational control procedures
- Management of personal protective clothing
- Handle/Control of dangerous and hazardous substances.
- Design control (if applicable)
- High Risk activities
- Emergency preparedness, Evacuation and rescue plan
- Legal and other requirements.
- Housekeeping requirements
- Substance abuse management
- Document and record control
- Maintenance arrangements of machinery and equipment
- Workers welfare facilities
- Compliance to Cardinal rules(Implementation, monitoring,
- Risk Assessment ( Define process/method to be followed)
- Fall Protection Plan
- Incident Management
- Smoking policy
- Transportation of employees to and, from site.
- Health and Safety Organogram
Weight = 30% / 28
SECTION C : SHE FILE
1. Appointments / 1
2. Past Health and Safety Performance(12 months progressive) / 1
3. Valid Letter of Good Standing / 1
4. Inspections and Audits programme ( templates) / 1
5. Safe Work Procedures ( For all critical task/activities) / 1
6.Programme of Compliance to Cardinal Rules / 1
7. Baseline Risk Assessment / 1
8.Fall Protection plan ( where applicable) / 1
9.Fire Safety plan / 1
10. Workman’s compensation (number) / 1
11.Notification of construction (template) / 1
Weight = 15% / 11
SECTION D: Bill of Quantities (BOQ)
1. Cost allocation for Health and Safety Compliance. / 1
Weight = 15%
TOTAL SCORE / 53
FINAL SCORE
XXXXXXXXXX%
THRESHOLD
80%
Motivation for failing to attain maximum score in the evaluation above
No. / Requirement / IssueOCCUPATIONAL HEALTH AND SAFETY EVALUATOR
Name / Signature / DateEskom Holdings Limited Reg No 2002/015527/06