MnDOT Contract / Project Description / Apparent Successful Responder / Date1027407W06 / Twin Ports Interchange Layouts / Alliant Engineering, Inc. / 06/07/18
1027407W07 / Preliminary and Detail Design of Roundabout at TH 57 and TH 60 / Alliant Engineering, Inc. / 06/07/18
1027413W03 / District 7 Design Staff Augmentation / Sambatek, Inc. / 05/22/18
1027414W02 / Urban Reconstruction in the Cities of Halstad and Hendrum / Short Elliott Hendrickson, Inc. / 05/21/18
1027418W08 / Mill and Overlay Final Water Resources Plan Set Preparation / Toltz, King, Duvall, Anderson & Associates, Inc. / 05/21/18
1030794 / Paleface River to Half Moon Lake Final Design / LHB, Inc. / 05/21/18
1027418W07 / Sign, Signal & Lighting Standards Staff Augmentation / Toltz, King, Duvall, Anderson & Associates, Inc. / 05/11/18
1027418W06 / Twin Ports Interchange Hydraulics / Toltz, King, Duvall, Anderson & Associates, Inc. / 05/03/18
1027407W04 / City of Hallock Pre-Design / Alliant Engineering, Inc. / 04/26/18
1030681 / Two Harbors Lighting, Signals and ADA Inspector / SRF Consulting Group, Inc. / 04/23/18
1030650 / Final Design of I-35W Stormwater Storage Facility / Barr Engineering Company / 04/23/18
1027414W02 / Urban Reconstruction in the Cities of Halstad and Hendrum / Short Elliott Hendrickson, Inc. / 04/23/18
1030428 / New London, MN Reduced Conflict Intersection / SRF Consulting Group, Inc. / 04/23/18
1030539 / TH 210, TH 169 Contract Administration / WSB & Associates, Inc. / 04/23/18
1030567 / Design/Plans for SP 1806-76 (TH 210) Reclaim from Brainerd to Ironton / Isthmus Engineering, Inc. / 04/23/18
1028644 / Districtwide Signal Coordination SP 8823-302 / SRF Consulting Group, Inc. / 04/23/18
1029433 / Final Design Plans for Bituminous Reclamation on TH 55 / Widseth Smith Nolting & Associates, Inc. / 04/19/18
1029772 / South Bridge Inspector and Bridge Painting Inspector / WSB & Associates, Inc. / 04/19/18
1029597 / South Area Grading Inspector / Sambatek, Inc. / 04/19/18
1030679 / TH 1 Grading and Base Inspector / LHB, Inc. / 04/19/18
1030680 / Districtwide Bridge Painting Inspector #2 / Short Elliott Hendrickson, Inc. / 04/19/18
1027409W03 / TH 12 from TH 75 in Ortonville to TH 59: Reclaim, Shoulder Widening and Snow Plowing / HNTB Corporation / 03/26/18
1027418W05 / Sandstone Area Design / Toltz, King, Duvall, Anderson and Associates, Inc. / 03/26/18
1027414W04 / Four Rest Area Reconstruction and Expansion in Southeastern Minnesota / Short Elliott Hendrickson, Inc. / 03/20/18
1029773 / Districtwide Plant Inspections / Engineering Partners Company, LLC / 03/12/18
1029542 / I-494 Bloomington Strip Project / Short Elliott Hendrickson, Inc. / 02/20/18
1029393 / Preliminary Engineering, Geometric Layout, Environmental Documentation, and Detail Design for SP 6510-67 / SRF Consulting Group, Inc. / 02/02/18
1029757 / Final Design Plan Set – Reclaim Overlay, ADA, Turn Lanes and Lighting / Bolton and Menk, Inc. / 02/02/18
1029759 / TH 23 from North Jct. TH 65 in Mora to Jct. TH 107, Mill and Overlay, including Turn Lanes and Guardrail / SRF Consulting Group, Inc. / 02/02/18
1030139 / Construction Surveying – Staff Augmentation / Bolton and Menk, Inc. / 02/02/18
1027411W06 / Preliminary and Final Bridge Design – Bridges 82873 and 82874 / WSP USA, Inc. / 02/02/18
1027417W05 / Mankato Levee TH 169 / Stonebrooke Engineering, Inc. / 02/02/18
1027416W06 / TH 53 and Garfield Layouts for Twin Ports Interchange / Short Elliott Hendrickson, Inc. / 02/02/18
1029379 / Preliminary and Detail Design for US 63 & I-90 Interchange Ramps and Approach Roadways / Short Elliott Hendrickson, Inc. / 01/17/18
1028677 / Construction Inspection & Materials Sampling Testing / Bolton & Menk, Inc. / 01/17/18
1029266 / TH 6 Bituminous Mill and Overlay / Rani Engineering, Inc. / 01/17/18
1029472 / TH 55 Storm Water Tunnel Inspection and Design Project / CNA Consulting Engineers / 01/17/18
1029605 / TH 87 Plan design / Short Elliott Hendrickson, Inc. / 01/17/18
1029577 / Detail Design Plans for Pavement Rehabilitation on TH 14 from Tracy to Revere / HR Green, Inc. / 01/05/18
1027408W03 / TH 55 Mill and Overlay / HDR Engineering, Inc. / 12/22/17
1029607 / Detail Design for Highway Improvement Projects on TH 75 and 68 in SW MN / Widseth, Smith, Nolting and Associates, Inc. / 12/21/17
1027418w03 / Truck Parking Expansion at Fuller Lake Rest Area / Toltz, King, Duvall, Anderson and Associates, Inc. / 12/14/17
1027408w04 / TH 316 Alternative Designs / HDR Engineering, Inc. / 11/29/17
1027418w04 / Twin Ports Interchange Railyard Preliminary Bridge Plans / Toltz, King, Duvall, Anderson and Associates, Inc. / 11/29/17
1027417w04 / TH 13 Full Depth Reclamation in Scott County / Stonebrooke Engineering, Inc. / 11/29/17
1029541 / TH 55 Signal Optimization / Alliant Engineering, Inc. / 11/17/17
1029286 / Preliminary and Detail Design for SP 8707-92 and 1210-89 / Kadrmas Lee and Jackson, Inc. / 10/30/17
1027417W03 / Resurfacing and ADA Improvements in the City of Warren / Stonebrooke Engineering, Inc. / 10/30/17
1027411W04 / Final Plan Set for TH 99 / WSP USA, Inc. / 10/30/17
1028842 / Plan and CPM Schedule Review, Contract Time Determination / WSB & Associates, Inc. / 09/28/17
1028885 / Plan and CPM Schedule Review, Contract Time Determination / Bolton & Menk, Inc. / 09/28/17
05911W01 / Metro Staff Augmentation – Soil Sampling / HDR Construction Controls Corporation / 09/28/17
1028716 / Design Review Team on SP 4304-53 and 4304-96 / SRF Consulting Group, Inc / 09/28/17
05910W03 / Construction Contract Administration and Inspection of IDIQ Delineators / SRF Consulting Group, Inc. / 09/11/17
1027417W01 / TH 29 and TH 59 Passing Lanes Preliminary Design / Stonebrooke Engineering, Inc. / 09/11/17
1027414W03 / Environmental Work for Highway 14 / Short Elliott Hendrickson, Inc. / 09/11/17
102409W02 / TH 30 Box Culvert Replacements / HNTB Corporation / 09/11/17
05910W07 / High Bridge Construction Engineering Support and Mendota Staff Augmentation / SRF Consulting Group, Inc. / 09/07/17
1027410W01 / I-94 Unbonded Concrete Overlay Preliminary and Final Design / Kimley-Horn and Associates, Inc. / 08/24/17
05911W05 / Metro Soils Staff Augmentation / HDR Construction Control Corporation / 08/24/17
1027410W02 / Intersection of MN 1/US 59 and Regrade of MN 1 from CSAH 16 to Kinney Avenue / Kimley-Horn and Associates, Inc. / 08/14/17
1027407W03 / Heron Lake RCUT Project / Alliant Engineering, Inc. / 08/10/17
1027411W01 / Big Sandy to TH 200 Mill & Overlay / WSP USA Inc. / 08/10/17
1027957 / Preliminary Engineering for SP 4203-50 / SRF Consulting Group, Inc. / 08/02/17
1028241 / Geometric Layout, Environmental Coordination, and Public Coordination for Reduced Conflict Intersection Improvements at CR 90/37th Ave and 41st Ave on TH 71 in Willmar / Short Elliott Hendrickson, Inc. / 08/02/17
1028240 / Engineering Services for Geometric Layout and Detail Design for Bridge Replacement of Bridges 6572 and 5432 / TKDA, Inc. / 08/02/17
1027568 / London Road Traffic Study / Short Elliott Hendrickson, Inc. / 08/02/17
1027416W01 / Hydraulics Hydinfra-Traffic data Collection / Stantec Consulting Services, Inc. / 08/02/17
1027407W04 / TH 60 Final Plan Set / Alliant Engineering, Inc. / 08/02/17
1027413W01 / I-35W Pavement Rehabilitation / Sambatek, Inc. / 07/11/17
1028187 / Metro District Video Inspection Project / Hydro Klean, LLC / 07/11/17
1027409W01 / TH 12/92 Concept Development / HNTB Corporation / 06/26/17
1027407W02 / Traffic Sign Engineering Support / Alliant Engineering, Inc. / 06/15/17
1027407W01 / Rainer Bridge Replacement / Alliant Engineering, Inc. / 06/12/17
1027418W01 / Final Water Resources Design 494 Westbound Auxiliary Lane / TKDA, Inc. / 05/31/17
1027415W01 / Materials Design Recommendations for SP 7005-121 and Design Augmentation / SRF Consulting Group, Inc. / 05/31/17
1025959 / International Falls Urban Design / KLJ, Inc. / 05/31/17
1026462 / Fracture Critical Pier Caps Analysis, Repair Recommendations, and Final Plans: Bridge 69839, 69101, and 69102 / HNTB Corporation / 05/31/17
1027727 / Project Development for the Downtown Reconstruction of TH 13 from 4th Street to East Commercial Drive in Litchfield, MN / Bolton and Menk, Inc. / 05/18/17
100122W04 / Weight Station Improvement Projects I35-I90 / Alliant Engineering, Inc. / 05/03/17
1027408W01 / TH 36 MnPASS / HDR Engineering, Inc. / 05/03/17
1027455 / Detail Design Plans for SP 5906-40 in Pipestone, MN / HR Green, Inc. / 05/03/17
1027453 / Metro-Wide Lighting and Signal Pole Inspection / Fish & Associates / 05/03/17
1025958 / Stewart River Study, Layout and Environmental Documentation / LHB, Inc. / 05/03/17
1027408W02 / Reconstruction of TH 6 through Emily / HDR Engineering, Inc. / 05/03/17
1027248 / Project Development for the Downtown Reconstruction of TH 15 / Short Elliott Hendrickson, Inc. / 04/10/17
05915W05 / Construction Survey Crew Augmentation / Short Elliott Hendrickson, Inc. / 04/10/17
1027329 / South ADA and Concrete Inspector / SRF Consulting Group, Inc. / 03/29/17
1027330 / 1A Project Plant Inspector / Engineering Partners, LLC / 03/29/17
1027336 / Hibbing Signals and Lightning Inspector / SRF Consulting Group, Inc. / 03/29/17
1027337 / Hibbing and Virginia Plant Inspector / Engineering Partners, LLC / 03/29/17
1027435 / Eagles Nest G & B Inspector / Stonebrooke Engineering, Inc. / 03/29/17
1027371 / Willow River Staking / WSB & Associates, Inc. / 03/29/17
1000126W02 / TH 71 and County State Aid Highway 15 Roundabout in Park Rapids / Stonebrooke Engineering, Inc. / 03/29/17
1027071 / Bridge 39016 Final Design (Baudette/Rainy River) / Parsons Transportation Group, Inc. / 03/29/17
03729w11 / Reconstruction of TH 22 and CR 90 Intersection – South of Mankato / SRF Consulting Group, Inc. / 03/13/17
04486w13 / Baudette Bridge – Roadway Design / Stantec Consulting Services, Inc. / 03/13/17
1027342 / Cloquet Roundabout Design / SRF Consulting Group, Inc. / 03/13/17
1025809 / Construction Oversight of US 63 Mississippi River Bridge in City of Red Wing, MN / Short Elliott Hendrickson, Inc. / 02/21/17
04484w12 / 5th Street Pedestrian Bridge / Kimley-Horn and Associates, Inc. / 02/21/17
1026949 / Senior Inspector/Assisting Inspector Roadway and Bridge / Bolton & Menk, Inc. / 02/21/17
1026683 / Senior and Assisting Bridge Inspector – Staff Augmentation / WSB & Associates, Inc. / 02/21/17
1026210 / Public Relations Services for Construction of US 63 Mississippi River Bridge in Red Wing, Minnesota / HDR Engineering, Inc. / 02/06/17
1026080 / TH 12 and TH 25 Pavement Resurfacing Project / Widseth Smith Nolting, Inc. / 02/06/17
1026987 / Geometric Layout, Environmental Coordination, and Detail Design for Reduced Conflict Intersection Improvements on Highway 23 in Marshall, Minnesota / Isthmus Engineering / 02/06/17
1026491 / Whitewater State Park Culvert Studies and Design Services / LHB, Inc. / 02/06/17
1003223 / Wheaton Area Surfacing Project / Rani Engineering / 02/06/17
1026671 / Field and Plant Testing – Augmentation / American Engineering Testing, Inc. / 01/20/17
1026016 / TH I-35 Biwabick Urban Design / Widseth Smith Nolting, Inc. / 01/20/17
04484w08 / Urban Reconstruction in Bagely, Minnesota / Kimley-Horn & Associates, Inc. / 01/20/17
1026553 / TH 13 Signal Optimization / Alliant Engineering / 01/20/17
1026743 / I-35E QA/QC Review of Project Design and Special Provisions / WSB & Associates, Inc. / 12/29/16
1002866 / Grand Marais Design / LHB, Inc. / 12/29/16
1026529 / Geometric Layout and Env. Doc. for the Replacement of Lac Qui Parle Bridge 5380 / Short Elliot Hendrickson, Inc. / 12/06/16
1026249 / Intersection Control Evaluation (ICE) and Hydraulic Eng. for Reconstruction of TH 12 in Litchfield, MN / Bolton & Menk, Inc. / 12/06/16
1000122w05 / Moose Lake Roundabout Design / Alliant Engineering, Inc. / 11/29/16
1002293 / I-35 Snake River to Chisago County Line Unbonded Overlay / TKDA, Inc. / 11/07/16
1025928 / Geometric Layout and Detail Design Plans for SP 5108-12 and 5107-14 / TKDA, Inc. / 10/13/16
04487W14 / Truck Parking Expansion for St. Croix Travel Information Center / TKDA, Inc. / 10/13/16
1026429 / ADA Consultant Staff Augmentation - Design / WSB & Associates, Inc. / 09/29/16
1026319 / ADA Consultant Staff Augmentation - Design / TKDA / 09/29/16
1026318 / ADA Consultant Staff Augmentation - Design / Stonebrooke / 09/29/16
1026427 / ADA Consultant Staff Augmentation – Construction / Stonebrooke / 09/29/16
1003116 / ADA Consultant Staff Augmentation – Design / Karvakko Engineering / 09/01/16
1003118 / ADA Consultant Staff Augmentation – Design / WSN, Inc. / 09/01/16
1026428 / ADA Consultant Staff Augmentation – Construction / WSN, Inc. / 09/01/16
1002623 / I-35W Bridges and Transit Station / Short Elliott Hendrickson, Inc. / 08/17/16
1003210 / Detail Design Gateway New Ulm - Highway 14/15, SP 0804-81 / Bolton & Menk, Inc. / 08/05/16
04486W12 / Bridge Design SP2782-345 / Stantec Consulting Services Inc. / 08/04/16
04484W10 / Final Design- Bridge 69092 (Mission Creek) / Kimley Horn & Associates, Inc. / 08/03/16
1000124W01 / District Wide (D7) Pipe Repair / Parsons Brinckerhoff, Inc. / 07/26/16
1000128W02 / TH91 Planset – Final Design / Sambatek, Inc. / 07/26/16
1003337 / T.H. 169 Design Mt. Iron to Hoover Road in Virginia / Bolton & Menk, Inc. / 07/26/16