Taxpayers’ Transportation Accountability Act Notices

As required by the Taxpayers’ Transportation Accountability Act, Minnesota Statutes §161.3203, subdivision 3(b), MnDOT hereby provides public notice that it proposes to award privatization transportation contracts as follows:

MnDOT Contract / Project Description / Apparent Successful Responder / Date
1027407W06 / Twin Ports Interchange Layouts / Alliant Engineering, Inc. / 06/07/18
1027407W07 / Preliminary and Detail Design of Roundabout at TH 57 and TH 60 / Alliant Engineering, Inc. / 06/07/18
1027413W03 / District 7 Design Staff Augmentation / Sambatek, Inc. / 05/22/18
1027414W02 / Urban Reconstruction in the Cities of Halstad and Hendrum / Short Elliott Hendrickson, Inc. / 05/21/18
1027418W08 / Mill and Overlay Final Water Resources Plan Set Preparation / Toltz, King, Duvall, Anderson & Associates, Inc. / 05/21/18
1030794 / Paleface River to Half Moon Lake Final Design / LHB, Inc. / 05/21/18
1027418W07 / Sign, Signal & Lighting Standards Staff Augmentation / Toltz, King, Duvall, Anderson & Associates, Inc. / 05/11/18
1027418W06 / Twin Ports Interchange Hydraulics / Toltz, King, Duvall, Anderson & Associates, Inc. / 05/03/18
1027407W04 / City of Hallock Pre-Design / Alliant Engineering, Inc. / 04/26/18
1030681 / Two Harbors Lighting, Signals and ADA Inspector / SRF Consulting Group, Inc. / 04/23/18
1030650 / Final Design of I-35W Stormwater Storage Facility / Barr Engineering Company / 04/23/18
1027414W02 / Urban Reconstruction in the Cities of Halstad and Hendrum / Short Elliott Hendrickson, Inc. / 04/23/18
1030428 / New London, MN Reduced Conflict Intersection / SRF Consulting Group, Inc. / 04/23/18
1030539 / TH 210, TH 169 Contract Administration / WSB & Associates, Inc. / 04/23/18
1030567 / Design/Plans for SP 1806-76 (TH 210) Reclaim from Brainerd to Ironton / Isthmus Engineering, Inc. / 04/23/18
1028644 / Districtwide Signal Coordination SP 8823-302 / SRF Consulting Group, Inc. / 04/23/18
1029433 / Final Design Plans for Bituminous Reclamation on TH 55 / Widseth Smith Nolting & Associates, Inc. / 04/19/18
1029772 / South Bridge Inspector and Bridge Painting Inspector / WSB & Associates, Inc. / 04/19/18
1029597 / South Area Grading Inspector / Sambatek, Inc. / 04/19/18
1030679 / TH 1 Grading and Base Inspector / LHB, Inc. / 04/19/18
1030680 / Districtwide Bridge Painting Inspector #2 / Short Elliott Hendrickson, Inc. / 04/19/18
1027409W03 / TH 12 from TH 75 in Ortonville to TH 59: Reclaim, Shoulder Widening and Snow Plowing / HNTB Corporation / 03/26/18
1027418W05 / Sandstone Area Design / Toltz, King, Duvall, Anderson and Associates, Inc. / 03/26/18
1027414W04 / Four Rest Area Reconstruction and Expansion in Southeastern Minnesota / Short Elliott Hendrickson, Inc. / 03/20/18
1029773 / Districtwide Plant Inspections / Engineering Partners Company, LLC / 03/12/18
1029542 / I-494 Bloomington Strip Project / Short Elliott Hendrickson, Inc. / 02/20/18
1029393 / Preliminary Engineering, Geometric Layout, Environmental Documentation, and Detail Design for SP 6510-67 / SRF Consulting Group, Inc. / 02/02/18
1029757 / Final Design Plan Set – Reclaim Overlay, ADA, Turn Lanes and Lighting / Bolton and Menk, Inc. / 02/02/18
1029759 / TH 23 from North Jct. TH 65 in Mora to Jct. TH 107, Mill and Overlay, including Turn Lanes and Guardrail / SRF Consulting Group, Inc. / 02/02/18
1030139 / Construction Surveying – Staff Augmentation / Bolton and Menk, Inc. / 02/02/18
1027411W06 / Preliminary and Final Bridge Design – Bridges 82873 and 82874 / WSP USA, Inc. / 02/02/18
1027417W05 / Mankato Levee TH 169 / Stonebrooke Engineering, Inc. / 02/02/18
1027416W06 / TH 53 and Garfield Layouts for Twin Ports Interchange / Short Elliott Hendrickson, Inc. / 02/02/18
1029379 / Preliminary and Detail Design for US 63 & I-90 Interchange Ramps and Approach Roadways / Short Elliott Hendrickson, Inc. / 01/17/18
1028677 / Construction Inspection & Materials Sampling Testing / Bolton & Menk, Inc. / 01/17/18
1029266 / TH 6 Bituminous Mill and Overlay / Rani Engineering, Inc. / 01/17/18
1029472 / TH 55 Storm Water Tunnel Inspection and Design Project / CNA Consulting Engineers / 01/17/18
1029605 / TH 87 Plan design / Short Elliott Hendrickson, Inc. / 01/17/18
1029577 / Detail Design Plans for Pavement Rehabilitation on TH 14 from Tracy to Revere / HR Green, Inc. / 01/05/18
1027408W03 / TH 55 Mill and Overlay / HDR Engineering, Inc. / 12/22/17
1029607 / Detail Design for Highway Improvement Projects on TH 75 and 68 in SW MN / Widseth, Smith, Nolting and Associates, Inc. / 12/21/17
1027418w03 / Truck Parking Expansion at Fuller Lake Rest Area / Toltz, King, Duvall, Anderson and Associates, Inc. / 12/14/17
1027408w04 / TH 316 Alternative Designs / HDR Engineering, Inc. / 11/29/17
1027418w04 / Twin Ports Interchange Railyard Preliminary Bridge Plans / Toltz, King, Duvall, Anderson and Associates, Inc. / 11/29/17
1027417w04 / TH 13 Full Depth Reclamation in Scott County / Stonebrooke Engineering, Inc. / 11/29/17
1029541 / TH 55 Signal Optimization / Alliant Engineering, Inc. / 11/17/17
1029286 / Preliminary and Detail Design for SP 8707-92 and 1210-89 / Kadrmas Lee and Jackson, Inc. / 10/30/17
1027417W03 / Resurfacing and ADA Improvements in the City of Warren / Stonebrooke Engineering, Inc. / 10/30/17
1027411W04 / Final Plan Set for TH 99 / WSP USA, Inc. / 10/30/17
1028842 / Plan and CPM Schedule Review, Contract Time Determination / WSB & Associates, Inc. / 09/28/17
1028885 / Plan and CPM Schedule Review, Contract Time Determination / Bolton & Menk, Inc. / 09/28/17
05911W01 / Metro Staff Augmentation – Soil Sampling / HDR Construction Controls Corporation / 09/28/17
1028716 / Design Review Team on SP 4304-53 and 4304-96 / SRF Consulting Group, Inc / 09/28/17
05910W03 / Construction Contract Administration and Inspection of IDIQ Delineators / SRF Consulting Group, Inc. / 09/11/17
1027417W01 / TH 29 and TH 59 Passing Lanes Preliminary Design / Stonebrooke Engineering, Inc. / 09/11/17
1027414W03 / Environmental Work for Highway 14 / Short Elliott Hendrickson, Inc. / 09/11/17
102409W02 / TH 30 Box Culvert Replacements / HNTB Corporation / 09/11/17
05910W07 / High Bridge Construction Engineering Support and Mendota Staff Augmentation / SRF Consulting Group, Inc. / 09/07/17
1027410W01 / I-94 Unbonded Concrete Overlay Preliminary and Final Design / Kimley-Horn and Associates, Inc. / 08/24/17
05911W05 / Metro Soils Staff Augmentation / HDR Construction Control Corporation / 08/24/17
1027410W02 / Intersection of MN 1/US 59 and Regrade of MN 1 from CSAH 16 to Kinney Avenue / Kimley-Horn and Associates, Inc. / 08/14/17
1027407W03 / Heron Lake RCUT Project / Alliant Engineering, Inc. / 08/10/17
1027411W01 / Big Sandy to TH 200 Mill & Overlay / WSP USA Inc. / 08/10/17
1027957 / Preliminary Engineering for SP 4203-50 / SRF Consulting Group, Inc. / 08/02/17
1028241 / Geometric Layout, Environmental Coordination, and Public Coordination for Reduced Conflict Intersection Improvements at CR 90/37th Ave and 41st Ave on TH 71 in Willmar / Short Elliott Hendrickson, Inc. / 08/02/17
1028240 / Engineering Services for Geometric Layout and Detail Design for Bridge Replacement of Bridges 6572 and 5432 / TKDA, Inc. / 08/02/17
1027568 / London Road Traffic Study / Short Elliott Hendrickson, Inc. / 08/02/17
1027416W01 / Hydraulics Hydinfra-Traffic data Collection / Stantec Consulting Services, Inc. / 08/02/17
1027407W04 / TH 60 Final Plan Set / Alliant Engineering, Inc. / 08/02/17
1027413W01 / I-35W Pavement Rehabilitation / Sambatek, Inc. / 07/11/17
1028187 / Metro District Video Inspection Project / Hydro Klean, LLC / 07/11/17
1027409W01 / TH 12/92 Concept Development / HNTB Corporation / 06/26/17
1027407W02 / Traffic Sign Engineering Support / Alliant Engineering, Inc. / 06/15/17
1027407W01 / Rainer Bridge Replacement / Alliant Engineering, Inc. / 06/12/17
1027418W01 / Final Water Resources Design 494 Westbound Auxiliary Lane / TKDA, Inc. / 05/31/17
1027415W01 / Materials Design Recommendations for SP 7005-121 and Design Augmentation / SRF Consulting Group, Inc. / 05/31/17
1025959 / International Falls Urban Design / KLJ, Inc. / 05/31/17
1026462 / Fracture Critical Pier Caps Analysis, Repair Recommendations, and Final Plans: Bridge 69839, 69101, and 69102 / HNTB Corporation / 05/31/17
1027727 / Project Development for the Downtown Reconstruction of TH 13 from 4th Street to East Commercial Drive in Litchfield, MN / Bolton and Menk, Inc. / 05/18/17
100122W04 / Weight Station Improvement Projects I35-I90 / Alliant Engineering, Inc. / 05/03/17
1027408W01 / TH 36 MnPASS / HDR Engineering, Inc. / 05/03/17
1027455 / Detail Design Plans for SP 5906-40 in Pipestone, MN / HR Green, Inc. / 05/03/17
1027453 / Metro-Wide Lighting and Signal Pole Inspection / Fish & Associates / 05/03/17
1025958 / Stewart River Study, Layout and Environmental Documentation / LHB, Inc. / 05/03/17
1027408W02 / Reconstruction of TH 6 through Emily / HDR Engineering, Inc. / 05/03/17
1027248 / Project Development for the Downtown Reconstruction of TH 15 / Short Elliott Hendrickson, Inc. / 04/10/17
05915W05 / Construction Survey Crew Augmentation / Short Elliott Hendrickson, Inc. / 04/10/17
1027329 / South ADA and Concrete Inspector / SRF Consulting Group, Inc. / 03/29/17
1027330 / 1A Project Plant Inspector / Engineering Partners, LLC / 03/29/17
1027336 / Hibbing Signals and Lightning Inspector / SRF Consulting Group, Inc. / 03/29/17
1027337 / Hibbing and Virginia Plant Inspector / Engineering Partners, LLC / 03/29/17
1027435 / Eagles Nest G & B Inspector / Stonebrooke Engineering, Inc. / 03/29/17
1027371 / Willow River Staking / WSB & Associates, Inc. / 03/29/17
1000126W02 / TH 71 and County State Aid Highway 15 Roundabout in Park Rapids / Stonebrooke Engineering, Inc. / 03/29/17
1027071 / Bridge 39016 Final Design (Baudette/Rainy River) / Parsons Transportation Group, Inc. / 03/29/17
03729w11 / Reconstruction of TH 22 and CR 90 Intersection – South of Mankato / SRF Consulting Group, Inc. / 03/13/17
04486w13 / Baudette Bridge – Roadway Design / Stantec Consulting Services, Inc. / 03/13/17
1027342 / Cloquet Roundabout Design / SRF Consulting Group, Inc. / 03/13/17
1025809 / Construction Oversight of US 63 Mississippi River Bridge in City of Red Wing, MN / Short Elliott Hendrickson, Inc. / 02/21/17
04484w12 / 5th Street Pedestrian Bridge / Kimley-Horn and Associates, Inc. / 02/21/17
1026949 / Senior Inspector/Assisting Inspector Roadway and Bridge / Bolton & Menk, Inc. / 02/21/17
1026683 / Senior and Assisting Bridge Inspector – Staff Augmentation / WSB & Associates, Inc. / 02/21/17
1026210 / Public Relations Services for Construction of US 63 Mississippi River Bridge in Red Wing, Minnesota / HDR Engineering, Inc. / 02/06/17
1026080 / TH 12 and TH 25 Pavement Resurfacing Project / Widseth Smith Nolting, Inc. / 02/06/17
1026987 / Geometric Layout, Environmental Coordination, and Detail Design for Reduced Conflict Intersection Improvements on Highway 23 in Marshall, Minnesota / Isthmus Engineering / 02/06/17
1026491 / Whitewater State Park Culvert Studies and Design Services / LHB, Inc. / 02/06/17
1003223 / Wheaton Area Surfacing Project / Rani Engineering / 02/06/17
1026671 / Field and Plant Testing – Augmentation / American Engineering Testing, Inc. / 01/20/17
1026016 / TH I-35 Biwabick Urban Design / Widseth Smith Nolting, Inc. / 01/20/17
04484w08 / Urban Reconstruction in Bagely, Minnesota / Kimley-Horn & Associates, Inc. / 01/20/17
1026553 / TH 13 Signal Optimization / Alliant Engineering / 01/20/17
1026743 / I-35E QA/QC Review of Project Design and Special Provisions / WSB & Associates, Inc. / 12/29/16
1002866 / Grand Marais Design / LHB, Inc. / 12/29/16
1026529 / Geometric Layout and Env. Doc. for the Replacement of Lac Qui Parle Bridge 5380 / Short Elliot Hendrickson, Inc. / 12/06/16
1026249 / Intersection Control Evaluation (ICE) and Hydraulic Eng. for Reconstruction of TH 12 in Litchfield, MN / Bolton & Menk, Inc. / 12/06/16
1000122w05 / Moose Lake Roundabout Design / Alliant Engineering, Inc. / 11/29/16
1002293 / I-35 Snake River to Chisago County Line Unbonded Overlay / TKDA, Inc. / 11/07/16
1025928 / Geometric Layout and Detail Design Plans for SP 5108-12 and 5107-14 / TKDA, Inc. / 10/13/16
04487W14 / Truck Parking Expansion for St. Croix Travel Information Center / TKDA, Inc. / 10/13/16
1026429 / ADA Consultant Staff Augmentation - Design / WSB & Associates, Inc. / 09/29/16
1026319 / ADA Consultant Staff Augmentation - Design / TKDA / 09/29/16
1026318 / ADA Consultant Staff Augmentation - Design / Stonebrooke / 09/29/16
1026427 / ADA Consultant Staff Augmentation – Construction / Stonebrooke / 09/29/16
1003116 / ADA Consultant Staff Augmentation – Design / Karvakko Engineering / 09/01/16
1003118 / ADA Consultant Staff Augmentation – Design / WSN, Inc. / 09/01/16
1026428 / ADA Consultant Staff Augmentation – Construction / WSN, Inc. / 09/01/16
1002623 / I-35W Bridges and Transit Station / Short Elliott Hendrickson, Inc. / 08/17/16
1003210 / Detail Design Gateway New Ulm - Highway 14/15, SP 0804-81 / Bolton & Menk, Inc. / 08/05/16
04486W12 / Bridge Design SP2782-345 / Stantec Consulting Services Inc. / 08/04/16
04484W10 / Final Design- Bridge 69092 (Mission Creek) / Kimley Horn & Associates, Inc. / 08/03/16
1000124W01 / District Wide (D7) Pipe Repair / Parsons Brinckerhoff, Inc. / 07/26/16
1000128W02 / TH91 Planset – Final Design / Sambatek, Inc. / 07/26/16
1003337 / T.H. 169 Design Mt. Iron to Hoover Road in Virginia / Bolton & Menk, Inc. / 07/26/16