IPIC Data Requirements

CONTENTS

DRPage

MA12Certification of Flight Readiness (CoFR)......

MI01Standard Payload Integration Agreement (SPIA) for Pressurized Payloads......

MI02Payload Integration Agreement (PIA) Increment Addendum Blank
Book for Pressurized Payloads......

MI03Standard Payload Integration Agreement (SPIA) for Unpressurized Payloads......

MI04Payload Integration Agreement (PIA) Increment Addendum Blank
Book for Un-pressurized Payloads......

MI05Standard Payload Integration Agreement (SPIA) for Small
Pressurized Payloads......

MI06Payload Integration Agreement (PIA) Blank Book for Small
Pressurized Payloads......

MI07Payload Data Sets Blank Book......

MI08ISS Payload Integration Template......

MI09IDRD Annex 5 Payload Tactical Plan Blank Book......

MI10ISS Program Payloads CoFR Implementation Plan......

MI11Increment Unique IDRD Annex 5 Payload Tactical Plan......

MI12Payload Unique Payload Integration Agreements......

MI13ISS Payload Information Source Compact Disk (CD)/Website......

MI14Payload Unique Payload Integration Agreement Increment
Addenda......

PA02Standard Program Implementation Plan, Volume IV: Payload
Engineering Integration......

PA16Unique Pressurized Payload Hardware Interface Control
Documents......

PA18Unique Attached Payload Hardware Interface Control
Documents......

PA26Unique Pressurized Payload Non-Rack Hardware Interface Control Documents......

RA01ISS Payload Interface Fault Tolerance Document......

DRPage

SA01Safety and Mission Assurance Plan......

SA02Safety Compliance Data......

SA03Industrial Safety Plan......

SA05Mishap Reports......

SE47EXPRESS Payload EIA, ICD, and Verification Plan......

SE55EXPRESS Integration Agreement Blank Book......

SE57Mission Integration Process Plan......

FP02Integrated Payload Rack Structural Analysis Reports......

LS10EXPRESS Payload Accommodations Handbook......

PA03Payload Verification Program Plan......

PA04Payload Flight Equipment Requirements and Guidelines For Safety Critical Structures......

PA06Pressurized Payloads Interface Requirements Document......

PA07Pressurized Payloads Hardware Interface Control Document
Template......

PA09Attached Payload Interface Requirements Document......

PA10Attached Payloads Hardware Interface Control Document
Template......

PA11Pressurized Payloads Accommodations Handbook......

PA12Attached Payloads Accommodations Handbook......

PA14Element Level and Truss Level Payload Engineering Analysis
Reports......

PA15ISS Level Payload Engineering Integration Reports......

PA19Payload Operations Guidelines and Constraints Document......

PA20Verification Reports......

PA21Integrated Drawings/Schematics......

PA22Payload Stage Configuration Drawing......

PA25Pressurized Payload Non-Rack ICD Template......

PA27Increment Capability Reports......

DRPage

SE31Engineering Integration Reports......

SE44EXPRESS Interface Definition Documents......

SE46Generic EXPRESS Payload Verification Plan......

SE56WORF Payload Integration Handbook......

SE59EXPRESS Transportation Agreement......

PM01Program Management Plan......

CM01Configuration Management Plan......

MA01Work Breakdown Structure and Dictionary......

MA06Performance Measurement System Plan......

MA21Workplan Reporting......

MA22Work Plan......

PC01NF533M......

PC02Cost Performance Report (CPR)......

PC03Integrated Financial Review Products......

PC04 WAGE/SALARY AND FRINGE BENEFIT DATA…………………………………………….. 86

UT50Documentation, Customer Analytical Integration Capability......

OD11Payload Operations Integration Center Payload Operations
Handbook......

OD38Payload Simulation Guidelines Document......

OD39Payload Ground Support Personnel Training and Certification
Plan......

OP13Payload Operations Data File Products......

OP24Payload Systems Manual......

OP25POIC Ground Command Procedures Book......

PA08Payloads Software Interface Control Document Template......

PA17Unique Payload Software Interface Control Documents......

RA02Payload MDM Users Manual......

RA03International Standard Payload Rack to ISS Software ICD......

RA04Payload MDM Configuration Files and PCS Displays......

DRPage

RA10Payload Product Integrated List (PPIL)......

RA11Payload Support Displays and Payload Unique Displays Software Requirements Specifications

SE49Payload Data Library (PDL) Users Guide......

SE50Payload Data Library Requirements Document......

SW01Payloads Software Management Plan......

SW15 EXPRESS Configuration Files......

UT32PSIVF Flight Products Verification Documents......

UT34Payload Software Integration and Verification Facility Prime Item Development Specification.

UT39Software Version Description Document (VDD), Software and
Data Item Package......

CM09Specifications......

CM11Acceptance Data Package......

CM12Modification Kit......

FP04ISPR Structural Integrator’s Handbook......

FP05ARIS User’s Handbook......

FP06ARIS-to-Payload ICD......

FP21PaRIS to ISPR ICD......

LS12Consolidated Payloads Logistics and Maintenance Plan......

LS13Consolidated Payloads Logistics Support Analysis Record (LSAR)
Data and Reports......

LS14Consolidated Payloads Operations and Organizational
Maintenance (O&M) Manuals......

LS16Biological Research Project (BRP) Operations and Maintenance
Manuals......

RM03NASA ALERT System Documentation......

RM06Electrical, Electronic, and Electromechanical Parts Program
Plan......

SE58Consolidated Sustaining Engineering Plan......

DRPage

SV03Traceability, Verification Requirements......

SW12Payload Integrated Flight Load (PIFL) Version Description Drawing......

UT33Payload Rack Checkout Unit (PRCU) Prime Item Development
Specification......

UT35Suitcase Test Environment for Payload Critical Item Development Specification......

UT41User’s Guides......

UT42 PRCU and STEP Maintenance Plans......

UT60PRCU Training Manual......

DR Index
Team / DR Number / DR Title / Data Type / SOW Cross-reference
MI / MA12 / Certificate of Flight Readiness / 3 / 1.2.1.14
MI / MI01 / Standard Payload Integration Agreement (SPIA) for Pressurized Payloads / 1 / 1.2.1.9
MI / MI02 / Payload Integration Agreement (PIA) Increment Addendum Blank Book for Pressurized Payloads / 1 / 1.2.1.9
MI / MI03 / SPIA for Un-pressurized Payloads / 1 / 1.2.1.9
MI / MI04 / PIA Increment Addendum Blank Book for Un-pressurized Payloads / 1 / 1.2.1.9
MI / MI05 / SPIA for Small Pressurized Payloads / 1 / 1.2.1.9
MI / MI06 / PIA Blank Book for Small Pressurized Payloads / 1 / 1.2.1.9
MI / MI07 / Payload Data Sets Blank Book / 1 / 1.2.1.9
MI / MI08 / ISS Payload Integration Template / 1 / 1.2.1.9
MI / MI09 / IDRD Annex 5 Payload Tactical Plan Blank Book / 1 / 1.2.1.9
1.2.1.17
MI / MI10 / ISS Program Payloads CoFR Implementation Plan / 1 / 1.2.1.9
MI / MI11 / Increment Unique IDRD Annex 5 Payload Tactical Plan / 1 / 1.2.1.9
1.2.1.17
MI / MI12 / Payload Unique Payload Integration Agreements / 1 / 1.2.1.9
MI / MI13 / ISS Payload Information Source CD/Website / 3 / 1.2.1.9
MI / MI14 / Payload Unique Payload Integration Agreement Increment Addenda / 1 / 1.2.1.9
MI / PA02 / Standard Program implementation Plan, Volume IV: Payload Engineering Integration / 1 / 1.3.1.1
MI / PA16 / Unique Pressurized Payload Hardware Interface Control Documents / 1 / 1.2.1.24
MI / PA18 / Unique Attached Payload Hardware Interface Control Document / 1 / 1.2.1.24
MI / PA26 / Unique Pressurized Payload Non-Rack Hardware Interface Control Document / 1 / 1.2.1.24
MI / RA01 / ISS Payload Interface Fault Tolerance Document / 1 / 1.2.2.13
1.4.1.4
MI / SA01 / S&MA Plan / 1 / 1.2.2
1.8.1
1.8.2
MI / SA02 / Safety Compliance Data / 1 / 1.2.2.6
1.2.2.8
MI / SA03 / Industrial Safety Plan / 2 / 1.2.2
MI / SA05 / Mishap Reports / 3 / 1.2.2
1.8.10.1
MI / SE47 / EXPRESS Payload EIA/PIA, ICD, and Verification Plans / 1 / 1.2.1.24
1.3.2.2
MI / SE55 / EXPRESS Integration Agreement Blank Book / 1 / 1.2.1.9
MI / SE57 / Mission Integration Process Plan / 3 / 1.2.1.12
1.4.1.29
PEI / FP02 / Integrated Payload Rack Structural Analysis Reports / 3 / 1.3.2.25
PEI / LS10 / Payload Accommodation Handbook / 3 / 1.3.2.10
PEI / PA03 / Payload Verification Program Plan / 1 / 1.3.2.9
PEI / PA04 / Payload Flight Equipment Requirements and Guidelines for Safety Critical Structures / 1 / 1.3.2.8
PEI / PA06 / Pressurized Payloads Interface Requirements Document / 1 / 1.3.2.1
PEI / PA07 / Pressurized Payloads Hardware Interface Control Document Template / 1 / 1.3.2.2
PEI / PA09 / Attached Payload Interface Requirements Document / 1 / 1.3.2.1
PEI / PA10 / Attached Payloads Hardware Interface Control Document Template / 1 / 1.3.2.2
PEI / PA11 / Pressurized Payloads Accommodations Handbook / 3 / 1.3.2.10
PEI / PA12 / Attached Payloads Accommodations Handbook / 3 / 1.3.2.10
PEI / PA14 / Element Level and Truss Level Payload Engineering Analysis Reports / 3 / 1.3.3.3
PEI / PA15 / ISS Level Payload Engineering Integration Reports / 3 / 1.3.3.4
PEI / PA19 / Payload Operations Guidelines and Constraints Document / 3 / 1.3.3.5
PEI / PA20 / Verification Reports / 3 / 1.3.2.5
PEI / PA21 / Integrated Drawings/Schematics / 3 / 1.3.3.8
PEI / PA22 / Payload Stage Configuration Drawing / 3 / 1.3.3.8
PEI / PA25 / Pressurized Payload Non-Rack ICD Template / 3 / 1.3.2.2
PEI / PA27 / Level Increment Capability Reports / 3 / 1.3.3.6
PEI / SE31 / Engineering Integration Reports / 3 / 1.3.3.1
1.3.3.5
1.3.3.8
1.3.3.9
1.3.3.10
PEI / SE44 / EXPRESS IDDs / 1 / 1.3.2.1
PEI / SE46 / Generic EXPRESS Payload Verification Plans / 1 / 1.3.2.4
PEI / SE56 / WORF Payload Integration Handbook / 1 / 1.2.1.9
1.3.2.1
1.3.2.4
1.3.2.10
PEI / SE59 / EXPRESS Transportation Agreement / 1 / 1.3.2.14
PM / PM01 / Program Management Plan / 3 / 1.1.1
PM / CM01 / Configuration Management Plan / 3 / 1.1.4
PM / MA01 / WBS / 1 / 1.1.1.1
PM / MA06 / PMS Plan / 1 / 1.1.1.3
PM / MA21 / Workplan Reporting / 3 / 1.1.3
PM / MA22 / Work Plan / 3 / 1.1.1.4
PM / PC01 / NF533M / 2 / 1.1.1.2
PM / PC02 / Cost Performance Report (CPR) / 2 / 1.1.1.3
PM / PC03 / Integrated Financial Review Products / 2 / 1.1.3
PM / PC04 / Wage/Salary and Fringe Benefit Data / 3 / N/A
PM / UT50 / Documentation, Customer Analytical Integration Capability / 3 / 1.1.9
POI / OD11 / Payload Operations Integration Center Payload Operations Handbook / 3 / 1.6.7.1
1.6.16.1
POI / OD38 / Payload Simulation Guidelines Document / 3 / 1.6.13.9
POI / OD39 / Payload Ground Support Personnel Training and Certification Plan / 3 / 1.6.13.4
1.6.13.8
POI / OP13 / Products, Payload Operations Data File / 3 / 1.6.15.5
POI / OP24 / Payload Systems Manual / 3 / 1.6.14.5
POI / OP25 / POIC Ground Command Procedures Book / 3 / 1.6.9.14
1.6.14.5
PSI / PA08 / Payloads Software Interface Control Document Template / 1 / 1.4.1.3
PSI / PA17 / Unique Payload Software Interface Control Documents / 1 / 1.4.1.2
PSI / RA02 / Payload MDM Users Manual / 3 / 1.4.1.6
PSI / RA03 / International Standard Payload Rack to ISS ICD, Part 1 / 1 / 1.4.1.3
PSI / RA04 / Payload MDM Configuration Files and PCS Displays / 3 / 1.4.1.15
PSI / RA10 / Payload Product Integrated List / 3 / 1.4.1.5
PSI / RA11 / Payload Support Displays Software Requirements Specification / 1 / 1.4.1.4
PSI / SE49 / Payload Data Library (PDL) Users Guide / 2 / 1.4.1.28
PSI / SE50 / Payload Data Library Requirements Document / 1 / 1.4.1.28
PSI / SE53 / DELETED
PSI / SE54 / DELETED
PSI / SW01 / Payloads Software Management Plan / 1 / 1.4.1.22
PSI / SW15 / EXPRESS Configuration Files / 3 / 1.4.1.15
PSI / UT32 / Payload Flight Applications Software Design and Verification Requirements Document / 3 / 1.4.1.17
PSI / UT34 / Payload Software Integration and Verification Facility Prime Item Development Specification / 2 / 1.4.1.20
PSI/PSS / UT39 / Software Version Description Document (VDD), Software and Data Item Package / 3 / 1.4.1.16
1.7.1.1
PSS / CM09 / Specifications / 1 / 1.7.3.1
PSS / CM11 / Acceptance Data Packages / 1 / 1.7.3.1
PSS / CM12 / Modification Kits / 3 / 1.7.1.1
PSS / FP04 / ISPR Structural Integrator’s Handbook / 3 / 1.3.2.25
PSS / FP05 / ARIS User’s Handbook / 3 / 1.5.2.1
PSS / FP06 / ARIS-to-Payload ICD / 1 / 1.5.2.2
PSS / FP09 / DELETED
PSS / FP21 / PaRIS-to-ISPR ICD / 1 / 1.5.2.3
PSS / FP43 / DELETED
PSS / LS12 / Consolidated Payloads Logistics and Maintenance Plan / 2 / 1.7.2.1
PSS / LS13 / Consolidated LSAR Data and Reports / 2 / 1.7.2.3
PSS / LS14 / O&M Manuals / 2 / 1.7.2.4
PSS / LS16 / BRP O&M Manuals / 2 / 1.7.2.4
PSS / RM03 / NASA ALERT System Documentation / 3 / 1.8.8.1
PSS / RM06 / EEE Parts Program Plan / 1 / 1.7.2.5
PSS / SE58 / Consolidated Sustaining Engineering Plan / 3 / 1.7.1.1
PSS / SV03 / Verification Requirements Traceability / 2 / 1.7.3.1
PSS / SW12 / Payload Integrated Flight Load VDD / 3 / 1.7.1.1
PSS / UT33 / Payload Rack Checkout Unit (PRCU) Prime Item Development Specification / 2 / 1.5.3.1.5
PSS / UT35 / Suitcase Test Environment for Payloads Critical Item Development Specification / 2 / 1.5.3.1.5
PSS / UT41 / User’s Guides / 3 / 1.5.3.1.6
PSS / UT42 / Maintenance Plans / 3 / 1.5.3.1.6
PSS / UT60 / PRCU Training Manual / 3 / 1.5.3.1.11

1

DATA REQUIREMENTS DESCRIPTION

1.DR: MA12, Certification of Flight Readiness (CoFR)

2.DRD Extension Number (s): None.

3.TPR Code: OZ

4.Data Type: 3

5.Frequency of Submission: For each flight and stage that supports payloads at L-6 weeks.

6.First Submission Date: Per negotiated work plan.

7.As-of-Date: N/A

8.Copies and Distribution:

Record:1 Data Management, OL3

Copies:Program-Authorized Electronic Library (PALS) or follow-on system
MSFC POIF PM

9.Remarks: None.

10.Use: This DR defines the responsibilities, processes, and procedures that the PSS, POIF, PSI, PEI, PD/RPO, POD, KSC, MSFC and JSC will utilize to certify payload safety and operational readiness as required by the ISS Payloads Office.

11.References: SOW paragraph 1.2.1.14.

12.Interrelationships: None.

13.Preparation Information: Submittals shall be prepared and delivered in accordance with contract requirements.

13.1.Scope: This DR establishes the preparation and maintenance requirements for the Certification of Flight Readiness (COFR). This includes flight and stage specific CoFR implementation focused on Launch Package Assessment (LPA) and Stage Operation Requirements Review (SORR). A formal and disciplined process with readiness certification statements is required by the ISS Program Manager to support flight readiness decisions on ISS payloads and organizations for flight, increment, on-orbit and return.

13.2Applicable Documents: SSP 52054 latest revision; Reference Documents: None.

13.3Contents: Certification of items per flight and stage must be included in accordance with SSP 52054 Latest Revision. This includes:

13.3.1CoFR endorsements for all Utilization Hardware for launch, including integrated racks

13.3.2CoFR endorsements for Utilization Hardware remaining on-orbit from the previous stage

13.3.3CoFR for descent Utilization Hardware

13.3.4Stage-specific Open Work Tracking Log

13.4Format: Per SSP 52054, latest revision.

13.5Maintenance: Updated for any ascent or on-orbit conditions or anomalies affecting original certification.

DATA REQUIREMENTS DESCRIPTION

1.DR: MI01, Standard Payload Integration Agreement (SPIA) for Pressurized Payloads

2.DRD Extension Number (s): None.

3.TPR Code: OZ

4.Data Type: 1

5.Frequency of Submission: Update as required.

6.First Submission Date: Next revision as required.

7.As-of-Date: N/A

8.Copies and Distribution:

Record:1 Data Management, OL3

Copies:Program-Authorized Electronic Library (PALS) or follow-on system

9.Remarks: None.

10.Use: Establishes the minimum requirements of the management structure and the execution of the roles and responsibilities for services and resources that will be used/provided by ISS Program Participants for a pressurized payload.

11.References: SOW paragraph 1.2.1.9.

12.Interrelationships: None.

13.Preparation Information:

13.1Scope: The SPIA documents the primary management and technical agreements and requirements between the Research Program Office , Payload Developer or appropriate office and the ISS Program.

13.2Applicable and Referenced Documents:

13.3Contents: The Standard Payload Integration Agreement (SPIA) for Pressurized Payloads provides the definition of integration requirements, management roles and responsibilities; flight and ground safety requirements; interface design requirements; verification and testing requirements; operational requirements; launch/landing site processing requirements; resource and interface commitments; and schedule tracking commitments.

13.4Format: Per SSP 50010, Documentation Requirements, Standards and Guidelines.

13.5Maintenance: As required

DATA REQUIREMENTS DESCRIPTION

1.DR: MI02, Payload Integration Agreement (PIA) Increment Addendum Blank Book for Pressurized Payloads

2.DRD Extension Number (s): None.

3.TPR Code: OZ

4.Data Type: 1

5.Frequency of Submission: Develop for each applicable increment; update as necessary to document changes for each increment.

6.First Submission Date: Next revision as required.

7.As-of-Date: N/A

8.Copies and Distribution:

Record:1 Data Management, OL3

Copies:Program-Authorized Electronic Library (PALS) or follow-on system

9.Remarks: (Not Applicable to EXPRESS Payloads)

10.Use: Used as the basis for development of payload-unique integration agreements for a specific increment between the pressurized payload developer and the ISS Program.

11.References: SOW paragraph 1.2.1.9.

12.Interrelationships: None.

13.Preparation Information:

13.1Scope: The Payload Integration Agreement (PIA) Increment Addendum Blank Book for Pressurized Payloads contains the standard format to be used by all International Space Station (ISS) Program, pressurized payload developers to develop a unique Integration Agreement (EIA) for pressurized payloads. The PIA Addendum requirements addressthe flight-specific responsibilities and tasks that relate directly to integration of the payload into the ISS.

13.2Applicable and Referenced Documents:

13.3Contents: The Payload Integration Agreement (PIA) Increment Addendum Blank Book for Pressurized Payloads provides the format and instructions for definition of a generic payload’s integration requirements, comprising requirements which are applicable to a specific increment in which the payload developer participates. The Payload Integration Agreement (PIA) Increment Addendum Blank Book for Pressurized Payloads is used to develop payload-unique agreements for satisfaction of requirements addressthe flight-specific responsibilities and tasks that relate directly to integration of the payload into the ISS.

13.4Format: Per SSP 50010, Documentation Requirements, Standards and Guidelines.

13.5Maintenance:

DATA REQUIREMENTS DESCRIPTION

1.DR: MI03, Standard Payload Integration Agreement (SPIA) for Unpressurized Payloads

2.DRD Extension Number (s): None.

3.TPR Code: OZ

4.Data Type: 1

5.Frequency of Submission: Update as required.

6.First Submission Date: Next revision as required.

7.As-of-Date: N/A

8.Copies and Distribution:

Record:1 Data Management, OL3

Copies:Program-Authorized Electronic Library (PALS) or follow-on system

9.Remarks: EXPRESS payload developers should use SE55, EXPRESS Integration Agreement Blank Book, for development of their integration agreements with the ISS program.

10.Use: Used as the basis for development of payload-unique integration agreements between the unpressurized payload developer and the ISS Program.

11.References: SOW paragraph 1.2.1.9.

12.Interrelationships: None.

13.Preparation Information:

13.1Scope: The Standard Payload Integration Agreement (SPIA) for Unpressurized Payloads contains the standard format to be used by all International Space Station (ISS) Program, unpressurized payload developers to develop a unique Integration Agreement (EIA) for unpressurized payloads. The SPIA requirements are applicable for all flights and increments in which the payload developer participates.

13.2Applicable and Referenced Documents:

13.3Contents: The Standard Payload Integration Agreement (SPIA) for Unpressurized Payloads provides the format and instructions for definition of a generic payload’s integration requirements, comprising: management roles and responsibilities; flight and ground safety requirements; interface design requirements; verification and testing requirements; operational requirements; launch/landing site processing requirements; resource and interface commitments; and schedule tracking commitments. The Standard Payload Integration Agreement (SPIA) for Unpressurized Payloads is used to develop payload-unique agreements for satisfaction of these integration requirements.

13.4Format: Per SSP 50010, Documentation Requirements, Standards and Guidelines.

13.5Maintenance:

DATA REQUIREMENTS DESCRIPTION

1.DR: MI04, Payload Integration Agreement (PIA) Increment Addendum Blank Book for Un-pressurized Payloads

2.DRD Extension Number (s): None.

3.TPR Code: OZ

4.Data Type: 1

5.Frequency of Submission: Update as required.

6.First Submission Date: Next revision as required.

7.As-of-Date: N/A

8.Copies and Distribution:

Record:1 Data Management, OL3

Copies:Program-Authorized Electronic Library (PALS) or follow-on system

9.Remarks: EXPRESS payload developers should use the Payload Data Library for development of their increment unique addendums.

10.Use: Used as the basis for development of payload-unique integration agreements for a specific increment between the unpressurized payload developer and the ISS Program.

11.References: SOW paragraph 1.2.1.9.

12.Interrelationships: None.

13.Preparation Information:

13.1Scope: The Payload Integration Agreement (PIA) Increment Addendum Blank Book for Unpressurized Payloads contains the standard format to be used by all International Space Station (ISS) Program, pressurized payload developers to develop a unique Integration Agreement (EIA) for unpressurized payloads. The PIA Addendum requirements addressthe flight-specific responsibilities and tasks that relate directly to integration of the payload into the ISS.

13.2Applicable and Referenced Documents:

13.3Contents: The Payload Integration Agreement (PIA) Increment Addendum Blank Book for Unpressurized Payloads provides the format and instructions for definition of a generic payload’s integration requirements, comprising requirements which are applicable to a specific increment in which the payload developer participates. The Payload Integration Agreement (PIA) Increment Addendum Blank Book for Unpressurized Payloads is used to develop payload-unique agreements for satisfaction of requirements addressthe flight-specific responsibilities and tasks that relate directly to integration of the payload into the ISS.

13.4Format: Per SSP 50010, Documentation Requirements, Standards and Guidelines.

13.5Maintenance:

DATA REQUIREMENTS DESCRIPTION

1.DR: MI05, Standard Payload Integration Agreement (SPIA) for Small Pressurized Payloads

2.DRD Extension Number (s): None.

3.TPR Code: OZ

4.Data Type: 1

5.Frequency of Submission: Update as required.

6.First Submission Date: Next revision as required.

7.As-of-Date: N/A

8.Copies and Distribution:

Record:1 Data Management, OL3

Copies:Program-Authorized Electronic Library (PALS) or follow-on system

9.Remarks:

10.Use: Used as the basis for development of payload-unique integration agreements for payloads that meet the criteria for small payloads, between the pressurized payload developer and the ISS Program.

11.References: SOW paragraph 1.2.1.9.

12.Interrelationships: None.

13.Preparation Information:

13.1Scope: The Standard Payload Integration Agreement (SPIA) for Small Pressurized Payloads contains the standard format to be used by International Space Station (ISS) Program, pressurized payload developers to develop a unique Integration Agreement (EIA) for pressurized payloads that meet the criteria for small payloads. The SPIA requirements are applicable for all flights and increments in which the payload developer participates.

13.2Applicable and Referenced Documents:

13.3Contents: The Standard Payload Integration Agreement (SPIA) for Small Pressurized Payloads provides the format and instructions for definition of a generic payload’s integration requirements for payloads that meet the criteria for small payloads, comprising: management roles and responsibilities; flight and ground safety requirements; interface design requirements; verification and testing requirements; operational requirements; launch/landing site processing requirements; resource and interface commitments; and schedule tracking commitments. The Standard Payload Integration Agreement (SPIA) for Small Pressurized Payloads is used to develop payload-unique agreements for satisfaction of these integration requirements.