TAPApplication(asdefinedin23USC101)

Note: Sponsor AdministeredProjects areno longer allowed

ApplicantInformation

ProjectSponsor:
Co-SponsorName(ifnon-profit):
ContactPerson and Title:
Address:
City, State, andZip
Telephone:
EmailAddress:

ProjectInformation

ProjectTitle:
ProjectLocation –includeCity/Town
and Kent/SussexCounty:
BriefProjectDescriptionand howitqualifiesbased on Activitiescheckedbelow.Notetheprimaryactivity inthe
description.
(A location mapwithaerialviewmust
beattached)

QUALIFYINGACTIVITIES

ChecktheTransportationAlternativeactivitythattheproposedprojectwilladdress.Allprojectsmusthavearelationshiptosurfacetransportationandmustbededicatedtopublicuse. Theprojectmustfitintoatleastoneoftheactivitieslistedbelow.Indicatewhicheligibleactivitiestheprojectwillachieve(checkallthatapply):(Note:Checkingmoreactivitiesdoesnotensureorincreaseeligibility.)Eligibleactivities mustbeconsistentwithdetailsdescribedunder23U.S.C.101(a)(29)and213(b).

□Constructionofon-roadandoff-roadtrailfacilitiesforpedestrians,bicyclists, andothernonmotorizedforms oftransportation,includingsidewalks,bicycleinfrastructure,pedestrianand bicyclesignals,trafficcalmingtechniques,lightingand othersafetyrelatedinfrastructure,andtransportationprojects toachievecompliancewiththe AmericanswithDisabilitiesActof1990(42U.S.C. 12101 etseq.).

□Construction,planning, anddesign ofinfrastructure-relatedprojectsand systems thatwillprovidesaferoutesfornon-drivers,includingchildren,olderadults,andindividualswith disabilitiestoaccessdailyneeds.

□Conversionand useofabandonedrailroadcorridorsfortrailsforpedestrians,bicyclists,orothernonmotorizedtransportationusers

□Constructionofturnouts,overlooks, and viewingareas

Communityimprovementactivities,whichincludebutare notlimitedto:

□Inventory, control, orremovalofoutdooradvertising

□Historicpreservation andrehabilitationofhistorictransportationfacilities

□Vegetationmanagementpractices intransportationrights-of-wayto improveroadwaysafety,preventagainstinvasivespecies,andprovideerosioncontrol

□Archaeologicalactivitiesrelatingtoimpactsfromimplementation ofatransportationprojecteligibleundertitle 23

Anyenvironmentalmitigationactivity,includingpollutionpreventionandpollutionabatementactivitiesand mitigationto:

□addressstormwatermanagement, control,and waterpollutionprevention orabatementrelatedto highwayconstructionorduetohighwayrunoff, includingactivitiesdescribedin sections133(b)(11),328(a), and329 oftitle23;or

□reducevehicle-causedwildlifemortalityorto restoreandmaintainconnectivityamongterrestrialoraquatichabitats.

PROJECT IMPLEMENTATION INFORMATION

1.Projectphasesincludedinfundingrequest (checkappropriateboxes):

□PlanningActivities(Examples:conceptplanning,masterplanning,publicmeetings,etc.)

□PreliminaryEngineering/FinalDesignPlans

□Construction

2.Describeanyprojectwork phasesthatarecurrentlyunderwayorhavebeencompleted.

3.Haveanypublicinformation orcommunitymeetingsbeen held?Yes☐No☐

Ifyes,describeand/orsupplymeetingminutes:

4.ArePropertyownersawareofand supportthisproject?Yes☐No☐

(Describebelow)

5.ArePropertyownerswilling to donateRealEstatefor RightofWay needs ?(e.g.PermanentEasementand/orTemporaryConstructionEasement) Yes☐ No☐

6.Whowilltakeovertheproposed ownership andmaintenanceresponsibilitiesfor thisprojectwhencomplete?Maintenanceincludesbutis notlimited tomowing,trashremoval,snowremoval,lightingownershipetc.

7.Doesthesponsorhavethe20%matchingfundsforphaseschecked aboveforthefundingrequest?Yes☐ No☐

Ifso,explainsourceof fundingand anylimitationsto thosefunds.Note:TAPprojectsarecappedat onemillion dollarsfordesignand construction.20%matchingfundsfora project of thiscostis

$200,000for design and construction.

8.Anyenvironmentalissues(wetlands,culturalresources,hazardousmaterials,endangeredspecies)thatareknown tobeimpacted bytheproject?

Yes☐No☐

9.Anyutility(aboveorbelowground)issuesthatareknownto beimpacted bytheproject?Yes☐ No☐

10.Has the sponsor participated in TAP or TE previously?YesNo

If so, list at least one project.

CERTIFICATIONOF PROJECTSPONSOR

IherebycertifythattheproposedprojecthereindescribedissupportedbyClickheretoentertext.andthatsaidentityShall:(1)provideanyrequiredfundingmatch;(2)enterintoamaintenanceagreementwiththeDelawareDepartmentofTransportation,asnecessary;(3)complywiththeFederalUniformRelocationAssistanceandAcquisitionPoliciesAct(TheUniformAct)foranyright-of-wayactionsrequiredfortheproject;(4)complywithNEPAprocesspriortoconstructionwhichmayrequireinvolvementwiththeStateHistoricPreservationOfficer(SHPO),publicinvolvementandcoordinationwithotherStateand/orFederalagencies,priortodesignorconstruction;(5)helpobtainnecessarypermitsandfollowmitigationthatmaybenecessaryand

(6)supportotheractionsnecessarytofullyimplementtheproposedproject.Thisincludesamaximumof45daystoreturnanydocumentrequiringsignatureandpaymentofinvoices.I furthercertifythatClickheretoentertext.will follow through on the project onceprogrammedinDelawareDepartment of Transportation’s Transportation AlternativesProgram schedule.

Signature PrintNameTitle

For DelDOT Use:

Project lengthBeginning PointEnding Point

Road NameOn-System project (state maintained)Off-System Project (local road or RW)