August 2007 doc.: IEEE 802.11-07/2353r0
IEEE P802.11
Wireless LANs
Date: 2007-08-28
Author(s):
Name / Company / Address / Phone / email
Peter Ecclesine / Cisco Systems / 170 W. Tasman Dr.
MS SJ-10-5
San Jose, CA 95134-1706 / +1-408-527-0815 /
Minutes from August 28th 2007 TGy Teleconference Call
Agenda:
Preliminary28 August Agenda:
1) Roll call
2) Approval of agenda
3) "Are you aware of, and understand the IEEE patent policy",
if not "Refer the correct section or IEEE Patcom URL"
http://standards.ieee.org/board/pat/pat-slideset.ppt
4) Review July plenary minutes, 07/2212r0
5) Review of comment validity rules
6) Discussion of LB-94-104-106-109 Comment spreadsheet 07/2333r1, P802.11y D4.0
7) Plans to work at Waikoloa session and after Waikoloa
8) Any other discussion – nextteleconf4 Sept,13:00 ET for up to two hours, discussing LB109 and remaining required comments from Negative voters
10) Adjourn at or before14:30 ET
Proceedings:
§ Chair calls telecon to order 13:03 ET
§ Roll call – Dan Lubar (Relay Services), Eldad Perahia (Intel), Peter Ecclesine (Cisco), Amit Bansal (Wipro) and Scott Blue (In Motion Technology)
§ Chair reviews proposed telecon Agenda and asks for approval of same
§ Hearing no objections, the telecon agenda is approved
§ Chair reads IEEE patent policy statement (Patcom Statement)
§ Chair asks: "Are you aware of, and understand the IEEE patent policy? If not refer the correct section or IEEE Patcom URL: http://standards.ieee.org/board/pat/pat-slideset.ppt ”
§ Chair asks: “..does anyone not understand the IEEE patent policy as read?" No reply is heard
§ Chair notes the July San Francisco minutes are 07/2269r0, and will be reviewed in the 4 Sept teleconference
§ Chair asks: “Do we all agree that the Editor will review all comments, make recommendations and prepare submissions to respond to comments?” No reply is heard
§ Web conference http://meetingplace.cisco.com worked, sharing views of files being discussed.
Discussion of LB-94-104-106-109 Comment spreadsheet, comments, 07/2333r1
We went draft 4.0 page by page through all 189 LB109 comments received, skipping Extended Channel Switch and Enablement topics, as they will be discussed in the next teleconference, ECSA first.
Chair intends to write submissions responding to comments ECSA (11.9.7) and Enablement comments (11.14 general rewrite), and will invite responses to clause 17 comments (), and will have submissions before the September 4th teleconference.
Chair or Editor will write submissions covering all other comments.
Discussion of schedule through San Francisco.
TGy has teleconferences scheduled for Sept 4th and Sept 11th leading up to Waikoloa. At Waikoloa TGy has Tuesday AM1 timeslot and Thursday PM2 timeslot. We will use the Tuesday timeslot to look at LB109, LB106, LB104 and LB94 results, submissions addressing comments, and hopefully in the Thursday PM2 timeslot, make motions to ask the WG to approve another recirculation letter ballot after Waikoloa.
At 13:55 Scott Blue moves to adjourn, Dan Lubar seconded, and no one objected to the motion, so we adjuourned at 13:55 ET.
References:
FCC 05-56 ( http://hraunfoss.fcc.gov/edocs_public/attachmatch/FCC-05-56A1.pdf )
FCC 07-99 ( http://hraunfoss.fcc.gov/edocs_public/attachmatch/FCC-07-99A1.pdf )
IEEE 802.11 Drafts (in IEEE 802.11 Member Area)
802.11-2007
P802.11k-D8.0
P802.11n-D2.05
P802.11r-D8.0
P802.11y-D4.00.pdf
TGy Reference Docs:
11-06-0571-00-000y-cbp-tg-telecon-minutes-19-april.doc
11-06-0607-00-000y-TGy-telecon-minutes-3May.doc
11-06-0668-01-000y-3650-3700-mhz-fcc-action.ppt
11-06-0680-01-000y-may-chairs-report.ppt
11-06-0740-00-000y-joint-tgy-rr-tag-may-minutes.doc
11-06-0855-03-000y-Annex-and-J-3650-MHz-band.doc
11-06-0863-02-000y-tgy-june-14th-2006-conference-call-minutes.doc
11-06-0864-04-000y-3650-mhz-mobile-service-enablement.doc
11-06-0867-02-000y-references-mobile-service-enablement.doc
11-06-0873-00-000y-tgy-june-28th-2006-conference-call-minutes.doc
11-06-0922-00-000y-tgy-july-11th-2006-conference-call-minutes.doc
11-06-0955-03-000y-ofdm-phy-3650-mhz-band.doc
11-06-1023-01-000y-proposal-tgy.ppt
11-06-1024-02-000y-tgy-july-chairs-report.ppt
11-06-1120-00-000y-Minutes-from-San-Diego-Plenary-2006.doc
11-06-1374-00-000y-aug15th-and-aug29th-2006-conference-call-minutes.doc
11-06-1427-00-000y-sept12th-2006-conference-call-minutes.doc
11-06-1432-01-000y-extended-channel-switch-announement-normative-text.doc
11-06-1433-00-000y-extended-channel-switch-announement-presentation.ppt
11-06-1466-01-000y-TGy-September-chairs-report.ppt
11-06-1536-00-000y-proprosed-draft-revision.doc
11-06-1537-00-000y-melbourne-minutes-september.doc
11-06-1561-00-000y-tgy-sept-26th-2006-conference-call-minutes.doc
11-06-1609-04-000y-tgy-internal-review-comment-submissions.xls
11-06-1830-00-000y-dse-in-licensed-band-operations.doc
11-06-1675-02-000y-tgy-November-chairs-report-ppt.ppt (from Dallas Plenary)
11-06-1865-00-000y-tgy-brief-intro-to-tgy.doc
11-06-1871-00-000y-TGy-2006-Dallas-Plenary-Minutes.doc
11-06-1934-05-000n-tgn-opening-report-london-jan-07
11-07-0008-09-000y-tgy-lb94-comment-spreadsheet
11-07-0098-03-000y-tgy-january-chairs-report
11-07-0121-00-000y-tgy-meeting-minutes-from-jan-2007-london-interim-session
11-07-0224-00-000y-TGy-Jan-30th-Telecon-Minutes.doc
11-07-0245-02-000y-TGy-LB94-7-10-11-Submission.doc
11-07-0251-00-000y-TGy-February-13th-Telecon-Minutes.doc
11-07-0270-00-000y-TGy-LB94-3-4-5-6-9.8-Submission.doc
11-07-0271-01-000y-11-07-0271-00-000y-TGy-LB94-a-d-i-j-submission-doc.doc
11-07-0272-00-000y-phy-comments.doc
11-07-0282-00-000y-TGy-LB94-17-etc-Submission.doc
11-07-0291-00-0007-TGy-February-27-telecon-minutes.doc
11-07-0373-01-000y-tgy-march-opening-report
11-07-0392-00-000y-tgy-redline-between-draft-d1-0-and-d1-1
11-07-0395-00-000y-tgy-meeting-minutes-mar-2007-orlando-plenary
11-07-0401-03-000y-long-slottime-option-rtscts-procedure
11-07-0473-00-000y-tgy-lb94-submission-editors-resolutions
11-07-0479-00-000y-tgy-redline-between-d1-0-and-d1-2
11-07-0602-06-000y-d2-comments
11-07-0603-01-000y-lb104-dse-reporting-cid-1093
11-07-0673-03-000y-lb104-non-editorial-comments
11-07-0674-04-000y-lb104-editorial-comments-submission
11-07-0679-04-000y-tgy-may-opening-report
11-07-0783-01-000y-meeting-minutes-may-2007-montreal-interim
11-07-0801-01-000y-3-and-11-14-submission
11-07-0821-00-000y-tgy-may-closing-report
11-07-1974-01-000y-tgy-june-5th-telecon-minutes.doc
11-07-2038-02-000y-tgy-june-26th-telecon-minutes.doc
11-07-2060-00-000y-tgy-july-3rd-telecon-minutes.doc
11-07-2066-01-000y-coexistence-assurance
11-07-2105-00-000y-july-10th-telecon-minutes
11-07-2143-03-000y-tgy-july-opening-report
11-07-2197-00-000y-discussion-on-cca-ed
11-07-2208-02-000y-802-11y-conditional-sponsor-ballot-report
11-07-2263-00-000y-tgy-july-closing-report
11-07-2264-00-000y-tgy-redline-between-draft-3-2-and-3-1
11-07-2268-00-000y-tgy-redline-between-draft-4-0-and-3-0
Acronyms/Abbreviations
CBP – Contention-Based Protocol
CCA – Clear Channel Assessment
CSA – Channel Switch Announcement
CSMA/CD – Carrier Sense Multiple Access/Collision Detect
DFS – Dynamic Frequency Selection
DSE – dependent station enablement
E-CSA – Extended Channel Switch Announcement
ED – Energy Detect
LCI – Location Configuration Information
PICS – Protocol Implementation Conformance Statement
STA – Station
TPC – Transmit Power Control
Submission page 1 Peter Ecclesine, Cisco Systems