13May2015 TSG-AC Meeting Summary
Page 1 of 9
1.Call to Order & Opening Remarks
The meeting was opened on 13 May 2015by the Chair, Ed Tiedemann (Qualcomm) and began at 8:10pm(ET).
Yingming Wang (Huawei), the TSG-AC Vice Chair, was thanked for his leadership during the 25 March 2015 TSG-AC plenary.
2.Attendance Registration & Roll Call
Quorum was achieved asnine (9) of the ten(10) quorum members were present (90% participation). There were no proxies noted at this meeting.
Quorum Members Present / Quorum Members Absent / Guests/Observers/OthersAlcatel Lucent / China Telecom / iFAST
Huawei / Sprint
Kyocera
Qualcomm
Rohde & Schwarz
Softbank
Spirent
VIA Telecom
ZTE
3.Introduction & Numbering of Contributions
Contributions were uploaded to the 3GPP2 server and noted on the document register (AC00-20150513-000r2).(Secretary’s Note: During the meeting, changes to the document register were made and AC00-20150513-000r3 was uploaded to the ftp site.)
4.AgendaApproval & Assignment of Contributions to Agenda Items
DecisionAC-2015/05-01
The agenda presented in AC00-20150513-001r2 was modified and approved as AC00-20150513-001r3, which was uploaded to the ftp site following the meeting.
5.Review & Approval of 25 March2015 Meeting Summary
During the review of the 25 March TSG-AC meeting summary, it was noted that the file names of contributions AC00-20150325-022 and AC00-20150325-023 incorrectly identified the C.S0098 documents as Revision B, when the documents are actually Revision A.
Action AC-2015/05-01
The Secretary will update the file names of contributions AC00-20150325-022 and AC00-20150325-023 (creating an –r1 of each) to reflect that both documents are Revision A of their respective C.S0098 parts.
DecisionAC-2015/05-02
AC00-20150513-002r1, the 25 March 2015 TSG-AC meeting summary, was approved.
6.Review of Outstanding Action Items
There were no outstanding action items.
7.Liaison Reports & Incoming Correspondence
7.1Organizational Partners
None
7.2Steering Committee
AC00-20150513-024, Letter of Resignation as Chair of 3GPP2 Steering Committee, was provided FYI.
7.33GPP2 Secretariat
The following contributions, from the Secretariat, were provided FYI:
AC00-20150513-017, V&V Initiation - C.P0057-F v0.2 (Band Class Specification for cdma2000 Spread Spectrum Systems)
AC00-20150513-018, V&V Initiation - C.P0104‐A v0.2 (Recommended Minimum Performance Standards for Extended Cell cdma2000 High Rate Packet Data Access Terminal)
AC00-20150513-019, C.S0098‐100‐A v1.0 (Introduction to cdma2000 Extended Cell High Rate Packet Data Air Interface Specification) Publication
AC00-20150513-020, C.S0098-200-A v1.0 (Physical Layer for cdma2000 Extended Cell High Rate Packet Data Air Interface Specification) Publication
AC00-20150513-021, C.S0098‐300‐A v1.0 (Upper Layers for cdma2000 Extended Cell High Rate Packet Data Air Interface Specification) Publication
AC00-20150513-022, A.S0022-C v1.0 (Interoperability Specification (IOS) for Evolved High Rate Packet Data (eHRPD) Radio Access Network Interfaces and Interworking with Enhanced Universal Terrestrial Radio Access Network (E-UTRAN)) Publication
AC00-20150513-023, TSG-AC Documents Flagged for Cancelation/Withdrawal
7.4TSG-SX
None
7.5TIA
Action AC-2015/05-02
AC00-20150513-006,C.S0098-100-A v1.0 (Introduction to Extended Cell High Rate Packet Data (xHRPD) Air Interface Specification) Legal Comments, was remanded to WG2 for review and comment.
Decision AC-2015/05-03
AC00-20150513-006a, the proposed response to TIA’s legal comments against C.S0098-100-A, was approved to liaise to TR-45.5. No action from 3GPP2 is required.
Action AC-2015/05-03
AC00-20150513-007, C.S0098-300-A v1.0 (Upper Layers for cdma2000 Extended Cell High Rate Packet Data Air Interface Specification), was remanded to WG2 for review and action.
Action AC-2015/05-04
AC00-20150513-025,C.S0104-A v1.0 (Recommended Minimum Performance Standards for Extended Cell cdma2000 High Rate Packet Data Access Terminal) Voting Summary, was remanded to WG3 for review and action.
Action AC-2015/05-05
AC00-20150513-026, C.S0057-F v1.0 (Band Class Specification for cdma2000 Spread Spectrum Systems) Voting Summary, was remanded to WG3 for review and action.
7.6ITU
Action AC-2015/05-06
AC00-20150513-005, the ITU-R WP5D 2015-2020 Meeting Schedule, was remanded to WG3 FYI.
7.7MDG
None
7.8OMA
None
7.93GPP
None
7.10ETSI
None
7.11oneM2M
None
7.12Other
Action AC-2015/05-07
AC00-20150513-015,V&V Comments - C.P0057-F v0.2 (Band Class Specification for cdma2000 Spread Spectrum Systems), was remanded to WG3 for review and action.
Action AC-2015/05-08
AC00-20150513-016, V&V Comments - C.P0104-A v0.2 (Recommended Minimum Performance Standards for Extended Cell cdma2000 High Rate Packet Data Access Terminal), was remanded to WG3 for review and action.
8.Working Group Reports
8.1WG1 – Application Services
The WG1 Chair noted that the subcommittee has not met since the last TSG-AC plenary. The two (2) contributions provided by the WG1 Chair were provided FYI:
AC00-20150513-003, TSG-AC Document Log
- Updated to close out all canceled documents (see AC00-20150513-023)
- Updated as a result of the March 2015 plenary actions
- Updated with the approved work items
AC00-20150513-004, WI Review Status
8.2WG2 – Signaling and Protocol
The WG2 Chair gave a verbal report of recent activities.
8.3WG3 – Physical Layer
AC00-20150513-013, WG3 Report, was presented FYI.
Decision AC-2015/05-04
AC00-20150513-008r1, Proposed publication text for C.S0057-F v1.0 Band Class Specification for cdma2000 Spread Spectrum Systems (To be published as C.S0057-F v1.0, WI: 3GPP2-00340), was approved for publication and liaised to TR-45.5
Decision AC-2015/05-05
AC00-20150513-009r1,Proposed publication text for C.S0104-A v1.0 Recommended Minimum Performance Standards for Extended Cell cdma2000 High Rate Packet Data Access Terminal (To be published as C.S0104-A v1.0, WI: 3GPP2-00340), was approved for publication and liaised to TR-45.5.
Decision AC-2015/05-06
AC00-20150513-010,Proposed liaison to ITU-R WP5D on draft for proposed updates for M.1457-12, was approved to liaise to TR-45.5 for approval and then submission to the ITU WP 5D.
Decision AC-2015/05-07
AC00-20150513-014,Proposed republication text for C.S0095-A v2.0 Signaling Test Specification for EUTRAN-cdma2000 Connectivity and Interworking (to be published as C.S0095-A v2.0, WI:3GPP2-00342), was approved as republication text and liaised to TR-45.5.
During the WG3 discussions, the Chair noted that the ITU has created an issue with Section 5.22 (beginning with document 95 onwards) of M.1457-12:
The references are messed up, as were the page headers.
Peter Nurse will be contacting the ITU to alert the organization that it needs to be fixed.
What 3GPP2 sent was correct. The error was on the ITU side.
8.4WG5 – Access Network Interfaces
WG5 has not met and no written report was provided. The working group has no open issues and no new development work is planned.
9.TSG-AC Document Processing
9.1Consideration of Projects for SC-Level Review for Publication
The documents expected to be presented to the Plenary for publication approval included:
C.S0057-F v1.0 Band Class Specification for cdma2000 Spread Spectrum Systems (To be published as C.S0057-F v1.0, WI: 3GPP2-00340)
C.S0104-A v1.0 Recommended Minimum Performance Standards for Extended Cell cdma2000 High Rate Packet Data Access Terminal
9.2Consideration of Projects for SC-Level Review for Re-Publication
The documents expected to be presented to the Plenary for re-publication approval included:
C.S0095-A v2.0 Signaling Test Specification for EUTRAN-cdma2000 Connectivity and Interworking (to be published as C.S0095-A v2.0, WI:3GPP2-00342)
9.3Consideration of Projects for Approval for V&V Review
None
9.4Consideration of Projects for Approval for Extended V&V Review
None
9.5Consideration of Projects for Approval for Baseline Text
None
10.Old Business
10.1ITU Activities
10.2TSG-AC WI Approvals
None
10.3Other
None
11.New Business
11.1New/Proposed (TSG-AC) Work Items
None
11.2Document/Project Number Requests
None
11.3
None
12.Future Meeting Schedule
The following TSG-AC plenary teleconference meetings were noted:
16 September 2015 – 8:00pm-10:00pm (ET)
17 December 2015 – 8:00pm-10:00pm (ET)
Detailed information on all TSG-AC meetings can be found on the 3GPP2 online calendar (
13.Open Discussion & Other Business
None
14.Assignments
AC-2015/05-09
The following M.1457-13 schedule was excerpted from AC00-20150325-010 and is being highlighted for TSG-AC participants to ensure the schedule remains visible:
Critical Dates for the Revision 13 update of Recommendation ITU-R M.1457Process Step
IMT-2000/1(Rev.1) / Date / Action
IMT-2000/1(Rev.1) or
IMT-2000/3(Rev.1)
Critical Milestone (2): / xx February 2016
(7 days before xx-xx February 2016 –
WP 5D #23) / Completion of Step 4
Evaluation of candidate RITs or SRITs by Evaluation Groups
Cut-off date for evaluation report to ITU
Final date for submission of FormA
Critical Milestone (3): / WP 5D #23
xx-xx February 2016 / Completion of Step 5
Review and coordination of outside evaluation activities
Completion of Step 6
Review to assess compliance with minimum requirements
Completion of Step 7
Consideration of evaluation results, consensus building and decision
Step 8 / X+2B:
xx June 2016
(7 days before xx - xx June 2016 WP 5D #24) / Step 8 Development of the new section in Rec. ITU-R M.1457 for the Radio Interface Technology.
Final date for submission of Certification B.
Synchronization of Finalization of the Revision / Starting with X+2B:
yy June 2016
(7 days before yy-yy June 2016 WP 5D #24)
And continuing with the subsequent dates indicated in Table 1 below in this document / The remainder of the process and schedules for finalization of the Revisions follows the dates and general tasks indicated in Items 8 through 13 in Table 1 below in this document.
15.Adjournment
The TSG-AC meeting ended atapproximately 9:28pm(ET) on 13 May 2015.
May2015 TSG-AC Decisions
DecisionAC-2015/05-01
The agenda presented in AC00-20150513-001r2 was modified and approved as AC00-20150513-001r3, which was uploaded to the ftp site following the meeting.
DecisionAC-2015/05-02
AC00-20150513-002r1, the 25 March 2015 TSG-AC meeting summary, was approved.
Decision AC-2015/05-03
AC00-20150513-006a, the proposed response to TIA’s legal comments against C.S0098-100-A, was approved to liaise to TR-45.5. No action from 3GPP2 is required.
Decision AC-2015/05-04
AC00-20150513-008r1, Proposed publication text for C.S0057-F v1.0 Band Class Specification for cdma2000 Spread Spectrum Systems (To be published as C.S0057-F v1.0, WI: 3GPP2-00340), was approved for publication and liaised to TR-45.5
Decision AC-2015/05-05
AC00-20150513-009r1, Proposed publication text for C.S0104-A v1.0 Recommended Minimum Performance Standards for Extended Cell cdma2000 High Rate Packet Data Access Terminal (To be published as C.S0104-A v1.0, WI: 3GPP2-00340), was approved for publication and liaised to TR-45.5.
Decision AC-2015/05-06
AC00-20150513-010, Proposed liaison to ITU-R WP5D on draft for proposed updates for M.1457-12, was approved to liaise to TR-45.5 for approval and then submission to the ITU WP 5D.
Decision AC-2015/05-07
AC00-20150513-014, Proposed republication text for C.S0095-A v2.0 Signaling Test Specification for EUTRAN-cdma2000 Connectivity and Interworking (to be published as C.S0095-A v2.0, WI:3GPP2-00342), was approved as republication text and liaised to TR-45.5.
Carried Over Action Items
None
May 2015 TSG-AC Recorded Actions
Action AC-2015/05-01
The Secretary will update the file names of contributions AC00-20150325-022 and AC00-20150325-023 (creating an –r1 of each) to reflect that both documents are Revision A of their respective C.S0098 parts.
Action AC-2015/05-02
AC00-20150513-006,C.S0098-100-A v1.0 (Introduction to Extended Cell High Rate Packet Data (xHRPD) Air Interface Specification) Legal Comments, was remanded to WG2 for review and comment.
Action AC-2015/05-03
AC00-20150513-007, C.S0098-300-A v1.0 (Upper Layers for cdma2000 Extended Cell High Rate Packet Data Air Interface Specification), was remanded to WG2 for review and action.
Action AC-2015/05-04
AC00-20150513-025,C.S0104-A v1.0 (Recommended Minimum Performance Standards for Extended Cell cdma2000 High Rate Packet Data Access Terminal) Voting Summary, was remanded to WG3 for review and action.
Action AC-2015/05-05
AC00-20150513-026, C.S0057-F v1.0 (Band Class Specification for cdma2000 Spread Spectrum Systems) Voting Summary, was remanded to WG3 for review and action.
Action AC-2015/05-06
AC00-20150513-005, the ITU-R WP5D 2015-2020 Meeting Schedule, was remanded to WG3 FYI.
Action AC-2015/05-07
AC00-20150513-015, V&V Comments - C.P0057-F v0.2 (Band Class Specification for cdma2000 Spread Spectrum Systems), was remanded to WG3 for review and action.
Action AC-2015/05-08
AC00-20150513-016, V&V Comments - C.P0104-A v0.2 (Recommended Minimum Performance Standards for Extended Cell cdma2000 High Rate Packet Data Access Terminal), was remanded to WG3 for review and action.
AC-2015/05-09
The following M.1457-13 schedule was excerpted from AC00-20150325-010 and is being highlighted for TSG-AC participants to ensure the schedule remains visible:
Critical Dates for the Revision 13 update of Recommendation ITU-R M.1457Process Step
IMT-2000/1(Rev.1) / Date / Action
IMT-2000/1(Rev.1) or
IMT-2000/3(Rev.1)
Critical Milestone (2): / xx February 2016
(7 days before xx-xx February 2016 –
WP 5D #23) / Completion of Step 4
Evaluation of candidate RITs or SRITs by Evaluation Groups
Cut-off date for evaluation report to ITU
Final date for submission of FormA
Critical Milestone (3): / WP 5D #23
xx-xx February 2016 / Completion of Step 5
Review and coordination of outside evaluation activities
Completion of Step 6
Review to assess compliance with minimum requirements
Completion of Step 7
Consideration of evaluation results, consensus building and decision
Step 8 / X+2B:
xx June 2016
(7 days before xx - xx June 2016 WP 5D #24) / Step 8 Development of the new section in Rec. ITU-R M.1457 for the Radio Interface Technology.
Final date for submission of Certification B.
Synchronization of Finalization of the Revision / Starting with X+2B:
yy June 2016
(7 days before yy-yy June 2016 WP 5D #24)
And continuing with the subsequent dates indicated in Table 1 below in this document / The remainder of the process and schedules for finalization of the Revisions follows the dates and general tasks indicated in Items 8 through 13 in Table 1 below in this document.