Achievements of WMC-II
- Consent has been issued to three Waste to Energy plant at Okhla, Ghazipur & Bawana respectively. These three Waste to Energy plants will solve the problem of disposal of Municipal Solid Waste. Timarpur Okhla Waste to Energy Plant is operational and other two are under installation. Details are as under:
S.No. / Name / Capacity of Electricity Generated / Capacity of Waste processing
1 / Timarpur-Okhla Waste Processing Company Okhla Compost Site / 16 MW / 1300 MTD
2 / East Delhi Waste Processing Company Pvt. Ltd. Ghazipur / 10 MW / 1300 MTD
3 / Delhi MSW Solutions Ltd. Narela Bawana Road / 24 MW / 3000 MTD
- A Construction and Demolition waste plant of capacity 500 tonns per day has been installed by M/s IL & FS and is operational at Jahangirpuri for processing of constructional and Demolition waste in Delhi. Processed C & D material is used for tiles/pavement blocks and also ready mix concrete.
- 13 CETPs have been installed and are operational to treat the wastewater from industrial areas. No. of CETPs in1997 i.e. nil.
- STPs having capacity of 542 MGD are being operated by DJB which is higher than earlier. Capacity of STPs in 1997 was 284 MGD.
- Modernized Slaughter houses have come into operation and manual site closed down.
- Authorization has been issued to two compost plants i.e. M/s IL&FS Compost Plant at Okhla and M/s Delhi MSW Solutions Ltd., Narela Bawana Road of capacity 200 MTD & 1500 MTD respectively. APMC Tikri is not operational at present. Existing Compost plant at Bhalsawa is also operational.
- Thermal Power Plants in Delhi have been asked to meet standard of 50 mg/Nm3 for ParticulateMatter in their stack emission which is more stringent than the EPA standard of 150 mg/Nm3.
- IP Thermal Power station has closed its operations and Gas based power plants are being encouraged to come up in Delhi and Rajghat Power Station (Coal based) is planned to close down shortly.
- Consent to establish granted for Interceptor Sewer to trap the untreated water.
- Application for consent under Air Act & Water Act can be submitted on line and is mandatory w.e.f. 05.06.2012. The software is also user friendly and fee can also be deposited online.
- Monitoring and Assessment of CETPs, STPs and Thermal Power Plants are carried out on monthly basis.
Existing units in year 2012 in comparison to year 1997
S. No. / Activity / Year 1997 / Year 20121 / Common Effluent Treatment Plants (CETPs) / Nil / 211.8 MLD
2 / Sewage Treatment Plants (STPs) / 284 MGD / 542 MGD
3 / Slaughter House / One at Idgah (Mannual) / One (Modernized Plant installed at Ghazipur). Idgah Slaughter House has been closed down.
4 / Waste to Energy Plants / Nil / Three (Capacity 50 MW), one operational, two under installation.
5 / Thermal Power Plants / Three (Coal based)
One (Gas based) / Six (Two Coal based and four Gas based).
- One Coal based plant closed down.
- One more Coal based plant likely to be closed shortly.
6 / Compost Plants / One (Capacity 500 Tonnes) / Three plants (Capacity 2200 Tonnes)
7 / Construction and Demolition waste / Nil / One (Capacity 500 TPD)
8 / Interceptor Sewer / Nil / CTE granted for installation of Interceptor Sewer
Information regarding Municipal solid waste in Delhi:
Total Municipal Solid Waste- 6000-9000 ton/day
Existing Processing / Disposal Facility for Municipal Solid Waste
Sanitary Landfill Sites - 4
Composting Plants - 3
Waste to Energy Plants- 3 (1 operational, 2 under installation)
Landfill sites:Authorization Status
Bhalaswa Authorization under MSW Rules Refused
Gazipur Authorization under MSW Rules Refused
OkhlaAuthorization under MSW Rules Refused
Narela Bawana RoadAuthorization under MSW Rules Granted
Compost Plants:
- Nature and Waste Management Pvt. Ltd.,Bhalaswa- 500 TPD
Authorisation under MSW Rules Expired.
- IL&FS Compost Plant at Okhla- 200 TPD
Authorisation under MSW Rules under consideration
- M/s Delhi MSW Solutions Ltd., Narela Bawana Road - 1500 TPD
Authorisation under MSW Rules Granted
[ Final product i.e. compost is around 20%]
Waste to Energy plants
- M/s Timarpur- Okhla Waste Management Company Private Ltd. (operational)- 1300 TPD (16 MW)
Consent to Operate and Authorization under MSW Rules Granted
- M/s Delhi MSW Solutions Ltd, at Narela Bawana Road (under installation)- 3000 TPD (24 MW)
Consent to Establish under Air & Water Act Granted
- M/s East Delhi Waste Processing Company Ltd. , Ghazipur (under installation) - 1300 TPD (10 MW)
Consent to Establish under Air & Water Act Granted
Construction & Demolistion Waste:
C & D Waste Processing Plant of IL&FS plant at Jhangirpuri, Delhi- capacity 500 TPD.
Consent to Operate under Air & Water Act granted and Authorisation under MSW Rules Granted
POWER PLANTS
Sr. No. / Name of power plant / Capacity of power plant / Fuel used / Consent Status / Remarks1. / Badarpur Thermal Power Station / 705 MW / Coal / Consent valid up to 16-02-2013 and
Authorization valid upto 05.09.2015 / Operational
2. / Rajghat Power Station / 67.5X 2 MW / Coal / Consent to Operate valid upto 16.04.2012 and Applied for Authorization on 19.10.2011.
Applied for Renewal of consent to operate applied on 16.04.2012 / Operational,
Rajghat Power Station (Coal based) is planned to close down shortly
3. / Pragati Power Station 1, ITO operated by Pragati Power Corporation Ltd., / 330 MW / Gas / Consent to Operate valid upto 7.12.2013 and Authorization valid upto 31.01.2016 / Operational
4. / I.P. Gas Turbine Power station / 282 MW / Gas / Consent to Operate valid upto 2.12.2013 and Authorization valid upto 31.01.2016 / Operational
5. / Combined Cycle Power Station at sector-11, Rohini, Delhi by NDPL / 108 MW / Gas / Consent to Operate valid upto 1.12.2013 and Authorization valid upto 7.07.2016. / Operational
6. / Pragati Power Station 3, Bawana operated by Pragati Power Corporation Ltd., / 1600 MW / Gas / CTE issued on 19.03.2007 valid for one year.
Applied for consent to operate on 10.06.2011. (Efficacy report of ETP submitted on 08.8.2011)
CTO issued on 20.12.2011 valid up to 09.06.2014. / Partially at operational stage
Compost Plant
S.No. / Name of the unit / Capacity / Consent Status1 / M/s Nature and Waste Management Pvt Ltd. at Bhalaswa / 500 TPD /
- Consent to operate issued on 20.01.2010 & valid upto 26.10.2012.
- Authorization under MSW Rules issued on 21.01.2010 & valid upto 20.01.2012.
2 / M/s IL&FS Compost Plant at Okhla Tank , Mathura Road / 200 TPD /
- Unit has applied for renewal of consent to operate and Authorization under MSW Rules on 13.01.2012.
- As per Consent Committee (Orange) decision dated 09.10.2012, it has been decided to issue show cause notice for the deficiencies and call the Managing Director of the Plant for personal hearing before Chairman, DPCC.
3 / M/s Delhi MSW Solutions Ltd, at Narela Bawana Road, Delhi-39 / 1500 TPD /
- Consent to Operate and Authorization under MSW Rules is extended on 13.07.2012 for the period of six months i.e. upto 12.11.2012.
Sanitary Land Fill Sites
S.No. / Name of the unit / Capacity / Consent Status1 / Bhalswa sanitary land fill site / 1400 TPD /
- Authorization under MSW Rules refused.
2 / Ghazipur sanitary land fill site / 2500 TPD /
- Authorization under MSW Rules refused.
3 / Okhla sanitary land fill site / 1400 TPD /
- Authorization under MSW Rules refused.
4 / M/s Delhi MSW Solution at Narela Bawna Road / 326 TPD /
- Authorization under MSW Rules granted.
Slaughter House
S.No. / Name of the Unit / Consent Status1 / Delhi Food Processing Complex (Meat) at Ghazipur /
- Consent to Establish granted on 14.09.2009.
- Consent to Operate (renewal) valid up to 27.09.2017.
2 / Modern Poultry & Egg market at Ghazipur /
- Consent to Establish issued on 09.02.2010, valid up to 07.02.2011.
Waste to Energy plants
S.No. / Name of the unit / Capacity / Consent Status1 / M/s Timarpur- Okhla Waste Management Company Private Ltd), / 1300 TPD/ (16 MW) /
- Consent to Operate and Authorization under MSW Rules is further extended on 02.07.2012 for the period of six months i.e.valid up to 20.03.2013.
2 / M/s Delhi MSW Solutions Ltd, at Narela Bawana Road Delhi-39 / 3000TPD/
(24 MW) /
- Consent to Establish issued on 17.07.2012 valid up to 16.07.2013.
3 / M/s East Delhi Waste Processing Company Ltd. , Ghazipur / 1300 TPD/
(10 MW) /
- Consent to Establish issued on 08.11.2012 valid up to 07.11.2013.
STATUS OF WTPs IN DELHI
S.No / Name of the unit / Capacity (in MGD) / Consent statusNangloi Water Treatment Plant / 40 /
- Consent to Establish issued on 03.11.08 valid upto 09.10.2009.
- Consent to operate issued on 10.07.2012 valid upto 22.08.2014.
Bhagirathi Water Treatment Plant / 100 /
- Consent to Establish issued on 08.02.10 valid upto 07.02.2011.
- Consent to operate issued on 10.07.2012 valid upto 05.02.2015.
Wazirabad Water Treatment Plant / 120 /
- Consent to Establish issued on 08.02.10 valid upto 07.02.2011.
- Consent to operate issued on 09.02.2011 valid upto 30.09.2013
Chandrawal Water Treatment Plant-I
(35 MGD) / 35 /
- Consent to Establish issued on 08.02.10 valid upto 07.02.2011.
- Consent to operate issued on 01.09.10 valid upto 27.06.2013.
Chandrawal Water Treatment Plant-II
(55 MGD) / 55 /
- Consent to Establish issued on 08.02.10 valid upto 07.02.2011.
- Consent to Operate issued on 01.09.2010 valid upto 27.06.2013.
Sonia Vihar Water Treatment Plant / 140 /
- Consent to establish granted on 18.05.2005 valid upto 30.04.2006.
- Consent to operate granted on 13.03.2007 valid upto 08.12.2009.
- Consent to operate granted on 09.02.2011 valid upto 02.12.2013.
Haiderpur Water Treatment Plant / 200 /
- Consent to Establish issued on 08.02.10 valid upto 07.02.2011.
- Consent to operate (renewal) issued on 15.07.2011 valid upto 07.02.2014.
Status of Sewage Treatment Plantsin Delhi, operated by DJB
S. No / Name/ Location of the unit / Capacity / Consent statusDr. Sen Nursing home Nallah STP / 2.2MGD / Consent to operate renewal issued on 15.07.2011 valid upto 18.04.2014.
Delhi Gate Nallah STP, / 2.2 MGD / Consent to operate renewal issued on 07.05.10 valid upto 02.02.2013
Kondli STP , Ph-I / 10 MGD / Consent to operate renewal for Ph-I 10 MGD issued on 08.02.2010 valid upto 16.08.2012.
Applied for renewal on 16.08.2012. Further action is under process.
Kondli STP, Ph-II / 25 MGD / Consent to Operate renewal for Ph-II 25 MGD issued on 8.02.2010 valid upto 16.08.2012.
Applied for renewal on 16.08.2012. Further action is under process.
Kondli STP, Ph-III / 10 MGD / Consent to operate renewal for Ph-III 10 MGD issued on 22.12.2011 valid up to 30.11.2013.
Nehru Vihar, Oxidation Pond STP / 6 MGD / Consent to operate renewal issued on 28.01.2011 valid up to 19.09.2013.
Keshopur STP / 60 MGD (40+20) / Consent to operate renewal issued on 06.07.2012 valid up to 04.01.2015.
Keshopur STP / 12 MGD / Consent to Establish issued on 06.07.2012 valid upto 05.07.2013. Consent to operate issued on 06.07.2012 valid upto 01.02.2015.
Mehrauli STP / 5 MGD / Consent to operate renewal issued on 28.01.2011 valid upto 12.10.2013.
Yamuna Vihar STP, Phase -I / 10 MGD / Consent to operate renewal issued on 28.01.2011 valid upto 09.11.2013.
Yamuna Vihar STP, Phase -II / 10 MGD / Consent to operate renewal issued on 08.02.10 valid up to 13.12.2012.
Applied for renewal on 13.12.2012. Further action is under process.
Rithala STP– Ph-I, / 40 MGD / Consent to operate renewal issued on 08.02.10 valid upto 30.06.12. Applied for renewal on 02.07.2012. Further action is under process.
Rithala STP– Ph-II, / 40 MGD / Consent to operate renewal issued on 28.01.2011 valid upto 13-12-2013.
Papankalan STP / 20 MGD / Consent to operate renewal issued on 10.02.2011 valid upto 26.12.2013.
Najafgarh STP, / 5 MGD / Consent to operate renewal issued on 10.02.2011 valid upto 26.12.2013.
Nilothi STP / 40 MGD / Consent to operate renewal issued on 4.08.2011 valid upto 1.06.2014.
Rohini STP / 15 MGD / Renewal Consent to operate issued to on 20.12.2011 valid up to 14.04.2014.
Coronation Pillar STP / 40 MGD / Consent to operate renewal issued on 8.02.2010 valid upto 11.03.2012. Applied for renewal on 09.03.2012. Further action is under process.
Letter issued to rectify the deficiencies as per Consent Committee decision dated 11.06.2012 in view of observations made in DPCC lab report.
Vasant Kunj STP / 5.2 MGD / Renewal Consent to operate issued to on 20.12.2011 valid up to 22.03.2014.
Narela STP / 10 MGD / Renewal Consent to operate issued to on 20.12.2011 valid up to 11.01.2014.
Okhla STP , (Phase- I, II, III, IV, V& VI ) i.e. (30+12+45+37 +16+30) MGD / 170 MGD / Applied for renewal of consent for STP, Phase- I, II, III and IV on 7.02.2011. Renewal of Consent to operate issued to Phase I, II and IV on 22.12.2011 valid up to 06.02.2014.
Consent to operate renewal for STP Phase III issued on 12.07.2012 valid up to 06.02.2014.
Consent to operate Renewal for STP Phase- V issued on 28.01.2011 valid upto 06.12.2013
Consent to Establish for STP Phase-VI issued on 22.12.2011 valid up to 21.12.2012
Applied for consent to operate for STP Phase-VI on 02.11.2012. Further action is under process. Further action is under process.
17. / Bakkarwala STP, (3MLD i.e. 0.67 MGD ) / 0.67 MGD / Consent to operate renewal issued on 28.01.2011 valid up to 01.02.2013.
18. / Molar Band STP (3MLD i.e. 0.67 MGD) / 0.67 MGD / Consent to operate renewal issued on 28.01.2011 valid up to 02.09.2013.
19. / Ghitorni STP, / 5 MGD / Not applied for consent. Executive Engineer SDW-V, DJB submitted a reply that STP is neither commissioned as yet nor it is in operation as no sewerage has been connected so far with STP. Letter issued to EE DJB on 28.06.2012 to submit reasons for not receiving the waste water to STP and also to submit application for Consent to Operate.
20. / Kapashera Village / 5.06 MGD / Consent to Establish issued on 22.11.2012 valid up to 21.11.2013.
CETP STATUS
S.No / Name of the unit / Design capacity / Consent and Authorization statusJhilmil & Friends Colony Indl Area CETP
/ 16.8 MLD /
- Consent to Operate (renewal) issued on 07.05.10 and valid upto 03.01.2013.
- Renewal of authorization issued on 09.09.2010 valid upto 08.09.2015.
GTK Road Indl. Area CETP / 6 MLD /
- CTE issued on 20.01.04 valid upto 19.01.05.
- CTO issued on 15.09.04 valid upto 27.07.07.
- Authorization issued on 27.01.2005. Valid upto 26.01.07.
- Not applied for renewal of consent to operate.
- Not applied for renewal of authorization.
- Complaint has been filed in the court for prosecution against the CETP society.
Lawrence Road Indl. Area CETP
/ 12 MLD /
- CTR issued on 11.05.2010 and valid upto 13.12.2010.
- Authorization valid upto 26.01.07. Applied for renewal of authorization under HWM Rules on 06.12.2007.
- Not applied for renewal.
- Applied by post for authorization under HWM Rules without any fee.
Badli Industrial Estate CETP / 12 MLD /
- Renewal of Consent issued on 07.05.2010 and valid upto 29.11.2012
- Renewal of Authorization under HWM Rules issued on 08.10.2010 valid upto 08.10.2015.
- Applied for renewal of consent to operate on 27.11.2012.
Mayapuri Indl. Area CETP
/ 12 MLD /
- Renewal of consent to operate on issued on 10.09.2010 valid upto 05.05.2013.
- Renewal of Authorization under HMW Rules on 09.09.2010 valid upto 08.09.2015.
Mangolpuri Indl. Area CETP
/ 2.4 MLD /
- Consent to operate issued on 01.09.2010 and valid upto 28.06.2013
- Not applied for Authorization under HMW Rules being a biological treatment Plant.
Wazirpur Indl Area CETP / 24 MLD /
- Consent to operate issued on 01.09.2010 and valid upto 11.07.2013.
- Renewal of Authorization under HMW Rules issued on 03.03.11 and valid upto 30.11.2015.
DSIDC Nangloi & Udyog Nagar Indl Area CETP
/ 12 MLD /
- Consent to operate was issued on 01.09.2010 and valid upto 07.06.2013
- Renewal of Authorization under HWM Rules issued on 09.09.2010 and valid upto 08.09.2015
SMA Indl Area CETP
/ 12 MLD /
- Consent to operate issued on 07.09.2010 and valid upto 01.07.2013.
- Renewal of Authorization under HWM Rules issued on 09.09.2010 valid upto 08.09.2015.
Okhla Indl. Area CETP
/ 24 MLD /
- Consent to operate issued on 15.09.2004 and valid up 27.07.07.
- Consent to operate refused on 05.12.2012
- Not applied for renewal of consent.
- Not applied for renewal of authorization under HMW Rules.
Narela Indl. Area CETP
/ 22 MLD /
- Consent to Establish granted on 20.01.04 for a period one year.
- Consent to operate infructuous on 05.11.2012.
- Not applied for Renewal of Consent.
- Not applied for Authorization under HMW Rules.
Udyog Vihar (Bawana) Industrial Area CETP
/ 35 MLD /
- Consent to Establish was granted on 20.01.2004 for a period of one year.
- Consent to operate refused on 20.11.2012.
- Not applied for Consent and Authorization under HMW Rules..
Naraina Industrial Area, CETP
/ 21.6 MLD /
- Consent to Establish granted on 08.11.2012 valid up to 07.11.2013
- Consent to operate refused on10.12.2012.
- Not applied for Consent and Authorization under HMW Rules